Minor Irrigation Department Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
₹ 8,400Document Cost
₹ 4,000Tender Fee
Refer Documents
Summary
Construction Of Mangaljit Mip In Tangi Block Of Khordha District Under Erm Scheme For The Year 2024-25
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_CEMIB_110004_9Tender No
TCN-16-24/25Tender Authority
Minor Irrigation Department ViewPurchaser Address
-Website
http://http://www.dowrodisha.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Cement concrete M-20 using 20mm down graded for R.C.C. works with crusher broken hard granite aggregates of approved quality from approved quarry and free from weathered skin quarry rubbish and foreign materials mixing by concrete mixture including lifting the materials, hoisting, lowering and laying the concrete to required level, with all leads and lifts, compacting in layers of 0.15m thick with vibrator ramming finishing to proper slope and level, finishing the exposed surface smooth including watering ;curing for required period etc.including cost, conveyance royalty and other taxes of all materials labour , T&P materials required for this items including hire running charges of the machineries .complete as directed by the Engineer-in-charge.
55.05
5791
318816.57
... More
Supplying,straightening,cutting, bending, binding and tying the grills and and placing in position for fabrication and fixing of reinforcement ……. complete in all respect .
24.22
9356
226609.59
... More
Providing and removing rigid smooth centring and shuttering for Concrete work including cost and conveyance of the materials required … complete in all respect . (in F&P)
384.03
247
95047.43
... More
Filling in foundation and plinth with excavated earth well watered and rammed with all leads and lifts including making arrangement for carriage of water and with cost, conveyance of all materials required for the work etc. complete as directed by the Engineer in-charge.
54.64
54
2988.81
... More
Excavation of any approved type of soil excluding all rocks in borrow area by manual labour or by mechanical means or by both and transportation/with all leads and lifts unloading the earth on properly prepared and scientifically approved surface including spreading and leveling in the earth in 22.5cm layers ready for watering and rolling with sheep foot rollers or power road droller, excluding watering and compaction in dam and dyke to all heights measured above the unleveled average ground level and including construction & maintenance of coffer dam where and when necessary and construction and maintenance of haul roads and including jungle clearance, trimming the extra partially compacted earth beyond the design section and properly dressing the slope as directed by the Engineer-in-charge.
88.75
117
10437
... More
Excavation,loading,unloading and carriage by mechanical means of all kinds of soil, including stoney earth, gravel and moorum etc interspread with boulders upto 1/2 Cum size ... of slopes and bed to design section and depositing the excavated materials away from work site as directed .
36
82
2952
... More
Providing & filling bitumen,cement and jute fibre in expansion joints inclusive of cost of all materials, bitumen and cement (3:1) including cleaning before pouring 12 mm to 25 mm and 15 cm depth complete in all respect as directed .
20.4
14
290.7
... More
Providing and fixing PVC Pipe in weep holes in c.c. lining walls ,finishing with c.m. (1:3) inclusive of cost of all materials including cutting if required… complete in all respect .
5.6
979
5482.4
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%