Ministry Of Road Transport And Highways Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Ministry Of Road Transport And Highways - MORTH Tender
Other Consultancy Services
Consultancy Services
Civil And Architectural Services
Eprocure
Opening Date4 Oct 2024
Closing Date16 Dec 2024
Tender AmountRefer Documents
Costs
EMD
0Document Cost
₹ 5,900Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_MoRTH_829270_1Bid Award Id
ViewTender No
03-ROBBSR-2024-25/DPRTender Authority
Ministry Of Road Transport And Highways ViewPurchaser Address
-
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Highway Engineer
6
-
-
... More
Material-cum-Geo-technical Engineer
7
-
-
... More
Survey Engineer
8
-
-
... More
Traffic and Safety Expert
5
-
-
... More
Environmental Specialist
5
-
-
... More
Quantity Surveyor
7
-
-
... More
Land Acquisition Expert
10
-
-
... More
Utility Expert
5
-
-
... More
B: Sub Professional Staff (To be assessed by Consultant as per requirement of assignment and one sub-professional be a fresh graduate)
-
-
-
... More
To be filled by Consultant
10
-
-
... More
To be filled by Consultant
10
-
-
... More
To be filled by Consultant
10
-
-
... More
To be filled by Consultant
10
-
-
... More
To be filled by Consultant
10
-
-
... More
To be filled by Consultant
10
-
-
... More
To be filled by Consultant
10
-
-
... More
Support Staff
-
-
-
... More
Office Manager
10
-
-
... More
Typist
10
-
-
... More
Office Boy
10
-
-
... More
Night Watchman
10
-
-
... More
III. Transportation (Fixed costs)
-
-
-
... More
The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc.
A. For use of consultants
10
-
-
... More
Duty Travel to Site (Fixed Costs)
1
-
-
... More
Office Rent (Fixed Costs) The rent cost includes maintenance, Cleaning, repairs, etc.
10
-
-
... More
Office Supplies, Utilities and Communication ( Fixed Costs )
-
-
-
... More
Office Supplies Drafting
10
-
-
... More
Supplies computer
10
-
-
... More
Running Costs
10
-
-
... More
Domestic and International Communication
10
-
-
... More
Office Furniture and Equipment ( Rental )
-
-
-
... More
Office Furniture and Equipment
1
-
-
... More
Reports and Document Printing
-
-
-
... More
Monthly Report (per month)
1
-
-
... More
Inception Report & QAP
1
-
-
... More
Environment and Social Impact
Screening Report
1
-
-
... More
Draft Feasibility Report
1
-
-
... More
Final Feasibility Report
1
-
-
... More
Strip Plan with L.A. Reports
1
-
-
... More
Draft LA and Clearances I Report
1
-
-
... More
Final LA and Clearances I Report
1
-
-
... More
Draft Environmental Assessment report & RAP
1
-
-
... More
Final Environmental Assessment report & RAP
1
-
-
... More
Draft Detailed Design Report & Drawings etc.
1
-
-
... More
Draft EMP
1
-
-
... More
Draft Bidding Documents
1
-
-
... More
Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings ,etc
1
-
-
... More
Final EMP
1
-
-
... More
Final Bidding Documents
1
-
-
... More
Draft 3(a) ,3(A) and 3(D) notification for land acquisition ( 3 copies each)
1
-
-
... More
LA & Clearances II Report
1
-
-
... More
IX Survey and Investigation
-
-
-
... More
Topographic Survey including hire charges for equipment and supply of survey Teams comprising of project survey field staff etc. inclusive of cost of materials , labourer.
1
-
-
... More
Detailed topographic surveys using Air Borne Tomography and Air Borne LiDAR Technology
1
-
-
... More
B. Investigation (Fixed cost)
-
-
-
... More
Road and Bridge Inventory
1
-
-
... More
FWD Test and Pavement Evaluation
1
-
-
... More
Roughness Survey
1
-
-
... More
Axle Load Survey
1
-
-
... More
Material Survey and Investigation
1
-
-
... More
Sub-grade Investigation
1
-
-
... More
Traffic Survey
1
-
-
... More
Socio-economic & Census Survey/ Studies
1
-
-
... More
Land Acquisition Studies
1
-
-
... More
Any other investigations/surveys
1
-
-
... More
Sub-Soil Investigation (Boring)
-
-
-
... More
(a) Boaring in all type of soils (other than hard rock)
1
-
-
... More
(b) Boaring in hard rock
1
-
-
... More
NET WORK SURVEY AND GPR
-
-
-
... More
Net work Survey of the existing Highways as a responsitory for civil work as per direction from Authority
1
-
-
... More
GPR Survey for detection of under ground utilities
1
-
-
... More
Cost of supply and fixing boundary pillars
-
-
-
... More
Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967:Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed at an interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/or construction of New Bypasses, Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval. (lumpsum )
1
-
-
... More
Land acquisition Team including support staff and logistics/transportation
-
-
-
... More
Ex-Land revenue inspector/officer or equivalent
10
-
-
... More
EX-kanoogo/Girdwar or equivalent
10
-
-
... More
Ex-Patwari or equivalent
10
-
-
... More
Typist
10
-
-
... More
Peon
10
-
-
... More
Logistic for Land Acquisition Team
-
-
-
... More
Computer including necessary peripherals
10
-
-
... More
Printer
10
-
-
... More
Vehicles(Bolero or equivalent )with monthly running limit of 4000 km
10
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements