Ground Water Survey And Investigation Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Ground Water Survey And Investigation - GWSI Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date6 Jul 2024
Closing Date15 Jul 2024
Tender Amount₹ 14,40,821 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
3rd depth - 1 x 1x π x 1.00 2 x 0.9 m = 2.827 cum

11.28

12292

1089.77

... More
Filling the F & P with sand well watered and rammed etc complete

33.68

26274

780.13

... More
Cement concrete (1:3:6) with 40 mm. size H.G. Metal -

3.48

20817

5981.97

... More
Supplying & fitting & fixing of 110 mm (OD) PVC Pipes (4 kg/cm2) of Including all cost for socket, bend, solvent. transportation of pipes etc complete

242.91

218378

899.01

... More
Supplying & laying & fixing of 150 mm (OD) PVC Pipes (4 kg/cm2) of Including all cost for socket, bend, solvent. transportation of pipes etc complete .

224.03

349934

1562

... More
Supplying & fitting of 100 x 150 mm. R/S - 06 Nos.

24

14400

600

... More
Site clearance for cutting bushes cleaning the sites etc complete. (30X30)=900Sqm

3600

9828

2.73

... More
Filling of Pebbles/gravels including all cost and transportation etc complete.

22.64

67478

2980.5

... More
Cost of 110 mm. dia. PVC Gate valve & 'T' joint - 06 Nos.

24

36000

1500

... More
Lying of R C C Ring 5ft made up of 6 mm dia MS rod for storage cum recharge pit including cost, transporting etc complete. (01 x 15) = 15 Nos.

60

84000

1400

... More
F.A. Brick masonry in C.M. (1:6) including cost,carriage,royalty of all materials & all labour charges etc. complete.

11.52

60356

5239.27

... More
Rigid smooth Centering,shuttering work for RCC work -

11.56

8988

777.55

... More
C.C. (1:2:4) with 12 mm. size crusher broken granite chips including cost, carriage, royalty of all materials and all labour charges etc complete

8.48

61651

7270.21

... More
Cost of MS steel for reinforcement including cost of cutting ,bending, binding with cost of binding wire etc.

1.6

13318

8324.34

... More
12 mm. thick cement plaster over brick work in C.M. (1:6) -

45.28

8468

187.02

... More
Fitting of Vitrified tiles on floor on 25 mm thick bed of cement mortar 1:1 including cost,carriage,royalty of all materials & all labour charges etc. complete.

17.64

25565

1449.3

... More
Primer one coat over wall surface -

27.64

2185

79.06

... More
Wall painting two coats with weather paint of approved shade on wall surface -

27.64

2644

95.68

... More
Supplying & fitting of Mainhole cover of size 0.60x0.60 m with locking arrangement

4

10000

2500

... More
Transportation of excavated materials away from site etc. complete.

86.88

12180

140.2

... More
Drilling a perfectly vertical 150 mm dia bore hole in hard rock formation from ground level - 1 x 30.00 = 30.00 Mtr.

120

78000

650

... More
Drilling of 100 mm dia bore hole in hard rock formation- 1 x 20.00 = 20.00 Mtrs.

80

52000

650

... More
Supplying & lowering of 125 mm dia PVC casing pipe without slots in perfectly vertical position including cost of pipe etc complete - 1 x 30.60 = 30.60 Mtrs,

88.8

94412

1063.2

... More
Supplying and fixing of plate 3feetx2.5feet including of GI plate,1.5inch angle and labour charges ,transportation fabrication colouring writing etc, complete

4

36000

9000

... More
Supplying & fitting of MS well Cap - 1 x1 = 1 Nos.

4

2000

500

... More
Fabrication,Carraige & Installation Of Protection Chamber made of 18 gauge steel with handle & locking arrahgements including denting,priming & colouring with writing of well id & other deptt. information etc.

4

60000

15000



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.