IREL India Limited Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

IREL India Limited Tender

Works
Machinery and Tools
Eprocure
Opening Date2 Nov 2022
Closing Date23 Nov 2022
Tender Amount₹ 65,00,907 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
AMC for Instrumentation Maintenance at Mining and MSP
AMC for Instrumentation Maintenance at Mining and MSP
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Copper Cable 2.5 sq.mm X above 4 core and up to 10 Core or 5 Pair (Armoured)

500

-

-

... More
Copper Cable up to 1.5 Sq. mm X 11 core-40 Core: Armoured

300

-

-

... More
Cable: Communication / Compensating

2000

-

-

... More
Cable Glanding: Poly Carbonate/Metal/Equivalent

200

-

-

... More
Earthing Cable: Wire/ strip

200

-

-

... More
Installation/Dismantling/Replacement of Magnetic Flow meter up to 200 mm NB

12

-

-

... More
Installation/ Dismantling/ Dismantling of Commissioning of Magnetic Flow meter: above 200mm NB - 400 mm NB

4

-

-

... More
Replacement of Earthing Plate of Magnetic Flow Meter

10

-

-

... More
Replacement of Gasket for Magnetic Flow Meter

10

-

-

... More
Functional Testing & Troubleshooting of Magnetic Flow meter

80

-

-

... More
Preventive Maintenance of Magnetic Flow meter with transmitter: Blowering and cleaning, dedusting/Covering and terminal tightness, check the Supply/signal 4-20 mA...etc as per Checklist. PM Checklist report shall be submitted on each occasion.

160

-

-

... More
Installation / Dismantling / Replacement of Density Gauge and Transmitter

24

-

-

... More
Installation / Dismantling / Replacement of Computing Unit / Detector and its accessories

12

-

-

... More
Internal calibration & Report generation of Density Meter

48

-

-

... More
Replacement of Rubber Gasket/ SS Saddle of Density Meter

12

-

-

... More
Functional Testing & Troubleshooting of Density meter

60

-

-

... More
Preventive Maintenance of Density Meter: Blowering and cleaning, dedusting/Covering and terminal tightness …etc as per Checklist. PM Checklist report shall be submitted on each occasion.

160

-

-

... More
Installation / Dismantling / Replacement of RTD/ Thermocouple/ Bi-metallic sensor Element

40

-

-

... More
Installation / Dismantling / Replacement of Temperature Indicator cum Controller

20

-

-

... More
Internal Calibration & Report generation of Temperature Sensor / Temperature Controller

40

-

-

... More
Functional Testing & Troubleshooting of Temperature Measuring System- RTD / Thermocouple / Indicator / controller

80

-

-

... More
Preventive Maintenance of Temperature Controller & Sensor Element: Blowering and cleaning, dedusting/Covering and terminal tightness…etc as per checklist. PM Checklist report shall be submitted on each occasion.

144

-

-

... More
Installation / Dismantling of Pressure Transmitter

40

-

-

... More
Installation / Dismantling of Raiser tube replacement

20

-

-

... More
Installation / Dismantling of Isolation Valve

20

-

-

... More
Internal calibration & report generation of Pressure Transmitter

60

-

-

... More
Functional Testing & Troubleshooting of Pressure Transmitter

80

-

-

... More
Preventive Maintenance of Pressure Transmitter: Blowering and cleaning, dedusting/Covering and terminal tightness…etc as per PM Checklist. PM Checklist shall be submitted on each occasion.

240

-

-

... More
Installation / Dismantling / Replacement of Pinch Control valve

80

-

-

... More
Replacement of Shaft & Brush including Drilling &grinding of shaft

30

-

-

... More
Replacement / Adjustment of Limit switch of Pinch Control Valve

40

-

-

... More
Replacement of Capacitor of Pinch Control Valve

40

-

-

... More
Replacement of Rubber Sleeve of Pinch Control Valve

30

-

-

... More
Replacement & Realignment of gear system of Pinch Control Valve

20

-

-

... More
Replacement of Motor of Pinch Control Valve

20

-

-

... More
Valve Stroke Adjustment of Pinch Control Valve

60

-

-

... More
Overhauling of Pinch Control Valve

40

-

-

... More
Condition Monitoring of Pinch Control Valve

90

-

-

... More
Functional Testing & Troubleshooting of Pinch Type Control Valve

90

-

-

... More
Preventive Maintenance of Pinch Control Valve: Greasing, Oiling, Blowering and cleaning, dedusting/Covering and terminal tightness…etc as pr PM Checklist. PM Checklist Report shall be submitted on each occasion.

