Forest Environment And Climate Change Department Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
Refer DocumentsDocument Cost
₹ 6,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_DFOWL_80724_1Bid Award Id
ViewTender No
DFO-BLS-01-A/2022-23Tender Authority
Forest Environment And Climate Change Department ViewPurchaser Address
-Website
http://tendersodisha.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Cement concrete (1:4:8) using graded stone aggregate 40 mm nominal size including cost of all materials and aII labour etc. complete
5.82
-
4471.5
... More
RCC work M-20 grade using 12mm. & down grade hard granite CB chips including watering, lowering laying concrete, compacting with vibrators, curing etc complete
-
-
-
... More
Pile cap
2.48
-
5340
... More
Grade Beam
4.77
-
5748.8
... More
Column
2.5
-
12719.1
... More
Lintel
2.52
-
8968.5
... More
Chajja
19.9
-
822.1
... More
Beam
4.36
-
12719.1
... More
Roof slab
8.7
-
9586.6
... More
Supplying cutting, bending un-coated HYSD bars for reinforcement tying the grills and placing in position as required for the RCC works and for providing fan hooks hoisting and lowering, laying including cost, conveyance & taxes of SYSD bars and binding wires of 18 to 20 gauge required for the work and bending binding and typing the grills.
31.1
-
9896.85
... More
K.B bricks masonary incm (1:6) after immersing the bricks 6 hrs. in water before use in Foundation and plinth including all cost, carriage etc. complete.
8.99
-
4434.5
... More
K.B bricks masonary incm (1:6) after immersing the bricks 6 hrs. in water before use in Superstruture including all cost, carriage etc. complete.
38.22
-
4467.8
... More
12mm thick Cement plaster (1:4) over brickwork with neat Cement punning for skirting including curing etc. complete
33.33
-
166.5
... More
12mm thick Cement plaster (1:6) over out side wall including curing etc. complete.
111.41
-
144.7
... More
16mm thick Cement plaster (1:6) over inside side wall including curing etc. complete.
242.05
-
206.2
... More
6mm thick Cement plaster (1:4) to RCC surface finished smooth including closed deep chipping and slurry treatment curing etc. complete.
65.02
-
161.8
... More
Dressed seasoned Non sal wood work in doors & windows frames chaukath including cost of all materials, labour for fitting & fixing etc complete.
0.69
-
36705.1
... More
Supply fitting & fixing WI clamps including cost of all materials, labour for fitting & fixing etc complete.
72
-
45
... More
Cost of MS Grills including cost of all materials, labour for fitting & fixing etc complete.
401
-
90
... More
Supply fitting & fixing factory made PVC doorframe of size 50x47mm with wall thickness of 5mm made out of extruded 5mm rigid PVC foam sheet with all fittings etc. complete.
1.6
-
2500
... More
32 mm nonsal wood wood panelled shutters moulded panels with all labour, iron fittings and wooded hinged cleats etc fitted and fixed complete in all respect, but excluding the cost of iron fittings.
29.33
-
2427.3
... More
Fixing of Vetrified tiles in floors on 25mm thick bed of Cement mortar and filling joint with white Cement in slury mixed with pigment to match the shades of the tiles including cost of all materials labour etc complete.
75.8
-
981.8
... More
Fixing of Ceramic wall tiles in dados, skirting riser of stepps on 12mm thick bed of Cement mortar joined with neat Cement slury mixed with pigment to match the shades of the tiles including cost of all materials labour etc complete.
35.78
-
1090.7
... More
2.5cm thick grading concrete (1:2:2) on Roof slab with 6 mm size hard broken granite chips on new works.
86.5
-
310
... More
Finishing wall surface with weather coat painting 2 coat to the out side surfaces of walls over one coat of primer with all cost.
111.41
-
145.4
... More
Wall painting two coats with plastic emulsion paint of approved shade on old/new work to give on even shade over one coat of priming coat.
307.07
-
138.7
... More
Painting with synthetic enamal paint 2 coats over one coat of priming including cost of all materials labour etc complete.
74
-
197.1
... More
Site development, cleaning shrub jungle including levelling building area and for unforseen items.
1
-
9790
... More
EI Charges
1
-
26000
... More
PH Charges
1
-
35000
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements