Forest Environment And Climate Change Department Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Forest Environment And Climate Change Department Tender
Civil And Construction
Civil Works Others
Building Construction
Eprocure
Opening Date18 Nov 2024
Closing Date28 Nov 2024
Tender Amount₹ 10,57,194.71 This is an estimated amount, exact amount may vary.
Costs
EMD
0Document Cost
₹ 4,000Tender Fee
Refer Documents
Summary
Construction Of Forest Guard Quarter, Patraput Beat At Patraput Of Balimela Forest Range
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_DFOMK_107170_3Tender No
1F/DFOMKG/03(online)/2024-25Tender Authority
Forest Environment And Climate Change Department ViewPurchaser Address
-Website
http://tendersodisha.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Random Rubble Hard Granite Stone Masonary in CM (1:6) in foundatioin and plinth using hard borken granite stone of approved size and quality from approved quarry including splays cutting, circular molding, chamfering, and corbelling, watering and curing etc. complete including cost, conveyance, royalty and all teaxes of materials with cost of labour and T&P required for the work etc. complete in all respect as directed by EIC
16.34
4604
75238.02
... More
RCC work(1:1:5:3) in plinth band, slab, chajja having a minimum compressive strength (in work test) of 150Kg/cm Sqm in 15 cm. Cubes at 28 days with IS 456 and 516 using 12mm to 20 mm size (20 mm not to exceed 25%) hard black crusher broken granite stone chips of approved quality and from approved quarry including hoisting lowering,laying and compaction concrete wtering and curing for 4 weeks, including cerntering, shuttering and finishing the exposed surfaces smooth with cost, conveyance, royalties and taxes of all materials and labour with T&P required for the work etc. complete in all respect as directed by EIC.
A)Column Base
3.82
8600
32852.08
... More
B)Beams and columns
6.57
18430
121089.04
... More
C)Lintle
1.61
17424
28053.09
... More
D)Chajja
5.23
1010
5284.97
... More
E)Slab
6.83
12363
84444.07
... More
WBC brick masonry in CM (1:6) in super structure using CB bricks of 9'' size having a crushing strength not less than 35 KG/Sq. Cm including splays cutting, circular molding, chamfering and corbelling, and watering and curing etc. complete including cost conveyance, royalty and all taxes of materials with cost of labour, T&P etc. required for the work complete in all respect as directed by EIC
31.53
4995
157509.38
... More
12 mm thick cement plaster (1:6) finished smooth to out side brick wall afters after racking out the joint including watering and curing with cost and conveyance of all materials and labour with T&P required for the work with all taxes and rayalties etc. complete in all respect as directed by EIC.
95.06
188
17883.64
... More
16 mm thick cement plater (1:6) finished smooth to inside smooth surface of brick walls after racking out the joints including watering and curing with the cost and conveyance of all materials and labolur with T&P required for the wark with all taxes and raylties etc. complete in all respect as directed by EIC.
218.36
270
59144.99
... More
20 mm thick cement plaster in CM (1:6) over stone masonry with watering and curing including cost, conveyance, royalty and all taxes of materials withi cost of labour and T & P etc. required for the work complete in all respect as directed by EIC.
21
283
5945.73
... More
Supplying, fitting and fixing of fectory made composit (WPC) door including door frame, locking system, conveyance and all fittings and all taxes complete in all respect
12.36
3300
40788
... More
Supplying,fitting and fixing of fectory made composit(WPC) window including (1/3 glass) window frame, locking system and all fittings like Grill and all conveyance, taxes complet in all respect.
11.66
4125
48097.5
... More
Spplying, fitting and placing uncoated HYSD bar reinforcement complete as per drawing and technical specification as directed by EIC
16.95
7443
126174.78
... More
Cement concrete (1:2:4) using 12 mm size HG chips with cost conveyance, royalties, taxes including curing etc. complete in all respect as directed by EIC.
0.77
7442
5730.68
... More
Supplying, fitting and fixing vitrified tile in floors of size 600mmx600mm of approved make comforming to IS:13755 laid on 20mm thick ciment mortar (1:4) and filling jointswith white cement of approved quality including cost of materials, labour etc required & complete in all respect as directed by EIC.
73.88
1502
111022.43
... More
Finishing walls with water proofing cement paint ( weather coat) of approved shade on new work two coats over one coat of primer to give an even shade including cost of paint with conveyance, taxes, lifts of all materials and labours, T&P required for the work etc. complete in all respect including scaffolding as directed by EIC.
334.42
160
53630.94
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements