Forest Environment And Climate Change Department Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
Refer DocumentsDocument Cost
₹ 10,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_DFOD_83999_1Bid Award Id
ViewTender No
04-DFO/DKLTender Authority
Forest Environment And Climate Change Department ViewPurchaser Address
-Website
http://tendersodisha.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Affidavit, Bid Security Declaration, Other documents as per DTCN
Cost of Tender paper, EMD Declaration,Valid RC, GST, PAN card etc
BOQ Items
Cement Concrete(1:3:6) using 40 mm size H.G.C.B. Metal including cost of labour, curring and materials etc. complete. (CC ROAD,Cause Way Hume Pipe Culvert )
457.88
-
5508.57
Cement Concrete(1:2:4) using 12 mm size H.G.C.B. Chips including cost of labour, curring and materials etc. complete. (CC ROAD,Cause Way Hume Pipe Culvert )
126.27
-
7045.45
Cement Concrete (1:1.5:3) with 12 mm size H.G.C.B chips for R.C.C works including cost, conveyance, Hoisting & laying etc. Complete. (Road)
20.97
-
7776.82
Rigid and Smooth centering and shuttering for R.C.C work including dismantling the same after casting including cost of all labour and materials. (Road)
164.99
-
104.44
Supplying fitting and placing uncoated HYSD bar reinforcement complete as per drawing and technical specification. (Road)
15
-
10735.57
Labour For Soling Road surface with soling stone filling interstices with Moorum and Rolling with HRR including cost of materials.(Road)
68.43
-
1294.13
Collecting & supplying good laterite Moorum on road surface in regular box heaps 1.5mx1.5mx0.5m to be measured as 1 cum. (Road)
1303.37
-
494.52
Laying Mooorum in Sub base. (Road)
1289.69
-
331.19
Cost, Carriage & Laying of Humepipe (4'0" dia & 8'0" Length). (Road)
16
-
11125
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements