Minor Irrigation Department Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Minor Irrigation Department Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date27 Apr 2024
Closing Date27 May 2024
Tender Amount₹ 1,00,12,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Excavation in all kinds of soil including moorum, stoney earth, gravel etc. excepting all kinds of rock & boulders exceeding 0.014cum. in volume for dam base stripping.Cut-off trenches, outfall drains and stripping in borrow areas including rough dressing and dumping the excavated materials away from work site manually including stacking the useful materials with removal of all organic materials such as shrubs, bushes and uprooting of stumps & roots of trees with all leads, lifts & delifts with dewatering including supplying and maintenance of equipments, haul roads and approach roads with all labour and T&P materials required for the item with supervision charges, mobilization, demobilization, all taxes, royalty etc. complete in all respect as per approved design, drawing, & specification as directed by the Engineer –in-Charge. (Measurement is to be taken on finished approved level section).

2969.66

-

193.8

... More
Excavation of hard soils by mechanical means loading into by mechanical means and unloading the soil within initial lead of 2km on properly prepared and scientifically approved surface including spreading and levelling the earth in 22.5cm layers to make ready for watering and compaction with sheep foot rollers and dozers but excluding watering and compaction in dams and dykes for all heights from the stripped surface above down stream filter blanket or cutoff trench as the case may be as per design ,drawing,specification including all leads,delifts ,cost of materials,all taxes ,royalty,mobilisation & demobilisation with construction ,maintenance ,watering and lighting of haul road and borrow area etc.with all materials ,labour and T&P required for the item complete as per the direction of Engineer in Charge .(Measurement of the fill to be taken on finished compacted section)

7852.04

-

122.9

... More
Collecting, supplying,stacking ,clean,sound well graded good quality moorum of approved quality free from all deterious materials at road site for premeasurement in regular box heaps of size 1.5m x 1.5m x 0.5m to be measured as one cum including cost of loading and unloading with cost, conveyance, royalty and all other taxes with all leads, lifts and deliftsand conveying from stacks spreading the same in layers upto required height over compacted earth as per approved design,drawing and specification to proper camber with watering and ramming with all labour and T&P materials required for the item etc. complete in all respect as directed by the Engineer-in-charge.

460.68

-

1698.8

... More
Removing old revetment and approns of all heights and stacking the useful materials aside and repacking with old stones with supply of all labour , T&P materials required for the work with all incidental charges required etc. complete in all respect as directed by the Engineer-in-Charge.(Work with Deptt. stone,No cost of stone will be paid)

107.4

-

1235.6

... More
Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density. Etc complete as per the direction by the Engineer-in-charge

7852.04

-

35.1

... More
Fine dressing of earth work in slope of Dam & canal embankment including trimmed to required profile and turfing with best compacted dub grass sods with all leads and lifts including periodical watering with labour, all other taxes as per prevailing norm and T & P till survival of the turf etc. complete in all respect as directed by the Engineer-in-Charge. (Measurement and Payment will be made on survival of the turf. )

12434.35

-

25.4

... More
Providing rigid shuttering for concrete works with box type steel shuttering plates with keys for intermediate construction joints in rafts of weir , barrage and dam blocks including cost, conveyance, royalty & other taxes of all materials required for the work complete in all respect and curing with water for specified period including depositing the debris clear of work site with all leads & lifts, delfts including supply of all labour, all taxes as per prevailing norm and T & P required for the items of work etc. complete in all respect as directed by Engineer-in-Charge.

3931.32

-

250.1

... More
Providing and constructing gabion structures for erosion control,river training works and protection works with wire crates of size 6m x 1m x1m each divided into 1m compartments by cross netting,made from 4mm galvanised steel wire @ 32 kg per 10 sqm having minimum tensile strength of 300 Mpa confirming to IS:280 and galvanizing coating conforming to IS:4826, woven into mesh with double twist,mesh size not exceeding 100 mm x 120 mm , filled with boulders with least dimension of 200 mm, all loose ends to be securly tied with 4mm galvanised steel wire etc. complete as per the direction of Engineer-in-charge.

120

-

3970.2

... More
Laying of a geotextile filter between gabion wall and embankment on which gabion is placed is laid to prevent escape of the embankment material through the voids of the stone gabion blocks as well as to allow free movement of water without creating any uplift head on pitching.

48

-

77.1

... More
Excavation of foundation in Disintegrated rock not requiring blasting to be removed by pick axes and crow bars and depositing excavated materials manually within 50m initial lead and 1.5m. Initial lift including stacking useful materials separately as per the direction of the Engineer-in-charge.

48

-

445.7

... More
Earthwork in slushy soil ( in water upto 0.60m depth requiring the aid of pans and vessels) within 50m initial lead and 1.5m. Initial lift as per the direction of the Engineer-in-charge.

168

-

179.9

... More
Rough stone dry packing in approns and revetments to all heights,thickness , profile and level using hard granite broken stone of 30cm. and above size weighing 140lbs/cft and above of approved quality, quarried, free from weathered skin including filling the interstices with small stone wedges including cost, conveyance, royality and other taxes of all materials, labour, all taxes as per prevailing norm and T&P alongwith supply of all labour required for the work complete in all respects as directed by the Engineer-in-Charge.

736.89

-

1890.2

... More
Providing rip-rap to the slopes of earth dam and dyke with quarried and blasted granite stone boulders of sizes 0.30m and above size weighing 140lbs/cft and above of approved quality including dumping on slopes, filling interstices with small stones wedges and packing the surface to proper line and levels including fixing wave breakers complete with all leads and lifts including cost, conveyance, royalty and taxes of materials, supply of all labour, all taxes as per prevailing norm and T&P required to complete the work as directed by the Engineer-in-Charge. ( No deduction to be made towards voids in finished section.)

71.4

-

1438.6



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.