192

-

-

... More
Installation/ Dismantling / Replacement of Butterfly Valve

4

-

-

... More
Adjustment &realignment of the gear system of Butterfly Valve

4

-

-

... More
Repairing &realignment of variable register port of Butterfly Valve

6

-

-

... More
Adjustment of Valve Stroke of Butterfly Valve

6

-

-

... More
Overhauling of Butterfly Valve

2

-

-

... More
Functional Testing & Troubleshooting of Butterfly Valve

10

-

-

... More
Preventive Maintenance of Butterfly valve: Greasing, Oiling, Blowering and cleaning, dedusting/Covering and terminal tightness ..etc as per PM checklist. PM Checklist shall be submitted on each occasion.

60

-

-

... More
Installation / Dismantling / Replacement of water flow meter

4

-

-

... More
Repair & Overhauling of Water flow meter

4

-

-

... More
Internal Calibration of Water meter and Report Generation

24

-

-

... More
Functional Testing & Troubleshooting of water flow meter

12

-

-

... More
Preventive Maintenance of Water Flow Meter: cleaning, dedusting/Covering, Installation tightness and terminal tightness ..etc as per PM checklist. PM Checklist shall be submitted on each occasion.

60

-

-

... More
Installation / Dismantling / Replacement of Air flow meter

10

-

-

... More
Repair & Overhauling of Air flow meter

10

-

-

... More
Internal Calibration and Report Generation of Air flow meter

20

-

-

... More
Functional Testing & Troubleshooting of Air flow meter

30

-

-

... More
Preventive Maintenance of Air Flow Meter: cleaning, dedusting/Covering, Installation tightness and terminal tightness ..etc as per PM checklist. PM Checklist shall be submitted on each occasion.

60

-

-

... More
Installation / Dismantling / Replacement of Oil flow meter

10

-

-

... More
Repair & Overhauling of Oil flow meter

10

-

-

... More
Internal Calibration of Oil flow meter

20

-

-

... More
Functional Testing & Troubleshooting of Oil flow meter

30

-

-

... More
Preventive Maintenance of Oil Flow Meter: cleaning, dedusting/Covering, Installation tightness and terminal tightness ..etc as per PM checklist. PM Checklist shall be submitted on each occasion.

60

-

-

... More
Installation / Dismantling / Replacement of pH meter cum controller

6

-

-

... More
Installation / Dismantling / Replacement of pH Electrode

6

-

-

... More
Calibration of pH meter / Conductivity Meter with Buffer Solution & Report Generation

36

-

-

... More
Functional Testing and Troubleshooting of pH meter/Conductivity meter

30

-

-

... More
Preventive Maintenance of pH Meter / Conductivity Meter: Electrode cleaning, Meter- Blowering and cleaning, dedusting/Covering and terminal tightness. Maintenance Schedule to be carried out as per direction of EIC. PM Checklist of Analytical Instruments shall be submitted on each occasion.

40

-

-

... More
Repairing of Panel meter/ PID controller/ transmitter/ Totalizer

60

-

-

... More
Replacement of Electronic Component-register/capacitor/ IC…etc

100

-

-

... More
Replacement of Low-capacity Transformer/motor

30

-

-

... More
Installation /Dismantling /Replacement of Electronic Button or Switch

30

-

-

... More
Replacement of Battery / Fuse / Buzzer

30

-

-

... More
Functional Testing and Troubleshooting of Electronic System

100

-

-

... More
Installation / Dismantling / Replacement of Digital Panel meter / Timer / Counter

90

-

-

... More
Programming of Digital Panel Meter/Timer/ Counter as per process requirement

180

-

-

... More
Functional Testing and Troubleshooting of Digital Panel meter /Timer /Counter

180

-

-

... More
Preventive Maintenance of Digital Panel Meter or Timer: Blowering and cleaning, dedusting/Covering and terminal tightness…as per PM Checklist. PM Checklist of shall be submitted on each occasion.

240

-

-

... More
Installation/Dismantling / Replacement of Digital Totalizer cum Indicator

20

-

-

... More
Programming of Digital Totalizer cum Indicator as per function Requirement

40

-

-

... More
Functional Testing and Troubleshooting of Digital Totalizer

30

-

-

... More
Preventive Maintenance of Digital Totalizer: Blowering and cleaning, dedusting/Covering and terminal tightness…etc as per PM checklist. PM Checklist shall be submitted on each occasion.

