Ground Water Survey And Investigation Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Ground Water Survey And Investigation - GWSI Tender

Civil And Construction
Bridge Construction
Eprocure
Opening Date30 Dec 2022
Closing Date17 Jan 2023
Tender Amount₹ 33,26,022 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Cutting the disintegrated rocks not requiring blasting to be removed by pick axes and craw bars and depositing materials within 50m and 1.5m initial lift including rough dressing as per direction of EIC.

61.23

-

1051.46

... More
Filling the F & P with sand well watered and rammed etc complete

67.54

-

517.36

... More
Cement concrete (1:3:6) with 40 mm. size H.G. Metal -

24.1

-

4741.5

... More
Supplying & fitting & fixing of 110 mm (OD) PVC Pipes (4 kg/cm2) of Including all cost for socket, bend, solvent. transportation of pipes etc complete

360.1

-

642.89

... More
Supplying & fitting & fixing of 160 mm (OD) PVC Pipes(4 kg/cm2) of Including all cost for socket, bend, solvent. transportation of pipes etc complete

341.9

-

1046.09

... More
Site clearance for cutting bushes cleaning the sites etc complete. For engagement of khalashi

104

-

333

... More
Filling of Pebbles/gravels including all cost and transportation etc complete.

20.67

-

2184.11

... More
Cost of 110 mm. dia. PVC Gate valve & 'T' joint 8x8nos

39

-

1400

... More
Supplying & Laying of R C C Ring 5ft made up of 6 mm dia MS rod for storage cum recharge pit including cost, transporting etc complete.

221

-

1400

... More
K.B. Brick masonry in C.M. (1:6) including cost,carriage,royalty of all materials & all labour charges etc. complete.17nosx8

52.95

-

4465.61

... More
Centering,shuttering work for RCC work -

62.92

-

418.9

... More
C.C. (1:2:4) with 12 mm. size crusher broken granite chips including cost, carriage, royalty of all materials and all labour charges etc complete

14.78

-

6143.45

... More
Cost of MS steel for reinforcement including cost of cutting ,bending, binding with cost of binding wire etc.

5.73

-

9124.09

... More
12 mm. thick cement plaster over brick work in C.M. (1:6) -

520

-

149.7

... More
Fitting ofVitrified tiles on floor on 25 mm thick bed of cement mortar 1:1 including cost,carriage,royalty of all materials & all labour charges etc. complete.

152.85

-

1204.32

... More
Primer one coat over wall surface -

520

-

62.79

... More
Wall painting two coats with weather paint of approved shade on wall surface -

520

-

77.02

... More
Cost of Mainhole cover of size 0.60x0.60 m with locking arrangement

13

-

2420.52

... More
Transportation of excavated materials away from site etc. complete.

134.66

-

207.5

... More
Drilling a perfectly vertical 150 mm dia bore hole in hard rock formation from ground level 8x30

390

-

650

... More
Drilling of 100 mm dia bore hole in hard rock formation .8x20

260

-

650

... More
Lowering of 125 mm dia PVC casing pipe without slots in perfectly vertical position including cost of pipe etc complete.8x27

351

-

1063.2

... More
Lowering of 125 mm dia PVC casing pipe with or without slots in perfectly vertical position including cost of pipe etc complete.27x06m

39

-

1074.7

... More
washing and development of well by compressor

13

-

3511

... More
fitting of ms well cap including cost ,labour etc complete 6 sites

13

-

580

... More
cutting of 125mm manhole cover, 6 sites

13

-

500

... More
supplying and fixing of plate 3ftx2.5 ft including gi plate,1.5 inch angle and labour charges,transportation,fabrication colouring writing etc complete 6 sites

13

-

5019.45

... More
Supplying and fixing of protection box 18 gouge ms sheet size .75mx.75mx.95/.90mincluding ,1.0inch angle and labour charges ,transportation fabrication colouring writing etc, complete

13

-

15000



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.