Forest Environment And Climate Change Department Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Forest Environment And Climate Change Department Tender

Civil And Construction
Building Construction
Eprocure
Opening Date12 Aug 2022
Closing Date25 Aug 2022
Tender Amount₹ 14,28,231 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Sand filling in foundation & plinth using coarse sand including watering & compaction etc. complete as direction of Engineer-In-Charge.

-

-

-

... More
Forester Quarter

42.96

25424

591.81

... More
Swearage Tank

0.82

485

591.81

... More
Cement concrete (1:3:6) using 4cm hg metal including cost of labour & materials etc complete as direction of Engineer-In-Charge.

-

-

-

... More
Forester Quarter

7.35

40380

5494.01

... More
Swearage Tank

0.25

1373

5494.01

... More
2.5 cm DPC with CC (1:2:4) using 12 mm BHGCB chips etc. complete as direction of Engineer-In-charge

15.04

4724

314.12

... More
Cement concrete (1:1.5:3) using 12mm chips for PCC work in flooring including hoisting & laying etc complete as direction of Engineer-In-Charge.

-

-

-

... More
Swearage Tank

0.36

2861

7949.26

... More
Fly ash brick in CM(1:6) using 1st class brick in foundation & plinth including cost of labour & materials etc. complete as direction of Engineer-In-charge (Foundation)

-

-

-

... More
Forester Quarter

5.8

29497

5085.86

... More
Fly ash brick masonary in cm(1:6) using 1st class brick in superstructure (GF)

-

-

-

... More
Forester Quarter

31.16

159503

5118.86

... More
Swearage Tank

2.58

13121

5085.86

... More
Cement concrete (1:1.5:3) using 12 mm chips for RCC work including hoisting & laying etc. complete as direction of Engineer-In-Charge. (GF)

-

-

-

... More
Forester Quarter

27.73

220432

7949.26

... More
Swerage tank

0.25

1987

7949.26

... More
Rigid smooth centering & shutering for RCC Work

-

-

-

... More
Coloumn(GF)

60.45

46898

775.82

... More
lintell(GF)

24.75

7254

293.13

... More
Roof Slab(Gf)

76.11

35541

466.97

... More
Chhaja Out side

7.86

3670

466.97

... More
Plinth Band

41.06

4709

114.71

... More
swerage tank

3.25

1517

466.97

... More
Construction of Soakpit

1

3239

3239.85

... More
16mm thick cement plaster in CM (1:6) over brick work etc. complete. (GF)

-

-

-

... More
Forester Quarter

445

93912

211.04

... More
Swearage Tank

12.26

2587

211.04

... More
20 mm thick cement(1:4) graded over RCC roof slab with water proofing compound

-

-

-

... More
Forester Quarter

82.02

19758

240.9

... More
Distempering two coats inside

-

-

-

... More
Forester Quarter

273.63

11060

40.42

... More
Two coats of Cement Paint outside

160.6

5492

34.2

... More
Supply fitting of Ventelator grill door etc complete as direction of Engineer-IN-Charge.

1045.68

135938

130

... More
Painting two coats to iron work with any approved paint

34.86

4853

139.23

... More
MS Rod

-

-

-

... More
Forester Quarter

30.51

357271

11709.97

... More
Swearage Tank

0.17

1990

11709.97

... More
Tiles work for flooring & wall using good quality of tiles

-

-

-

... More
Floor Tiles

57.55

86123

1496.49

... More
Wall Tiles

18.67

14679

786.26

... More
Installation of precast Cement Bandha in door area

4

6000

1500

... More
Installation of Precast PVC doors in specified area for door

4

16000

4000

... More
For electrical work

1

32600

32600.15

... More
For PH work

1

30370

30370



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.