Ground Water Survey And Investigation Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Ground Water Survey And Investigation - GWSI Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date8 Aug 2024
Closing Date20 Aug 2024
Tender Amount₹ 18,32,206 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Lowering of 125mm dia blank PVC pipe 80 Sch. without 3 mtr slot in perfectly vertical position including cost of pipes etc complete

135

147916

1095.68

... More
Lowering of 125mm dia blank PVC pipe 80 Sch. with 3 mtr slot in perfectly vertical position including cost of pipes etc complete

15

16500

1100

... More
Operation of Compressor for development of T/W

5

17555

3511

... More
Supplying and fittingWell Cap 5" Dia

5

5000

1000

... More
Fabrication, carriage & installation of protection chamber made of 18 gauge steel with handle & locking arrangement including denting, priming & colouring with writing of well ID & other dept. information etc. completed

3

45000

15000

... More
Supplying and fitting of 110mm PVC pipes (4 Kg/cm2) of including all cost for socket, bend,solvent,transportation of pipes etc. complete.

300

255942

853.14

... More
Supplying and fitting 160mm x 110mm gate valve and "T" joint

20

30000

1500

... More
Supplying and fitting 160mm x 110mm "T" joint

20

30000

1500

... More
Supplying & laying of 160 mm (OD) PVC Pipes (4 kg / cm2) Including cost for socket, bend, solvent. transportation of pipe etc completed as per direction of E.I.C

232

262923

1133.29

... More
Supplying and fixing of cast Iron Man hole cover of size 0.6m x 0.6m with locking arrangement etc complete.

3

9000

3000

... More
cost and carriage of jally

14

1400

100

... More
Supplying and fitting of MS clamp with painting

100

4000

40

... More
Bell plug

5

5000

1000

... More
Dismentalling of cement concrete including stacking the useful material for reuse and removing the debris within 50.0m lead etc completed as per direction of E.I.C

8.24

6890

836.28

... More
Earth work excavation in stoney earth or gravely soil mixed boulder not exceeding 0.014 cum within 50m initial lead & 1.5m initial lift including rough dressing & breaking clods to minimum 5cm to 7cm etc. completeetc completed as per direction of E.I.C

133.89

56315

420.61

... More
cutting the disintegrated rock not required blasting to be removed by pick axes and crow bars and depositing material within 50 m initial lift including rough dressing etc completed as per direction of EIC2nd depth of 1.5 m (1.5 m to 3.0 m depth)

23.55

15614

663.03

... More
cutting the disintegrated rock not required blasting to be removed by pick axes and crow bars and depositing material within 50 m initial lift including rough dressing etc completed as per direction of EIC3rd depth of 1.5 m (3.0 m to 3.2 m depth)

23.55

16371

695.16

... More
Supplying & lying of R C C Ring 1.5 m. dia. made of 6 mm dia MS rod for storage cum recharge pit including cost, transporting etc completed as per direction of E.I.C

70

98000

1400

... More
Suplying & spreading of Pebbles/Gravels for filter in recharge pit including cost,conveyance,royality etc complete. as per direction of E.I.C

13.24

44971

3396.61

... More
Supplying & spreading of coarse sand for filter in recharge pit including cost, conveyance, royalty etc completed as per direction of E.I.C

2.65

1965

741.8

... More
Filling foundation and plinth with excavated earth well watered & rammed etc completed as per direction of E.I.C

89.22

25017

280.4

... More
Provision for dewatering by Pump

5

5000

1000

... More
Filling foundation and plinth with sand well watered & rammed etc completed as per direction of E.I.C

49.24

28129

571.33

... More
Cement Concrete (1:3:6) using 4 cm size H.G.C.B. metal including cost, conveyance, royalty of materials etc completed as per direction of E.I.C

2.57

15458

6015.07

... More
Brick work with Fly ash Bricks 23cm x 11cm x 8cm size having crushing strength not less than75kg / cm2 in cement mortar (1:6) in F&P including cost, conveyance, royalty of materials etc completed as per direction of E.I.C.

70.07

377495

5387.4

... More
12mm thick cement plaster in CM (1:6) over brick work including cost, conveyance, royalty of materials etc completed as per direction of E.I.C

78.9

14620

185.3

... More
Cement concrete (1:2:4) with 12mm. Size H.G. C.B. chips for RCC works including all cost, conveyance , royalty of materials etc completed as per direction of E.I.C

4.51

34502

7650.32

... More
Supplying, cutting, bending, binding and placing in position HYSD bars reinforcement including cost of binding wire etc completed as per direction of E.I.C

1.57

14613

9307.76

... More
Rigid and smooth centering and shuttering for R.C.C. works including false works and dismentaling then after casting including cost of materials etc completed as per direction of E.I.C

20.13

28891

1435.27

... More
Suppling and Fixing chequred Floor Tiles in floor on 25mm thick Cement mortar (1:1) jointed with neat cement slurry mixed with pigment to match the shades of the tiles including cost, conveyance, taxes and royalty of all materials, labour with T & P complete in all respect etc completed as per direction of E.I.C

23.51

24212

1029.89

... More
Priming One coat with any approved primer including cost of primer for wall surface as per item etc completed as per direction of E.I.C

112.1

7187

64.12

... More
Wall painting 2 coats with weather coat of approved shade on new work to give an even shade on wall surface etc completed as per direction of E.I.C

112.1

11143

99.41



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.