Forest Environment And Climate Change Department Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Forest Environment And Climate Change Department Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date6 Feb 2025
Closing Soon11 Feb 2025
Tender Amount₹ 1,30,74,139 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Filling foundation & plinth with excavated earth required depth including dressing, levelling the bed and depositing the excavated materials away from work site including cost of labour and T&P etc. complete.

839.23

150

126337.68

... More
Supplying and filling in foundation trenches and plinth, ditches with sand well watered and rammed in layers not exceeding 23 cm. in depth with all lead and lift including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour,labour cess, sundries, T&P required for the work etc. complete in all respect as per direction by the Engineer in charge .

168.88

718

121304.82

... More
Cement Concrete(1:3:6) in foundation using 40mm size h.g. Metal of approved quality & from approved quarry including watering & curing with Cost, Conveyance, Royalties and Taxes of all materials and cost of all labour with T&P required for the work etc. complete.

72.36

6680

483406.77

... More
Providing and laying cement concrete (1:2:4) using 12 mm size hard granite crusher broken metal and sharp sand of approved quality from approved quarry, mixing, hoisting, lowering, laying, compacting and curing for specified days with cost, conveyance, royalty and taxes of all materials and cost of all labour, T&P, workers welfare cess etc. complete as per approved specification and direction of the Engineer -in- Charge

30

8351

250549.5

... More
Fly Ash brick masonry in cement mortar (1:6) in foundation & plinth using Fly Ash bricks of 23 x 11 x 8 cm size having a crushing strength of not less than 75 kg./sqcm with dimensional tolerance ± 2% including splays cutting circular moulding chamfering and corbelling and similar such type of works with all necessary projections watering and curing after immersing the bricks in water at least for six hours before use including cost, conveyance, and royalties of all materials with all labour,labour cess and T & P required for the work complete in all respect as per direction of Engineer-in-Charge

45.38

5998

272201.95

... More
Providing and laying in position specified grade of reinforced cement concrete, including the cost of centering, shuttering, finishing and reinforcement-All work up to plinth level: ( for works upto below 1.5 m below the ground lvl.)1 : 1. 5: 3 ( 1 cement : 1. 5 coarse sand (zone-Ill): 3 graded stone aggregate 20 mm nominal size) wherever necessary including cost, conveyance, loading, unloading, royalties and taxes of all materials and cost of all labours, sundries,required for the work all completed as per direction of the Engineer in charge. (A) Column Foundation (Sub Structure)

21.94

6925

151950.74

... More
(B ) Column in Superstructure

14.38

16185

232747.2

... More
(C ) Plinth Beam

10.38

7913

82144.62

... More
(D ) Lintel

4.83

14659

70805.39

... More
(E ) Chajja

1.07

10452

11184.03

... More
(F ) Roof Slab

27.5

14225

391214.18

... More
G ) Roof Beam

11.95

16188

193452.34

... More
Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etccomplete in all respect. Note:- Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. required for the work all completed as per direction of the Engineer in charge. ( NOTE:- steel items used in work should be of SAIL,TATA,or equivalant best quality steels brand.) Thermo-Mechanically Treated bars of grade Fe-500D or more.)

152.2

8835

1344703.74

... More
Fly Ash brick masonry in cement mortar (1:6) in Superstructure using Fly Ash bricks of 23 x 11 x 8 cm size having a crushing strength of not less than 75 kg./sqcm with dimensional tolerance ± 2% including splays cutting circular moulding chamfering and corbelling and similar such type of works with all necessary projections watering and curing after immersing the bricks in water at least for six hours before use including cost, conveyance, and royalties of all materials with all labour,labour cess and T & P required for the work complete in all respect as per direction of Engineer-in-Charge

100.32

6092

611149.44

... More
12mm thick Cement Plaster (1:6) in all floors finished smooth to outside surface of walls after raking out the joints including watering & curing with Cost, Conveyance, Royalties, Taxes of all materials and Cost of all labour with T&P etc. complete.

484.1

215

104386.48

... More
16mm thick Cement Plaster (1:6) in all floors finished smooth to inside rough surface of 10" thick brick walls after raking out the joints including watering & curing with Cost, Conveyance, Royalties & Taxes of all materials and Cost of all labour with T&P etc. complete.

261.3

275

71878.4

... More
6mm thick Cement plaster(1:4) to smooth R.C.C. Surface with deep chipping including all cost of labour, T&P, Taxes, Cost of all materials etc. complete.

180

214

38520

... More
Supplying, fitting & fixing M.S.Grill & Sliding Gate in position including all cost of labour, T&P, Taxes, Cost of all materials etc.complete as per approved specification and direction of the Engineer -in- Charge.

5615.07

127

717437.49

... More
Synthetic Enamel Painting two coats over a coat of primer on iron work/wood work of M.S. Door, Window & Grill, Gate including all cost of labour, T&P, Cost of all materials, Taxes etc. complete.

171.9

260

44749.01

... More
Finishing wall with water proofing weather coat paint of approved shade on new works two coats with one coat primer to give an even shade including cost of paint and cost of all labour, T&P, workers welfare cess etc. complete as per approved specification and direction of the Engineer -in- Charge.

928.1

180

167095.12

... More
Finishing wall surface of walls with Acrylic wall putty (water based) of approved Make & finished smooth and even surface to receive painting including cost of Scaffolding staging charges with cost of all materials taxes, labour T&P etc complete.

928.1

109

101227.87

... More
Supplying ,fitting and fixing KOTA Tiles in in flooors of size of approved make confirming to IS: 13755 laid on 20mm thick cement mortar ( 1:4 ) and filling joints with white cement of approved quality including cost of all materials, labour , T & P etc. required for the work all complete as per approved specification and direction of Engineer-in-Charge.

