Minor Irrigation Department Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Minor Irrigation Department Tender
Civil And Construction
Road Construction
Eprocure
Opening Date22 Aug 2024
Closing Date17 Sep 2024
Tender Amount₹ 1,25,24,441.23 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 1,47,400Document Cost
₹ 10,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEMIB_104346_3Bid Award Id
ViewTender No
BID IDENTIFICATION NO_ACECMIC_02_OF2024_25Tender Authority
Minor Irrigation Department ViewPurchaser Address
-Website
http://http://www.dowrodisha.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Cement Concrete works of M20 with 20 mm Size crusser broken granite metal & down graded of approved quality quarried and free from weathered skin including lifting the materials lowering, hoisting and laying the concrete for required level with curing ramming finishing etc. complete in all respect to proper slope and level & providing expansion joints with cost, conveyance, royalty and other taxes of all materials etc. complete including dewatering as and when necessary as directed by the Engineer-in-Charge.
786.1
5970
4693095.61
... More
Supplying straightening, cutting, bending, binding, fitting and placing uncoated HYSD bar reinforcement of different diameter and laying in position including cost of binding wire 18 to 20 gauge and fixing of reinforcement including lapping where necessary with all leads, lifts from bending yard to placement spot including cost ,conveyance & all taxes of reinforcement as directed by the Engineer-in-charge.
268.78
9081
2440961.16
... More
Rough stone dry packing in aprons revertments to all heights & slope with hard stones other than granites of 30cm and above size (weighting 140 Ibs per cft. And above) quarried and free from weathered skins and of approved quality including filling the interstices with small stones and finishing to proper slope and level with cost, conveyance, royality and other taxes of all materials required for the work etc. complete in all respect as directed by the Engineer-in-charge. (1/6th volume will be deducted towrds viods).
220.29
2099
462454.8
... More
Providing Rigid and smooth centering and shuttering with the box type steel shuttering plates with keys for intermidiate construction joints in rafts of weirs,barrages and dam blocks including dismantling them after casting including cost of materials etc. complete as per direction of the Engineer-in-Charge.
4491.58
289
1301659.88
... More
Filling in foundaiton and plinth with sand including watering and ramming etc.complete including cost, conveyance ,royalty and all other taxes of all materials with supply of all labour and T & P required for the work etc.complete in all respect as directed by the Engineer in Charge
459.5
1318
605804.8
... More
Fine dressing and turfing in slopes of earth dam and embankment including filling of rain cuts and slips with selected earth duly compacted and trimmed to required profile and turfing with approved quality of compact dub grass including collection and supply of the same from approved site, including loading and unloading, conveyance charges, royalty and other taxes on all materials, with all leads, lifts and de-lifts and as per the approved drawings, specifications including mobilization and demobilization, supplying of all machineries and equipments and their running maintenance charges, inclusive of materials and labour required the work, supervision charges, including cost of watering and making arrangements for survival of grass till its full growth etc. complete in all respects as directed by the Engineer-in-charge ( measurement will be taken on full survival of grass turf)
5930
15
91084.8
... More
Excavation ,loading,unloading and carriage by mechanical means of all kinds of soil including stoney earth, gravel and moorum etc interspread with boulders upto 1/2 cum size with all lifts and delifts including trimming of slopes and bed to design section and depositing the excavated materials away from site as per the specification and as directed by the E.I.C within an initial lead of 1km from the place of excavation complete.(Measurement will be taken on finished level section)
31345.25
82
2570310.5
... More
Excavation in all kinds of soil including moorum, stoney earth, gravel etc. excepting all kinds of rock & boulders exceeding 0.014cum in volume for dam base stripping, cut-off trenches, outfall drains and stripping in borrow areas including rough dressing and dumping the excavated materials away from work site manually within 50m initial lead and 1.5m initial lift as per the direction of Engineer-in-charge including stacking of useful materials as directed.
1679.4
247
416155.32
... More
Collecting conveying and stacking the good quality of gravel moorum and conveying from stacks and spreading and consolidation with H.R.R including watering etc including all cost conveyance and royalty etc complete.
109.9
1142
125549.76
... More
Filling foundation and plinth with excavated earth with all leads, lifts & delifts including making arrangement for carriage of water and with cost conveyance of all materials, labour required for the works including watering and ramming etc. complete including cost conveyance etc. complete in all respect as directed by the Engineer-in-charge.
355.82
54
19463.35
... More
Ramming or rolling earth work with light H.R.R. in embankment in layers not exceeding 0.30m with supply of all labour and T&P required for the work etc. complete in all respect as directed by the Engineer in-charge.
15217.9
23
351533.49
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements