Housing And Urban Development Department Tender
... More
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
Refer DocumentsDocument Cost
₹ 2,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_ORULB_80747_56Bid Award Id
ViewTender No
DHARAMGARH/NAC/01/2022-23Tender Authority
Housing And Urban Development Department ViewPurchaser Address
-Website
http://tendersodisha.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Providing and fixing vertified tiles of size 600mmX600mm coloured or printed series (homogeneous) in floors, treads or steps and landing on 25 mm thick bed of cement mortar (1:1) jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete including cost of precast tiles as directed by the Engineer-in-charge.
103
-
962.52
... More
Labour for supplying, Straightening' cutting, bending, binding and tying the M.S rod and placing in proper position including cost of M.S rod and binding wire etc.complete as per specification and direction of the Engineer-in-charge
3.97
-
8482.6
... More
Cost of display board & other unforseen Items
1
-
24705.52
... More
White washing one coat with shell lime etc.complete including all cost,conveyance,royalty,taxes of all material required for the work complet
108
-
8.67
... More
Providing and fixing Ceramic tiles in dados, skirtings and risers of steps on 12 mm thick cement plaster (1:3) jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete including cost of precast tiles as directed by the Engineer-in-charge
25.92
-
705.43
... More
B. R.C.C Beam, column,grider and brassmeretc
18.22
-
728.43
... More
Finishing wall with water proofing cement paint of approval shade on new work two coatsto given an even shape including all cost etc.complete
108
-
33.43
... More
E/W in foundation in hard soil within 50mt initial lead & 1.5mt initial lift including rough dressing & breaking of clouds to maximum 5cm to 7cm in size & laying in layers not exceeding 0.3mt depth etc.as per direction of Engeneer I/C.
16.63
-
195.4
... More
Providing and fixing Ceramic tiles in floors, treads or steps and landing on 25 mm thick bed of cement mortar (1:1) jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete including cost of precast tiles as directed by the Engineer-in-charge.
7.2
-
726.33
... More
Filling foundation & plinth with coarse sand including watering and ramming & including all cost carriage royalty taxes of sand etc complete.
2.04
-
343.7
... More
Fly ash Brick (23x11x8) Size having crushing stregth not less than 75kg/cm2 with cement mortar (1:6) in foundation plinth
19.61
-
4224.02
... More
Centering,shuttering for CC work including false work and dismantling then after.
22.44
-
116.73
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements