Forest Environment And Climate Change Department Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
Refer DocumentsDocument Cost
₹ 6,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_DFOD_82322_6Bid Award Id
ViewTender No
02/2022-23Tender Authority
Forest Environment And Climate Change Department ViewPurchaser Address
-Website
http://tendersodisha.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
D.P.C.2.5cm thick with C.C(1:2:4)using 12mm size h.g.chips etc. complete.
22.29
-
295.63
L.S. masonry in CM(1:6) using Laterite Stone in foundation & Plinth of all materials and labour.
13.11
-
4375.65
Flyash Brick masonry in CM(1:6) using 1st. class brick in superstructure.
39.67
-
4293.79
1st Floor
18.77
-
4567.04
2nd Floor
2.71
-
4881.28
3rd Floor
2.71
-
5242.65
Cement Concret(1:2:4) using 12mm chips size for R C C work including hoisting and laying etc complete
26.2
-
6258.34
1st Floor
6.98
-
6568.89
2nd Floor
4.59
-
6926.02
3rd Floor
3.64
-
7336.02
Rigid and smooth cetering and shuttering for R.C.C.work (G.Floor) Lintel
4.82
-
509.5
1st Floor
2.16
-
509.5
Roof Slab (G.Floor)
47.84
-
440.46
1st Floor
21.65
-
440.46
2nd Floor
14.06
-
440.46
3rd Floor
14.06
-
440.46
Stair (G.Floor)
9.46
-
613.82
1st Floor
9.46
-
613.82
2nd Floor
9.46
-
613.82
Column (G.Floor)
37.01
-
750.72
1st Floor
18.51
-
750.72
2nd Floor
12.34
-
750.72
3rd Floor
12.34
-
750.72
Roof Beam (G.Floor)
29.6
-
750.72
1st Floor
14.79
-
750.72
2nd Floor
7.12
-
750.72
3rd Floor
7.12
-
750.72
Tile flooring in C.C (1:2:4) using 12mm size h.g.chips including pulishing etc. complete.
1417.11
-
70
ChequeredTile flooring in C.C (1:2:4) using 12mm size h.g.chips including pulishing etc. complete.
799.62
-
50
Cement choukaths in doors and windows (G.floor)
0.27
-
47605.07
1st Floor
0.11
-
47605.07
32mm thick local piasalwood pannelled shutters of doors and windows including fitting & fixing. (G.floor)
10.98
-
4058.57
1st Floor
4.6
-
4058.57
Painting two coats with any approved paint to new woodwork over one coat of primer including cost of labour and painting materials etc. (G.floor)
32.82
-
138.28
1st Floor
13.48
-
138.28
Painting two coats with any approved paint to new iron work over one coat of primer including cost of labour and painting materials etc.
16.35
-
138.28
1st Floor
5.11
-
138.28
Cost of M.S.Rod in R.C.C. work including bending and tying the grill including cost of labour binding wire etc.complete
28.82
-
10684.47
1st Floor
7.68
-
10684.47
2nd Floor
4.82
-
10684.47
3rd Floor
3.82
-
10684.47
16mm thick cement plaster in CM(1:6) over brick work including cost of labour and materials etc.complete (G.floor)
240.16
-
204.22
1st Floor
146.46
-
212.63
2nd Floor
22.98
-
221.46
3rd Floor
22.98
-
230.73
Distempering two coats including labour charges ,cost of distemper, brushes, and putty etc. complete. (G.floor)
240.16
-
65.35
1st Floor
146.46
-
65.35
2nd Floor
22.98
-
65.35
3rd Floor
22.98
-
65.35
Cement painting two coats including 'labour chages ,cost of paint,brushes,and putty etc. complete. (G.floor)
240.16
-
33.43
1st Floor
146.46
-
34.15
2nd Floor
22.98
-
34.9
3rd Floor
22.98
-
35.68
6mm thick graded cement plaster in C.M(1:4) over R.C.C roof slab with water proofing compound etc. complete 3rd Floor
14.06
-
404.66
Supplying,fitting & fixing of window grill verandah grill ,gate in position etc.complete. (G.floor)
48.31
-
110
1st Floor
18.58
-
110
Add for Electrification 10%
1
-
80000
Add for Sanitary fittings 10%
1
-
80000
Contigency
1
-
2997.59