60

-

-

... More
Installation / Dismantling / Replacement of Digital Recorder

6

-

-

... More
Programming of Digital Recorder as per process requirement

20

-

-

... More
Functional Testing and Troubleshooting of Digital Recorder

24

-

-

... More
Preventive Maintenance of Digital Recorder: Blowering and cleaning, dedusting/Covering and terminal tightness. Etc as per Pm checklist. PM Checklist r shall be submitted on each occasion.

48

-

-

... More
Installation / Dismantling / Replacement of PID Controller

30

-

-

... More
Programming & Parameter Adjustment of PID Controller as per process requirement

60

-

-

... More
Functional Testing and Troubleshooting of PID Controller

48

-

-

... More
Preventive Maintenance of PID Controllers: Blowering and cleaning, dedusting/Covering and terminal tightness…etc as per PM checklist.PM Checklist shall be submitted on each occasion.

144

-

-

... More
Replacement Solenoid coil, Relay, Joystick, Timer, Variable resistive port, Push Button of Hydraulic Control System

40

-

-

... More
Replacement of Power supply module of Hydraulic Control System

5

-

-

... More
Functional Testing & Troubleshooting of DWUP Instrument system

30

-

-

... More
Preventive Maintenance of DWUP Hydraulic System: Blowering and cleaning, dedusting/Covering and terminal tightness… etc as per PM Checklist. PM Checklist of shall be submitted on each occasion.

30

-

-

... More
Installation / Dismantling /Replacement of Dosing Pump

10

-

-

... More
Installation / Dismantling of Valve Actuator

10

-

-

... More
Replacement, Repairing & Realignment of gear system / Limit Switch

30

-

-

... More
Replacement of Potentio meter port

30

-

-

... More
Replacement of Float Ball

4

-

-

... More
Installation / Dismantling of Servo controller

10

-

-

... More
Programming and Fine tuning of Servo controller

30

-

-

... More
Overhauling of Electric Actuator System

10

-

-

... More
Condition Monitoring of Flotation cell

60

-

-

... More
Functional Testing and troubleshooting Sillimanite Floatation Cell

30

-

-

... More
Preventive Maintenance of Sillimanite Flotation Cell: Blowering and cleaning, dedusting/Covering and terminal tightness… etc as per PM Checklist. PM Checklist of shall be submitted on each occasion.

60

-

-

... More
Installation/ Dismantling / Replacement of Globe Discharge Valve

6

-

-

... More
Condition Monitoring of Column Flotation System

60

-

-

... More
Functional Testing and troubleshooting Column Flotation System

15

-

-

... More
Preventive Maintenance of Column Flotation System: Blowering and cleaning, dedusting/Covering and terminal tightness… etc as per PM Checklist. PM Checklist of shall be submitted on each occasion.

24

-

-

... More
Installation / Dismantling / Replacement of FFD/Park Plug

30

-

-

... More
Installation / Dismantling / Replacement of Modulation Motors of Oil/Air Control system/ Inlet PRV/ Outlet PRV

20

-

-

... More
Replacement/ Dismantling of Burner Gun/ Electrode/ Nozzle

40

-

-

... More
Replacement/Dismantling of Flame Switch / Sequence Controller/ Modulating Controller

20

-

-

... More
Replacement / Dismantling of solenoid Valve/ Solenoid Coil

10

-

-

... More
Replacement / Dismantling of Ignition Transformer

4

-

-

... More
Cleaning of air impulse line from field to Transmitter

40

-

-

... More
Repair of Oil Heater control System

10

-

-

... More
Repair of Air Purging System for Bag Filter

10

-

-

... More
Repair/ Replacement/ Dismantling of Gas Train

6

-

-

... More
Repair/ Replacement/ Dismantling of Oil Train

6

-

-

... More
Functional Testing and Troubleshooting of FBD

75

-

-

... More
Condition Monitoring of FBD system of MUS / GEM / Zircon

60

-

-

... More
Preventive Maintenance of FBD System: Blowering and cleaning, dedusting/Covering and terminal tightness…etc as per PM checklist. PM Checklist shall be submitted on each occasion.

120

-

-

... More
Replacement/Repair / Dismantling of Oil Control valve system

10

-

-

... More
Replacement/ Repair / Dismantling of Combustion Air Control valve

6

-

-

... More
Replacement/Repair / Dismantling of ID FAN Control Valve Actuator

6

-

-

... More
Repair of Oil Heater control System

10

-

-

... More
Replacement/ Repair / Dismantling of Ratio control System

12

-

-

... More
Checking of Field Instrument signal to DAS Panel for Control room operation and monitoring System

24

-

-

... More
Condition Monitoring of Dryer System

60

-

-

... More
Functional Testing and Troubleshooting of Driyer

75

-

-

... More
Preventive Maintenance of DRIYER system: Blowering and cleaning, dedusting/Covering and terminal tightness…etc as per PM checklist. PM Checklist shall be submitted on each occasion.

120

-

-

... More
Installation/Dismantling / Replacement of Auto sampler complete system

20

-

-

... More
Replacement of Solenoid coil, Timer, Limit switch, Motor, Proximity sensor

30

-

-

... More
Replacement of Pneumatic Cylinder, 3/2 Solenoid Valve

12

-

-

... More
Replacement of Valve body, rubber sleeve, shaft, Gear system

20

-

-

... More
Realignment of Gear System

12

-

-

... More
Condition Monitoring of Auto Sampling System

120

-

-

... More
Function Testing and troubleshooting of Auto sampling system

72

-

-

... More
Preventive Maintenance of Auto Sampling System: Blowering and cleaning, dedusting/Covering and terminal tightness…etc as per Pm Checklist. PM Checklist shall be submitted on each occasion.

120

-

-

... More
Installation /Dismantling / Replacement PLC CPU

2

-

-

... More
Replacement/ Dismantling of SMPS, DI / DO/ AI / AO/ Card Rack

15

-

-

... More
Replacement / Dismantling of Relay Unit / Relay Card / Card Battery

15

-

-

... More
Replacement / Dismantling HMI Display

2

-

-

... More
Re-starting of SCADA application S/W/ PLC System

20

-

-

... More
Conditioning Monitoring of PLC and SCADA

120

-

-

... More
Replacement / Dismantling of PLC Based LED Monitor

6

-

-

... More
Checking of Earthing and Supply Voltage PLC Panel

30

-

-

... More
Functional Testing & Troubleshooting PLC System

20

-

-

... More
Preventive Maintenance of PLC & SCADA SYSTEM: Blowering and cleaning, dedusting/Covering and terminal tightness…etc as per PM checklist PM Checklist shall be submitted on each occasion.

60

-

-

... More
Installation/Dismantling/Replacement of Computer System / Server

30

-

-

... More
Installation/Dismantling/Replacement of Printer System

10

-

-

... More
Cleaning of Computer Unit / Printer Unit

60

-

-

... More
Formating and Drivers Installation of computer system

10

-

-

... More
Replacement/ Dismantling of Mother Board / Fan / SMPS / RAM / Hard Disk / Mouse / Key Board / Monitor

30

-

-

... More
Installation / Dismantling / Replacement of Network Rack 6U / 9U / 19 U

6

-

-

... More
Installation / Dismantling / Replacement of Network Switch

20

-

-

... More
Crimping of Network cable like RJ45 / VGA / DVI / HDMI ..etc

60

-

-

... More
Functional Testing and Troubleshooting of Server /Computer/ Printer/ Network System

60

-

-

... More
Preventive Maintenance of Computer and Network System: Blowering and cleaning, dedusting and terminal tightness…etc as per PM checklist. PM Checklist shall be submitted on each occasion.

120

-

-

... More
Loop checking AI /AO / DI / DO signal inside Panel System

60

-

-

... More
Loop checking Copper Signal for Field Instruments to Panel

100

-

-

... More
Loop checking Cooper Power Cable

200

-

-

... More
Loop Checking of Communication cable

100

-

-

... More
Installation / Dismantling/ Replacement of UPS System / stabilizer

20

-

-

... More
Installation / Dismantling / Replacement of Battery

120

-

-

... More
Conditioning Monitoring of system includes Recording of Battery Voltage, UPS input & output Voltage and Backup performance

60

-

-

... More
Functional Testing and Troubleshooting of UPS System /stabilizer

30

-

-

... More
Preventive Maintenance of UPS system / stabilizer: Blowering and cleaning, dedusting/Covering and terminal tightness…etc as per PM checklist PM Checklist shall be submitted on each occasion.

