Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
₹ 13,000Document Cost
₹ 6,000Tender Fee
Refer Documents
Summary
Construction Of Forest Guard Quarters - 1 No. At Kutikia In Balliguda Range
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_DFOBA_108472_2Tender No
DFO,BLG 02/2024-25Tender Authority
Forest Environment And Climate Change Department ViewPurchaser Address
-Website
http://tendersodisha.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Fly ash brick work in cement mortar (1:6) after immersing brick for six hours in water before use in F&P with good quality of brick 23cm x 11 cm x 8 cm size having crushing strength not less than 75Kg. Per Sqm. Including splays cutting circular molding and similar such type of work with necessary projections, chamfering and corbelling watering and curing etc. complete including cost conveyance and Royalty, Cess of all materials with all taxes and all labour with T&P articles required for the work etc. complete as per specification and direction of the Engineer-in-charge.
19.57
5784
113194.15
... More
R.C.C.work of M-20 in column base and footing and column stem upto plinth level having a minimum comprresive strength (in work test) 150 kg/Cm2 in 15 cm cubes at 28 days after mixing and test conducted in accordance with IS 456 and IS 516 using 12mm size black hard crusher broken granite chips including hoisting,lowering laying and compacting concrete by using vibrator with watering and curing for 28 days centering and shuttering and finishing the exposed surface smooth providing grooves or beds whereever necessay including cost conveyance, royalties and all taxes of all materials and cost of all labour with T&P required for the work etc.complete in all respect but excluding cost of M.S.Rods or Tor Steel and binding wires and labour charge for bending binding and tying the grills etc.complete in all respect as per direction of Engineer-in-charge.
RCC Column base and Footing
2.75
6741
18516.1
... More
R.C.C.work of M-20 in column base and footing and column stem upto plinth level having a minimum comprresive strength (in work test) 150 kg/Cm2 in 15 cm cubes at 28 days after mixing and test conducted in accordance with IS 456 and IS 516 using 12mm size black hard crusher broken granite chips including hoisting,lowering laying and compacting concrete by using vibrator with watering and curing for 28 days centering and shuttering and finishing the exposed surface smooth providing grooves or beds whereever necessay including cost conveyance, royalties and all taxes of all materials and cost of all labour with T&P required for the work etc.complete in all respect but excluding cost of M.S.Rods or Tor Steel and binding wires and labour charge for bending binding and tying the grills etc.complete in all respect as per direction of Engineer-in-charge.
RCC Plinth Band
3.41
7037
23985.47
... More
R.C.C.work of M-20 in column base and footing and column stem upto plinth level having a minimum comprresive strength (in work test) 150 kg/Cm2 in 15 cm cubes at 28 days after mixing and test conducted in accordance with IS 456 and IS 516 using 12mm size black hard crusher broken granite chips including hoisting,lowering laying and compacting concrete by using vibrator with watering and curing for 28 days centering and shuttering and finishing the exposed surface smooth providing grooves or beds whereever necessay including cost conveyance, royalties and all taxes of all materials and cost of all labour with T&P required for the work etc.complete in all respect but excluding cost of M.S.Rods or Tor Steel and binding wires and labour charge for bending binding and tying the grills etc.complete in all respect as per direction of Engineer-in-charge.
Column in Super structure
1.96
16095
31617.19
... More
R.C.C.work of M-20 in column base and footing and column stem upto plinth level having a minimum comprresive strength (in work test) 150 kg/Cm2 in 15 cm cubes at 28 days after mixing and test conducted in accordance with IS 456 and IS 516 using 12mm size black hard crusher broken granite chips including hoisting,lowering laying and compacting concrete by using vibrator with watering and curing for 28 days centering and shuttering and finishing the exposed surface smooth providing grooves or beds whereever necessay including cost conveyance, royalties and all taxes of all materials and cost of all labour with T&P required for the work etc.complete in all respect but excluding cost of M.S.Rods or Tor Steel and binding wires and labour charge for bending binding and tying the grills etc.complete in all respect as per direction of Engineer-in-charge.
RCC Beam
3.41
16095
54855.93
... More
R.C.C.work of M-20 in column base and footing and column stem upto plinth level having a minimum comprresive strength (in work test) 150 kg/Cm2 in 15 cm cubes at 28 days after mixing and test conducted in accordance with IS 456 and IS 516 using 12mm size black hard crusher broken granite chips including hoisting,lowering laying and compacting concrete by using vibrator with watering and curing for 28 days centering and shuttering and finishing the exposed surface smooth providing grooves or beds whereever necessay including cost conveyance, royalties and all taxes of all materials and cost of all labour with T&P required for the work etc.complete in all respect but excluding cost of M.S.Rods or Tor Steel and binding wires and labour charge for bending binding and tying the grills etc.complete in all respect as per direction of Engineer-in-charge.
RCC Lintel
2.05
11008
22600.21
... More
R.C.C.work of M-20 in column base and footing and column stem upto plinth level having a minimum comprresive strength (in work test) 150 kg/Cm2 in 15 cm cubes at 28 days after mixing and test conducted in accordance with IS 456 and IS 516 using 12mm size black hard crusher broken granite chips including hoisting,lowering laying and compacting concrete by using vibrator with watering and curing for 28 days centering and shuttering and finishing the exposed surface smooth providing grooves or beds whereever necessay including cost conveyance, royalties and all taxes of all materials and cost of all labour with T&P required for the work etc.complete in all respect but excluding cost of M.S.Rods or Tor Steel and binding wires and labour charge for bending binding and tying the grills etc.complete in all respect as per direction of Engineer-in-charge.
RCC Chaja
11.35
994
11287.38
... More
R.C.C.work of M-20 in column base and footing and column stem upto plinth level having a minimum comprresive strength (in work test) 150 kg/Cm2 in 15 cm cubes at 28 days after mixing and test conducted in accordance with IS 456 and IS 516 using 12mm size black hard crusher broken granite chips including hoisting,lowering laying and compacting concrete by using vibrator with watering and curing for 28 days centering and shuttering and finishing the exposed surface smooth providing grooves or beds whereever necessay including cost conveyance, royalties and all taxes of all materials and cost of all labour with T&P required for the work etc.complete in all respect but excluding cost of M.S.Rods or Tor Steel and binding wires and labour charge for bending binding and tying the grills etc.complete in all respect as per direction of Engineer-in-charge.
RCC Roof slab
7.69
11876
91320.6
... More
Straightening, bend up or coiled rod, cutting, bending, cranking, hooking welding or jointing (if required) the MS/Tor rod and binding wire, laying the grills and placing in proper position as required for R.C. work providing fan hooks when necessary incl
23.75
7722
183376.33
... More
Fly ash brick work in cement mortar (1:6) after immersing brick for six hours in water before use in superstructure with good quality of brick 23cm x 11 cm x 8 cm size having crushing strength not less than 75Kg. Per Sqm. Including splays cutting circular molding and similar such type of work with necessary projections, chamfering and corbelling watering and curing etc. complete including cost conveyance and Royalty, Cess of all materials with all taxes and all labour with T&P articles required for the work etc. complete as per specification and direction of the Engineer-in-charge.
32.67
5817
190040.38
... More
20 MM thick(1:4) grading plaster including curing and cost conveyance, royality taxes of all materials and labour T&P required for the work etc. complete but with out punning as per spe
63.97
312
19971.35
... More
12mm thick cement plaster in Cement mortar (1:6) to brick work with curing and cost conveyance, royality of all materials and all labour T&P etc. complete as per specification and direction of the Engineer-in-charge.
128.52
199
25673.97
... More
16mm thick cement plaster in Cement mortar (1:6) to brick work with curing and cost conveyance, royality of all materials and all labour T&P etc. complete as per specification and direction of the Engineer-in-charge.
184.22
284
52466.84
... More
20mm thick cement plaster in Cement mortar (1:6) over stone work with curing and cost conveyance, royality of all materials and all labour T&P etc. complete as per specification and direction of the Engineer-in-charge.
14.75
299
4414.66
... More
12mm thick cement plaster in Cement mortar (1:4) to brick work including cement puning and two coat bitumen painting with curing and cost conveyance, royality of all materials and all labour T&P etc. complete as per specification and direction of the Engineer in charge
23.27
228
5320.7
... More
Supplying, fitting and fixing of Vitrified tile in floors of size 600mm x 600mm of approved make conforming to IS 13755 laid on 20mm thick cement mortar (1:4) (1 cement : 4 course sand) and filling joints with white cement of approved quality including cost of all materials, labour, T&P etc. required for the work all complete as per direction of the Engineer-in-charge (For New work only).
41.77
1524
63682.9
... More
Providing and fixing Vitrified tiles in dados, skirtings and risers of steps on 12 mm thick cement plaster (1:3) jointed with neat cement slury mixed with pigment to match the shades of the tiles complete including cost of tiles as directed by the Engineer-in-charge.
6.07
1674
10170.09
... More
Providing and fixing Ceramic tiles in floors, treads or steps and landing on 25 mm thick bed of cement mortar (1:1) jointed with neat cement slury mixed with pigment to match the shades of the tiles complete including cost of tiles as directed by the Engineer-in-charge.
7.28
1269
9234.7
... More
Providing and fixing Ceramic tiles in dados, skirtings and risers of steps on 12 mm thick cement plaster (1:3) jointed with neat cement slury mixed with pigment to match the shades of the tiles complete including cost of tiles as directed by the Engineer-in-charge.
14.66
1380
20245.63
... More
Providing fiting & fixing M.S Door & Windows with Choukath as per approved design including cost of all materials etc complete with all labour T&P articles required for the work etc. complete as per the specification and direction of the Engineer-in-charge
839.93
105
88192.87
... More
Labour for fitting fixing M.S. Door & Window & G.D. with all cost of labour and T&P etc. complete.
22.89
80
1831.24
... More
Finishing wall Surface with weather coat with all cost, covneyance etc. complete.
143.26
41
5903.9
... More
Painting two coat WITH approved paint to doors, windows iron works including all labour T&P articles required for the work etc complete as per the specification and direction of the E.I.C.
43.31
174
7565.18
... More
Providing distempering two coats to wall surface over a coat of cement primer to wall surface with any approved of approved shade including cost of distemper etc. Conveyence, taxes of all materials and labour T&P etc complete in all respect as per speci
230.64
81
18859.69
... More
Provision for Electrifiction including cost of all materials etc comp.in all respect as per specification and direction of the E.I.C.
57933.82
1
57933.82
... More
Provision for P.H.Fittings including cost of all materials etc comp.in all respect as per specification and direction of the E.I.C.
57933.82
1
57933.82
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%