210

866

182067.9

... More
Providing and laying 2.5 cm thick grading concerte(1:2:2) on roof slab with 4.7 mm size H.G. crusher broken chips and sharp sand of approved quality from approved quarry, mixing, hoisting, lowering, laying, compacting and curing for specified days with cost, conveyance, royalty and taxes of all materials and cost of all labour, T&P, workers welfare cess etc. complete as per approved specification and direction of the Engineer -in- Charge

210

404

84840

... More
SUB HEAD -02 BACK KRAAL Earthwork in excavation of foundation in all kind soil including rough dressing, levelling the foundation bed including shoring, shuttering & dewatering if required and laying the excavated earth in layers not exceeding 0.30m depth in the specified filling sections, rough dressing and breaking clods to maximum 5 cm to 7 cm and disposing the excess earth away from worksite with cost of all labour, T&P and workers welfare cess etc. complete and as per the direction of the Engineer-in-charge

40.56

270

10987.7

... More
Earth filling work upto 1200 mm height to uplift the room heights from existing ground lvl. NOTE:- supply and compact the earth volume of earth from trench excavation etc. to be included from the supply earth. required for the work all completed as per direction of the Engineer in charge.

607.84

150

91479.92

... More
Supply and stacking of GOOD EARTH , including carriage, loading , unloading & stacking up to any lead (since site is in city so rates are taken for 28 km)

968.4

247

240153.52

... More
Cement Concrete(1:3:6) in foundation using 40mm size h.g. Metal of approved quality & from approved quarry including watering & curing with Cost, Conveyance, Royalties and Taxes of all materials and cost of all labour with T&P required for the work etc. complete.

44.55

6680

297619.84

... More
Supplying and filling in foundation trenches and plinth, ditches with sand well watered and rammed in layers not exceeding 23 cm. in depth with all lead and lift including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour,labour cess, sundries, T&P required for the work etc. complete in all respect as per direction by the Engineer in charge .

176.21

718

126569.88

... More
Fly Ash brick masonry in cement mortar (1:6) in Superstructure using Fly Ash bricks of 23 x 11 x 8 cm size having a crushing strength of not less than 75 kg./sqcm with dimensional tolerance ± 2% including splays cutting circular moulding chamfering and corbelling and similar such type of works with all necessary projections watering and curing after immersing the bricks in water at least for six hours before use including cost, conveyance, and royalties of all materials with all labour,labour cess and T & P required for the work complete in all respect as per direction of Engineer-in-Charge

43.2

5998

259126.56

... More
Fly Ash brick masonry in cement mortar (1:6) in Superstructure using Fly Ash bricks of 23 x 11 x 8 cm size having a crushing strength of not less than 75 kg./sqcm with dimensional tolerance ± 2% including splays cutting circular moulding chamfering and corbelling and similar such type of works with all necessary projections watering and curing after immersing the bricks in water at least for six hours before use including cost, conveyance, and royalties of all materials with all labour,labour cess and T & P required for the work complete in all respect as per direction of Engineer-in-Charge

48

6092

292416

... More
16mm thick Cement Plaster (1:6) in all floors finished smooth to inside rough surface of 10" thick brick walls after raking out the joints including watering & curing with Cost, Conveyance, Royalties & Taxes of all materials and Cost of all labour with T&P etc. complete.

384

275

105630.72

... More
Providing and laying cement concrete (1:2:4) using 12 mm size hard granite crusher broken metal and sharp sand of approved quality from approved quarry, mixing, hoisting, lowering, laying, compacting and curing for specified days with cost, conveyance, royalty and taxes of all materials and cost of all labour, T&P, workers welfare cess etc. complete as per approved specification and direction of the Engineer -in- Charge

1.08

8351

9019.78

... More
Providing and laying in position specified grade of reinforced cement concrete, including the cost of centering, shuttering, finishing and reinforcement-All work up to plinth level: ( for works upto below 1.5 m below the ground lvl.)1 : 1. 5: 3 ( 1 cement : 1. 5 coarse sand (zone-Ill): 3 graded stone aggregate 20 mm nominal size) wherever necessary including cost, conveyance, loading, unloading, royalties and taxes of all materials and cost of all labours, sundries,required for the work all completed as per direction of the Engineer in charge. (A) Column Foundation (Sub Structure)

45

6925

311658.3

... More
(B ) Column in Superstructure

33.13

16185

536224.95

... More
(C ) Plinth Beam

11.05

7913

87446.83

... More
Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect. Note:- Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. required for the work all completed as per direction of the Engineer in charge.

79.08

8835

698680.5

... More
Supplying & fixing Mild Steel work in built up tubular (round, square or rectangular hollow tubes etc.) (TATA ) as per approved quality and specified including all hoisting, fixing trusses, joists placing in position Iron work wrought and put in trusses and record racks complete. Including base plate , bolt & cleat drilling hole necessary cost, conveyance , royalties of all materials . as per final approved drawing by the department . Instruction of the Engineer -in Charge.

7938.61

158

1259460.48

... More
Supplying fitting and fixing of G.I. chain link mesh (TATA) of size ( 2" x 2" x 8 Gauge) to cover the Structure work including cost of materials with labour cost , T&P etc. required for the work all complete in all respect as per direction of the Engineer in charge .

1000

1124

1124330

... More
Synthetic Enamel Painting two coats over a coat of primer with approved paint on Iron work after scrapping, sand papering the surface and cleaning with surf and soda etc. with cost, conveyance, taxes of all materials and cost of all labour, T&P, brushes, workers welfare cess etc. complete as per approved specification and direction of the Engineer -in- Charge.

1000

260

260320

... More
Add for Sanitary & P.H Works

1

871609

871609.25

... More
Add for Internal E.I Works

1

581034

581034.34



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.