90

-

-

... More
Installation/Dismantling / Replacement of Junction box - Polycarbonate / PVC / SS/ MS / FRP

30

-

-

... More
Fixing/ Removal of DIN Rail with screw or nut bolts

30

-

-

... More
Fixing / Removal of Terminal Block

200

-

-

... More
Fixing / Removal of Terminal End Plate

40

-

-

... More
Fixing / Removal of Terminal Block stopper

40

-

-

... More
Fixing / Removal of Electronic Relays

40

-

-

... More
Fixing / Removal of required Casing Capping /Duct

30

-

-

... More
New Wiring for Junction Box

60

-

-

... More
Installation / Dismantling /Replacement of Pressure/ Vaccum / Bi-metallic gauges

60

-

-

... More
Repair of Pressure / Vaccum / Bi-metallic gauges

30

-

-

... More
Functional Testing and Troubleshooting of Pressure / Vaccum / Bi-metallic gauges

30

-

-

... More
Preventive Maintenance of Gauges: cleaning and dedusting/ Covering …etc as per PM checklist. PM Checklist shall be submitted on each occasion.

60

-

-

... More
Installation/Dismantling / Replacement of level transmitter

12

-

-

... More
Programming of Level Transmitter as per process requirement

20

-

-

... More
Internal Calibration and Report Generation of Level Transmitter

12

-

-

... More
Functional Testing & Troubleshooting of Level Transmitter/Switch

30

-

-

... More
Preventive Maintenance of level transmitter: Blowering and cleaning, dedusting/Covering and terminal tightness, check 4-20mA supply ..etc as per PM checklist. PM Checklist shall be submitted on each occasion.

60

-

-

... More
Installation / Dismantling / Replacement of Differential Pressure Switch

10

-

-

... More
Calibration and Report Generation for of Differential Pressure Switch

10

-

-

... More
Functional Testing and Troubleshooting of DP Switch

12

-

-

... More
Preventive Maintenance of Differential Pressure Switch: Blowering and cleaning, dedusting/Covering and terminal tightness…etc as per PM Checklist. PM Checklist shall be submitted on each occasion.

24

-

-

... More
Weighbridge in Plant & Mining Area - AMC Support

100

-

-

... More
Weighing Scales/Machine - AMC Support

100

-

-

... More
Belt Weigher - AMC Support

100

-

-

... More
Mass Flow meter - AMC Support

160

-

-

... More
MUS FBD - AMC Support

80

-

-

... More
GEM FBD - AMC Support

80

-

-

... More
Electronic Display Board - AMC Support

40

-

-

... More
Flow Meter Calibration - AMC Support

100

-

-

... More
Master Instruments Calibration - AMC Support

20

-

-

... More
UPS System - AMC Support

100

-

-

... More
Auto Sampler System - AMC Support

100

-

-

... More
Bagging Machine - AMC Support

100

-

-

... More
Fire Alarm System - AMC Support

100

-

-

... More
PLC & SCADA System - AMC Support

100

-

-

... More
Installation /Dismantling / Replacement of Weighing Scale

5

-

-

... More
Replacement of Load Cell / Indicator / Communication Cord

10

-

-

... More
Internal Calibration and Report Generation of Weighing scale with minimum 50% of Capacity

30

-

-

... More
Conditioning Monitoring of Weighing Scale with Test Weight of Minimum 50 Kg

60

-

-

... More
Functional Testing of Weighing Scales

30

-

-

... More
Preventive Maintenance of Weighing Scale: Dusting, surface cleanning, Load cell cable tightness …etc as per Pm checklist. PM Checklist shall be submitted on each occasion.

96

-

-

... More
Checking of Earth plate, Load cell, Platform Nut & Bolt and its tightness. Corrective action for optimal Performance

60

-

-

... More
Greasing of Earth plate, Load cell, Platform Nut & Bolt

60

-

-

... More
Replacement of Load Cell

30

-

-

... More
Replacement of RFID / Camera / IR Sensor / NVR / Light Signal / PoE Switch

60

-

-

... More
Calibration cross Checking with Vehicle in all Weighbridge

30

-

-

... More
Conditioning Monitoring of Weighbridge

60

-

-

... More
Functional Testing and Troubleshooting

30

-

-

... More
Preventive Maintenance Weigh bridge- Dusting, surface cleaning of Digitiser, Computer, Printer, Terminal Tightness…etc as per PM checklist. PM Checklist shall be submitted on each occasion.

