Forest Environment And Climate Change Department PCCF And HoFF Odisha Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Forest Environment And Climate Change Department PCCF And HoFF Odisha Tender

Works
Civil And Construction
Eprocure
Opening Date27 Jan 2025
Closing DateCancelled
Tender Amount₹ 25,17,642.91 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Summary

Protection Barrack At Jharadihi

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Cement Concrete M-25 grade with 20mm and down grade hard granite (crusherbroken) stone chips including hoisting and laying. A.Column base & footing (i) Ground Floor

5

6935

34677.65

... More
B. Plinth Band (i) Ground Floor

3.7

7808

28891.19

... More
C. Column, Beam & Bed Block (i) Ground Floor

5.2

18463

96011.4

... More
(ii) 1st Floor

4.9

20963

102722.91

... More
D. Lintel Band (i) Ground Floor

1.9

14600

27740.97

... More
(ii) 1st Floor

1.5

16328

24492.06

... More
E. Chajjas (i) Ground Floor

3.2

1258

4026.21

... More
(ii) 1st Floor

2.6

1432

3724.16

... More
G. Roof Slab (i) Ground Floor

6.5

14122

91796.45

... More
(ii) 1st Floor

6.7

15754

105554.88

... More
H. Stair Case (i) Ground Floor

1.6

15970

25552.62

... More
Brickwork with 1st.class flyash Bricks 25cmx12cmx8cm having crushing not less than 75kg/cm² in C.M (1:6) in foundation including cost of all and complete finished in all respect. Foundation & plinth

5.1

5560

28360.84

... More
Ground floor

24

5594

134262.72

... More
First Floor

49.4

6021

297437.89

... More
Providing & fixing TOR Fe-500D grade Reinforcement bars of approved makes as per DTCN for RCC work of required diameter & of approved quality including straightening, cutting, bending, binding, joining (if necessary), tying the grills hoisting, lowering and placing in position as per the approved design and drawings with provision for fan hooks where required including the cost, conveyance of reinforcement bars of tor steel and binding wires of 18 to 20 gause, cost of all labour, loading, unloading, labour cess T&P, etc required for the work complete for the work in all heights as per specification & excluding GST as direction of Engineer-in-Charge. (Linear measurements will be taken & quantity will be calculated on standard weight, Weight of binding wire will not be considered for measurment. No payment will be made for overlap, couplings, welded joints spacer bars, stays, hangers and wastage. Cost of these items shall be deemed to be included in the rates for reinforcement) N.B- Purchase invoice with Manufacturer specification & test report to be produced. Ground Floor

23.13

10074

233031.74

... More
First Floor

12.29

10107

124222.9

... More
16mm thick cement plaster in C.M (1:6) including punning for skirting including cost of all & complete finished. Ground Floor

186.4

260

48625.48

... More
First Floor

177.4

271

48209.2

... More
12mm thick cement plaster in C.M (1:6) including punning for skirting including cost of all & complete finished. Ground Floor

88.94

188

16753.58

... More
First Floor

121.07

196

23731.41

... More
6 mm thick cement plaster (1:4) to R CC surfaces finished smooth including closed deep chiping and slury treatment. Ground Floor

61.3

214

13178.27

... More
First Floor

47.8

226

10806.62

... More
2.5cm(1")a.v.thick A.S.Flooring with cement concrete of prop(1:2:4)with black hard crusher broken granite chips laid in two layers the bottom layer being 1/2"thick with 1/2"size black hard crusher broken granite chips and the top layer 1/2" thick with 1/2" size black hard crusher broken granite chips laid to proper slope including rounding of corners watering and curing with cost conveyance royalties and all taxes of all materials and cost of all labour with T&P required for the work etc.complete in all floors. as per the direction of Engineer in Charge. Ground floor

16.3

389

6342.33

... More
12mm thick cement plastering(1:4) with punning

14.7

209

3080.97

... More
Fixing of tiles in fioors, walls, treads landings etc on 25mm thick bed of c.m(1:1) with neat cement slury mixed with pigment to match the shade of the tiles including cost of tiles etc complete Ground floor

41.3

1316

54356.17

... More
First Floor

47.8

1329

63542.93

... More
Supplying, fitting & fixing Vetrified wall tiles in dados skirting and risers of steps on 12mm thick c.p.(1:3) including cost, conveyance & taxes of all material, labour etc complete as per specification and direction of the Engineer-in-Charge. Ground floor

19.9

1273

25339.47

... More
First Floor

29.4

1293

38021.26

... More
Cement washing one coat with cement over new plaster surface including cost of cement with all cost, conveyance royalty taxes of all materials and all labour T&P required for the work etc complete as per direction of the Engineer-in-charge. Ground floor

316.8

18

5813.28

... More
First Floor

316.9

31

9976.01

... More
Finishing walls with plastic emulsion of approved shade on new work two coat over a coat of primer to give an even shade including cost of all materials, labour charges, T&P etc required for the work complete as per direction of the Engineer-in-charge. Ground floor

227.9

183

41849.28

... More
First Floor

195.8

247

48419.38

... More
Finishing walls with weather coat of approved shade on new work two coat over a coat of primer to give an even shade including cost of all materials, labour charges, T&P etc required for the work complete as per direction of the Engineer-in-charge. Ground floor

89

180

16105.44

... More
First Floor

121.1

247

29940.76

... More
Providing , fitting & fixing Steel Angle Iron doors & windows frame with M.S grill manufactured from standard rolled steel angle section 50 mm X 50 mm X 6 mm cornered of the frame duly metered and electrically welded with fish tail hold fasts made out of M.S flats of size 200 mm X 50 mm X 30 mm wide & 5 mm thick at the rate of 4 nos per frame with M.S hinges of size 75 mm & 14 SWG thick at the rate of 3 nos for each single leaf shutter tower bolt ring & M.S Grills made out of 19 mm x 5 mm flat properly welded to the window frame with one coat of anti corrosive red oxide zinc chrome primere as per direction of Engineer - in - Charge. Ground floor

1120.19

95

106474.34

... More
First Floor

685.91

97

66841.93

... More
Painting two coats with approved paint over a coat of primer of any approved shade with cost, conveyance, taxes of all materials, all labour and T&P required for the work including the cost of primer all other materials aetc complete as per direction of the Engineer-in-Charge Ground floor

29.2

279

8156.44

... More
First Floor

48.8

287

14011.94

... More
Supplying , fitting and fixing of openable UPVC doors with door frame of approved make with 6mm thick glass of approved quality complete with frame, shutters and all fitting and fixtures complete as per direction of the Engineer-in-Charge.

4.8

10084

48404.54

... More
Supplying fitting and fixing of stainless steel of 304 grade in hand railing using 50 mm dia of 2 mm thick circular pipe with Balustrade of size 32 mm x 32 mm x 2 mm etc complete.

5.6

3556

19916.23

... More
Cost towards sanitary fitting & Fixing

1

185775

185775

... More
Cost for Electrification

1

99627

99627.31

... More
GST will be paid extra as applicable on production of Invoice

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.