Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
₹ 55,700Document Cost
₹ 10,000Tender Fee
Refer Documents
Summary
Utility Shifting For Belgaon Mlp And Dungripalli Mlp Scheme Of Cluster-xiv, Megalift Projects Division, Titilagarh Due To Construction Of Two Lane With Paved Shoulder Including Land Acquisition From Km 56/860 To Km 68/369 Of Nh-59 (rigdol To Belgaon)
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_MoRTH_853346_1Tender No
05 / EE NH (BGR) of 2024-25Tender Authority
Ministry Of Road Transport And Highways ViewPurchaser Address
-
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Unloading of RCC Hume pipe by mechanical means including a lead upto 30m all complete as per direction of the Engineer-in-charge
200
240
48138
... More
Hume Pipe Cost
-
-
-
... More
200 mm dia (1m effective length)
40
591
23661.2
... More
350 mm dia (1m effective length)
80
1765
141247.2
... More
400 mm dia (1m effective length)
40
1961
78470.4
... More
500 mm dia (1m effective length)
40
2452
98088.4
... More
Rubber Ring for RCC Hume Pipe (NP-2 & NP-3) spigot & socket joints pipes
-
-
-
... More
200 mm dia (1m effective length)
21
60
1260.63
... More
350 mm dia (1m effective length)
42
106
4481.82
... More
400 mm dia (1m effective length)
21
180
3781.89
... More
500 mm dia (1m effective length)
21
266
5603.43
... More
Outlets
-
-
-
... More
GI (3mtrs)
7
10000
70000
... More
Outlet Chamber
7
15000
105000
... More
Cement Concrete (1:3:6) using 40mm size hard granite (crusher broken) metal of approved quality from approved quarry including hoisting laying using concrete mixture and vibrators including cost,carriage,royality,cost of all labour,T&P etc complete and as directed by Engineer-in-charge.
73.5
5481
402868.2
... More
R.C.C.work of M35 with 20 mm & down grade black hard granite chips(crusher broken) including hoisting,lowering, laying and compacting concrete, watering and curing and finishing the exposed surfaces smooth,providing grooves or beds where necessary including cost of all materials (exluding cost of tor steel) and cost of all labour with T&P required as per direction of Engineer-in-charge.
181.7
6836
1242119.37
... More
Cutting, bending, binding and laying the grill of approved dia and placing in position of tor steel (IS 7686- 2000) for R.C.C.works and using binding wire 18 to 20 gauge including cost, conveyance, taxes of all materials and labour complete asper direction of Engineer-in-charge.
163.53
8954
1464290.14
... More
Rigid and smooth centering and shuttering for RCC works including false works and dismantling them after casting including cost of material complete for foundation, plinth band and footings bases of columns mass concrete precast slabs.
437
921
402477
... More
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site by mechanical means within a lead of 5 kms. Spreading, grading to required slope and compacting to meet requirement of table 300-2 & clause 305 of MoSRT&H Specifications for Road & Bridge works ( 4th Revision).
50
165
8270
... More
Providing stone riprap to the slopes of earthdam and dyke with quarried and blasted granite stone boulders of size 0.3m and above including dumping on slopes, filling interstices with small stones & wedges and packing surface to proper line and levels including fixing wave breakers complete with all leads & lifts complete as directed by Engineer-in- charge.
32
2347
75123.2
... More
HDPE cost without excavation to be inserted in hume pipe
-
-
-
... More
110 mm dia
50
498
24905.5
... More
200 mm dia
80
1437
115036.8
... More
250 mm dia
100
2160
216029
... More
280 mm dia
50
2661
133075
... More
Hume Pipe cost with excavation
-
-
-
... More
200 mm dia
342
1590
543896.28
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%