Food Corporation Of India Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Food Corporation Of India - FCI Tender

Works
Civil And Construction
Road Construction
Drainage Work
Eprocure
Opening Date19 Jun 2024
Closing Date11 Jul 2024
Tender Amount₹ 2,48,92,143 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width aswell as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m, as directed by Engineer-incharge. All kinds of soil cum

1559

276722

177.5

... More
Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means , including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved.

526

138837

263.95

... More
Disposal of earth including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, upto 5 km lead including all lifts involved.

1487.6

485969

326.68

... More
Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade.

3604

437994

121.53

... More
Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge.With material conforming to Grade-II (size range 53 mm to 0.075 mm) having CBR Value-25

541

1582343

2924.85

... More
Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 26.5 mm nominal size, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per Table: B below, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined by trial during construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a mechanical paver, compacting with 8-10 tonnes vibratory roller, finishing and curing etc. complete as per direction of Engineer-in-charge. Table B : Aggregate Gradation for Dry Lean Concrete Sieve Designation Percentage by weight passing the sieve 26.50 mm 100 19.0 mm 75-95 9.50 mm 50-70 4.75 mm 30-55 2.36 mm 17-42 600 micron 8-22 300 micron 7-17 150 micron 2-12 75 micron 0-10

551

2285906

4148.65

... More
Providing and laying of separation Membrane of impermeable plastic sheeting 125 micron thick.

3647

89351

24.5

... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Mild steel and Medium Tensile steel bars

10357

1109234

107.1

... More
Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more

13106

1413482

107.85

... More
Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with OPC 43 grade cement, coarse and fine aggregate satisfying Table: A below, conforming to IS 383, maximum size of coarse aggregate 31.5mm nominal size mixed in a batching and mixing plant/machine as per approved Mix design to achieve required design mix grade of controlled concrete including transporting/pumping, laying, spreading and compacting mechanically by using needle and surface vibrators, levelling to required slope/ camber, finishing with required texture, including steel form work with sturdy M.S. channel sections, curing, making provision for contraction/ expansion, construction & longitudinal joints (10 mm wide x 50 mm deep) by groove cutting machine, providing and filling joints with approved joint filler and sealants, admixtures (IS : 9103 & IS : 6925) etc. with flexural strength minimum 4.5 MPa complete all as per direction of Engineer-in-charge including providing dowel bars with sleeve and tie bars wherever required (Item of joint fillers, sealants, dowel bars with sleeve and tie bars to be paid separately).

1174

13110645

11167.5

... More
Note for Sl 13: 1. Cement content considered is @ 390 kg/cum. Excess/ less cement used as per design mix is payable/ recoverable separately. 2. It is the responsibility of the contractor to bring and use appropriate Batch mixing plant to the construction site for production of concrete and the quoted rate shall include the expenditure towards the same. 3. It is also the responsibility of the contractor to carry out the Design Mix of Cement Concrete as per the specification above from a Govt. Engineering College and get it approved from FCI. The quoted rate shall include the fees of for carrying out the design mix charged by Government Engineering College, cost of material required to carry out the Design Mix and other incidental expenditures. 4. Dowel bars, Tie bars and Sleeve (Plastic sheeting) shall be paid under respective items. Table A: Aggregate Gradation for Pavement Quality Concrete. (Combined Gradation of fine and coarse aggregates) Sieve Designation Percentage by weight passing the sieve 31.5 mm 100 26.5 mm 85-95 19.0 mm 68-88 9.5 mm 45-65 4.75 mm 30-55 600 micron 8-30 150 micron 5-15 75 micron 0-5

-

-

-

... More
Providing and fixing pre-moulded joint filler in expansion joints of RCC roads / CC pavements after making the joints dust free with high pressure air jet cleaners, all complete as per direction of the Engineer-in-Charge. (Pre-moulded joint fillers shall be made of bitumen hot sealing compound impregnated fibre board having impregnation more than 35%, conforming to IS:1838 for fibre board and IS: 1834 for hot sealing bitumen compound grade A.)

6929

36723

5.3

... More
Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes

47

9136

194.4

... More
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.

100

13370

133.7

... More
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work

7

1091

155.9

... More
Re-lettering with black Japan paint of approved brand and manufacture.

3000

11550

3.85

... More
Providing and laying Non Pressure NP-2 class (Light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete. 150 mm dia RCC pipes.

184

102386

556.45

... More
Credit for salvage value of stone aggregates obtained from WBM layer.

190

-66500

350

... More
Credit for salvage value of "Title Information Board"/ any other iron scrap.

147

-2940

20

... More
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar

82

168936

2060.2

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)

34

231608

6812

... More
Centering and shuttering including strutting, propping etc. and removal of form forWalls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.

1302

1096935

842.5

... More
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)

126

1139764

9045.75

... More
6 mm cement plaster of mix :1:3 (1 cement : 3 fine sand)

686

206108

300.45

... More
Neat cement punning.

686

54845

79.95

... More
Filling with available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 and for all lift.

71.4

13994

196

... More
Quote Rate for excess/less cement per kg as per design mix for payment/ recovery as per item of Sl no. 13

1

5

5.15



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.