60

-

-

... More
Installation / Dismantling / Replacement of Belt Weigher

5

-

-

... More
Replacement / Dismantling load cell / Tachometer / Junction Box

10

-

-

... More
Replacement Belt Weigher Panel

5

-

-

... More
Repair of Belt Weigher Panel

10

-

-

... More
Internal calibration & Report Generation - Drop test

60

-

-

... More
Internal Calibration & Report Generation- Complete with Test Chain

30

-

-

... More
Conditioning Monitoring of Belt Weigher

90

-

-

... More
Functional Testing and Troubleshooting of Belt Weigher

30

-

-

... More
Preventive Maintenance of Belt Weigher: Desting, surface cleaning, Load cell cable tightness ..etc as per PM checklist. PM Checklist shall be submitted on each occasion.

96

-

-

... More
Replacement / Dismantling of Load Cell/ Pneumatic Cylinder / Solenoid Valve

20

-

-

... More
Replacement / Dismantling of Clamp Belt Rubber (width- 2'')/ Foot Switch

10

-

-

... More
Replacement / Dismantling of PU Tubes

300

-

-

... More
Repair of Pneumatic Cylinder / Solenoid Valve

10

-

-

... More
Conditioning Monitoring of Auto bagging System

90

-

-

... More
Functional Testing and Troubleshooting of Auto Bagging System

30

-

-

... More
Preventive Maintenance of Bagging System: Desting, surface cleaning, Load cell cable tightness…etc as per PM Checklist. PM Checklist shall be submitted on each occasion.

60

-

-

... More
Replacement of Needle/ Any Parts

45

-

-

... More
Replacement/ realignment of Looper

20

-

-

... More
Replacement of V-Belt

10

-

-

... More
Overhauling of Stitching Machine

30

-

-

... More
Condition Monitoring of Stitching Machine

60

-

-

... More
Functional Testing and Trouble Shooting of Stitching Machine

20

-

-

... More
Preventive Maintenance of stitching: Blowering and cleaning, oiling, dedusting/Covering and terminal tightness. Etc as per PM Checklist .PM Checklist Shall be submitted on each occasion.

60

-

-

... More
Conditional Monitoring of Fire Alarm System - MSP / TS / STORE & WORKSHOP / ADMINISTRATIVE BUILDING / MRSS & LCSS

120

-

-

... More
Functional Testing of Fire Alarm Control Panel /Smoke/ Heat/ multicriteria Detector/Beam detector/Manual Pull Station/Strobe cum Hooter/ Relay Module

30

-

-

... More
Replacement of Smoke/Heat/ multicriteria Detector/Beam detector/Manual Pull Station/Strobe cum Hooter/ Relay Module

30

-

-

... More
Replacement of Fire Alarm Panel

2

-

-

... More
Installation/Dismantling / Replacement of Camera

30

-

-

... More
Replacement of PoE Switch/ Power Supply Module / Media Converter

10

-

-

... More
Replacement of Communication/Power Cord

10

-

-

... More
Replacement of CCTV Surveillance Monitor

20

-

-

... More
Replacement of NVR System

5

-

-

... More
Parameter Fixing of NVR system as per requirement

10

-

-

... More
Condition Monitoring of CCTV base Surveillance System- MSP / GEM / MUS / MINING POND / SMP / DWUP / SECURITY / ADMIN BUILDING / GUEST HOUSE

120

-

-

... More
Function Testing and Troubleshooting of CCTV based Surveillance System

60

-

-

... More
Preventive Maintenance of all camera: Blowering and cleaning, dedusting/Covering and terminal tightness…as per PM Checklist. PM Checklist shall be submitted on each occasion.

120

-

-

... More
Installation/Dismantling / Replacement of Air Regulator /Air Filter / Oil Lubricator

20

-

-

... More
Repair of Air Regulator / Air Filter / Oil Lubricator

20

-

-

... More
Loading and unloading Pressure Setting

30

-

-

... More
Oil Refilling for Compressor

30

-

-

... More
Conditioning Monitoring for Compressor System

60

-

-

... More
Replacement/ Dismantling of condensate drain valve system

10

-

-

... More
Repair of condensate drain valve system

10

-

-

... More
Function Testing and Troubleshooting of Compressor

30

-

-

... More
Preventive Maintenance of compressed air conditioning system: Blowering and cleaning, dedusting and Pipeline tightening…etc as per PM Checklist PM Checklist of Air condition of standalone system shall be submitted on each occasion.

30

-

-

... More
Installation/Dismantling / Replacement of Air Dryer

2

-

-

... More
Replacement/ Dismantling solenoid valve / Solenoid coil

6

-

-

... More
Replacement / repair of Air Drier Control Unit

4

-

-

... More
Function Testing and Troubleshooting of Air Drier System

12

-

-

... More
Preventive Maintenance of Air Drier: Blowering and cleaning, dedusting and covering, part checking…etc as per PM Checklist. PM Checklist shall be submitted on each occasion.

24

-

-

... More
Brush Painting -Primer

200

-

-

... More
Brush Painting -Paint

200

-

-

... More
Surface Preparation- Chipping/sand Paper/ Buffing

400

-

-

... More
Replacement/Fixing / Removal of MCB / SPD / Contactor/ Timer / Relay / Bush Button / Emergency Button

60

-

-

... More
Replacement/ Fixing/ Removal of 5/6 Ams. 3/5 pin Socket(or) 3/5 pin Plug Top/Switch piano type

60

-

-

... More
Replacement/ Fixing / Removal of 15/16 Ams. 3/5 pin Socket (or) 3/5 pin Plug Top/Switch piano type

30

-

-

... More
Replacement / Fixing / removal of Light Fittings / Light / Fan

30

-

-

... More
Fixing / removal of Electrical PVC/ Wooden/ Metal Junction Box - 4'' X 4''/4'' X 6''/4''X10''/6"x12"

30

-

-

... More
Replacement/ fixing / removal of Transformer / Variac / SMPS

15

-

-

... More
Functional testing of Electrical system

100

-

-

... More
Laying & dressing of PVC Conduit pipe

100

-

-

... More
Laying & dressing PVC Casing and Capping on the wall

100

-

-

... More
Laying & dressing Flexible Conduit

100

-

-

... More
Removal of PVC conduit / Casing & Capping / Flexible Conduit

200

-

-

... More
Connection Fittings- Pipe/ casing capping

100

-

-

... More
Laying of GI / MS / SS Pipe

100

-

-

... More
Laying of HDPE Pipe

50

-

-

... More
Fixing of HDPE Fitting

50

-

-

... More
Dismantling and Disposal of old or unused Pipe / casing capping

100

-

-

... More
Dismantling and Disposal of old or HDPE Pipe

60

-

-

... More
Connection of Fittings like- Union/Coupling/Nipple/Elbow/Bend/Tee Equal/Reducer size up to 1/2 ''

50

-

-

... More
Connection of Fittings like- Union/Coupling/Nipple/Elbow/Bend/Tee Equal/Reducer size- above 1/2'' to 1 ''

50

-

-

... More
Junction Box Fixing Bracket up to 2 sq. ft.: Mild steel

20

-

-

... More
Junction Box Fixing Bracket above 2 sq. ft- 4 sq. ft.: Mild Steel

10

-

-

... More
MS Fabrication as per Drawing provided EIC

100

-

-

... More
MS Flange fabrication as per requirement with pipe up to 50 mm

100

-

-

... More
MS Flange Fabrication above 50mm - 100 mm

50

-

-

... More
SS/MS Cover for Field Instruments as per Drawing- max. sheet thickness 3 mm

100

-

-

... More
Laying of MS / GI Cable Tray Ladder Type - 300 mm X 50 mm X 6 mm

50

-

-

... More
Laying of MS / GI Cable Tray Ladder Type- up to 200 X40 X 6 mm

50

-

-

... More
Laying of MS/ Gi cable Tray Fittings

50

-

-

... More
Fixing of MS / GI Tray Support

150

-

-

... More
Laying of FRP Cable Tray Ladder Type - 300 mm X 50 mm X 6 mm

30

-

-

... More
Laying of FRP Cable Tray Ladder Type- up to 200 X40 X 6 mm

30

-

-

... More
Laying of FRP cable Tray Fittings

50

-

-

... More
Fixing of FRP Tray Support of MS material

50

-

-

... More
Removing of old cable from wall/cable tray/Cassing /open area and disposal to designated area as per direction EIC after weighment within area 100 mtr. Inside the plant premises.

200

-

-

... More
Collection of old metal scrap from Plant area and disposal to designated area as per direction EIC after weighment within area 100 mtr. inside the plant premises.

100

-

-

... More
Collection of old electronic waste from Plant area and disposal to designated area as per direction EIC after weighment within area 100 mtr. inside the plant premises.

100

-

-

... More
Preparation soft soil trench of size 30 cm X 30 cm X 30 Cm and refilling after cabling/piping. Etc work

80

-

-

... More
Preparation of Hard soil (RCC) by cutting of size 20 cm X 20 cm X 20 cm and reconditioning to originality by filling with plain concrete after laying of pipe or cable

50

-

-

... More
Replacement/ Dismantling /Installation of Control Panel of Booster Pump

2

-

-

... More
Repair of Booster Pump control system

6

-

-

... More
Functional testing and Troubleshooting of Booster Pump

6

-

-

... More
Installation/ Dismantling / replacement of Replacement of Spillage Alarm Panel System

2

-

-

... More
Replacement of Sensor switch

10

-

-

... More
Conditional Monitoring of Spillage Control System

12

-

-

... More
Functional testing and Troubleshooting of Spillage Alarm System

12

-

-

... More
Preventive Maintenance of Spillage Control System: Blowering and cleaning, dedusting and Pipeline tightening…etc as per PM Checklist PM Checklist shall be submitted on each occasion.

30

-

-

... More
The Work Which are not included in the above List

300

-

-

... More
Replacement / Dismantling / installation of Piezometer

1

-

-

... More
Internal Calibration

5

-

-

... More
Functional Testing & Troubleshooting

5

-

-

... More
Condition Monitoring of Piezometer System

90

-

-

... More
Preventive Maintenance of Piezometer System: Blowering and cleaning, dedusting and Pipeline tightening…etc as per PM Checklist PM Checklist shall be submitted on each occasion.

24

-

-

... More
Installation/ Replacement of IR Occupancy Sensor

12

-

-

... More
Installation /Replacement of Indicator light

10

-

-

... More
Repair/ Installation/ Dismantling of Parking LED Monitor

1

-

-

... More
Functional Testing & Troubleshooting of Smart Parking Facility

12

-

-

... More
Condition Monitoring of Smart Parking Facility

24

-

-

... More
Preventive Maintenance of Smart Parking Facility: Blowering and cleaning, dedusting…etc as per PM Checklist shall be submitted on each occasion.

40

-

-

... More
Installation/ Replacement of Boom

8

-

-

... More
Installation/ Replacement of Motor for Boom barrier

2

-

-

... More
Installation/ Replacement / Repair of Mother Board card/ IR Sensor

6

-

-

... More
Installation/ Replacement of RFID Scanner / Controller

6

-

-

... More
Functional Testing & Troubleshooting of Boom Barrier System

12

-

-

... More
Condition Monitoring of Boom Barrier System

24

-

-

... More
Preventive Maintenance of Boom barrier System: Blowering and cleaning, dedusting …etc as per PM Checklist shall be submitted on each occasion.

40

-

-

... More
Installation/ Replacement / Repair of RF-NIC card

20

-

-

... More
Installation/ Replacement / Repair of DCU-NIC card

10

-

-

... More
Functional Testing & Troubleshooting of Smart Metering System

20

-

-

... More
Condition Monitoring of Smart Metering System

60

-

-

... More
Preventive Maintenance of Smart Metering System: Blowering and cleaning, dedusting …etc as per PM Checklist shall be submitted on each occasion.

40

-

-

... More
Installation/ Replacement / Repair of Signal Light

6

-

-

... More
Installation/ Replacement / Repair of Traffic Camera

6

-

-

... More
Installation/ Replacement / Repair of Traffic Controller

2

-

-

... More
Functional Testing & Troubleshooting of Intelligent Traffic Management System

24

-

-

... More
Condition Monitoring of Intelligent Traffic Management System

60

-

-

... More
Preventive Maintenance of Intelligent Traffic Management System: Blowering and cleaning, dedusting …etc as per PM Checklist shall be submitted on each occasion.

40

-

-

... More
Engagement of one 5 Seated Bolero Camper or TATA Xenon with driver for 8 Hrs Operation from 9:00 AM to 5 PM. The Vehicle shall be of 2019 Model or subsequent.

300

-

-

... More
Kilometer run by the Vehicle :- Fuel Charge shall be reimbursed @ 1Litre for every 12 Kilometers run by the Vehicle

17500

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.