East Coast Railway Tender
... More
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
₹ 2,19,600Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
58-KUR-TRD-OT-2024-25-KHURDA ROAD DIVISION-ELECTRICAL/ECORTender No
58-KUR-TRD-OT-2024-25Tender Authority
East Coast Railway ViewPurchaser Address
-Website
http://ireps.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Erection of TTC Structures 5.5m boom with TTK-1 & 2. 4
-
-
63479.86
... More
Erection of TTC Structures 8.00m boom with TTK-1 & 2. 5
-
-
73545.42
... More
Fabricated Steel Work other than mast
-
-
272293.23
... More
Single bracket assembly(Including Double/Multiple bracket assemblies) for conventional OHE with SPS 7
-
-
1660327.34
... More
Mounting arrangement of Span Wire
3
1320
3962.34
... More
Cadmium Copper Large Span Wire(130sq. Mm) 9
-
-
8
... More
Dropper wire(5mm) 10
500
165
82595
... More
Small jumper wire(50sq.mm) 11
50
616
30834
... More
Large jumper wire(105sq.mm) 12
40
737
29497.6
... More
Large jumper wire(160sq.mm) 13
50
972
48627.5
... More
Assorted components required per Kilometer length of OHE 14
3.5
53475
187163.17
... More
Erection of OHE
-
-
158732.38
... More
Extra for supply & erection of additional fittings at a turnout, diamond crossing or overlap 16
-
-
36810.8
... More
Guy rod assembly including mast anchor/guy rod attachment
-
-
204105.14
... More
Regulating Equipment 3-pulley type with counter weight assembly, guide tube for Conventional OHE 18
-
-
1296844.73
... More
Termination of Double Conductor of OHE 19
-
-
155800.24
... More
Termination of Single Conductor of OHE 20
-
-
32077.85
... More
Anticreep with Cadimum Copper Catenary Wire 21
-
-
20491.75
... More
Section Insulator Assembly for Conventional type/Tramway type OHE. 22
-
-
262857.55
... More
Erection of Section Insulator Assembly for Conventional type OHE. 23
-
-
28197.77
... More
Solid Core Cut-in-Insulator 24
-
-
5799.5
... More
Solid Core Suspension Insulator 25
-
-
7265.28
... More
25KV Single Pole Isolator Assembly 26
-
-
187702.74
... More
25KV Post Insulator 27
-
-
66262.24
... More
Aluminium Bus Bar 28
-
-
16638.2
... More
Connector & terminal 29
-
-
16407.56
... More
Erection of Structure Bond (a) Erection in NPB 30
100
47
4718
... More
Erection of Transverse/Special Bond (a) Erection in NPB 31
20
50
1009.4
... More
Erection of Longitudinal Bond(C-bond for cross over) (a) Erection in NPB 32
100
44
4428
... More
Number Plate Mast/ structure (a) Supply & erection 33
77
294
22684.2
... More
Sectioning Diagram Board (a) Supply & erection 34
1
9430
9430.18
... More
Electric Engine Stop Board (a) Supply & erection
5
765
3825.75
... More
Caution Board for 25KV traction (a) Supply & erection 36
-
-
35
... More
Danger Board for 25KV traction (a) Supply & erection 37
10
406
4066.1
... More
Working Limit Board(Power Block) (a) Supply & erection
6
537
3227.64
... More
Preparation of Station Working Rules Diagram and working instructions (a) Erection in NPB 39
3
12055
36166.47
... More
Transfer of Equipment from one mast/support to another (a) Erection in PB 40
2
4677
9355.32
... More
Provision of additional bracket assembly on a mast or support (a) Erection in PB 41
2
1264
2529.14
... More
Splicing & extension of Anchored OHE 42
-
-
59600.95
... More
Adjustment of existing OHE and Tower Wagon checking 44
-
-
70519.9
... More
Dismantling of Cantilevers 45
-
-
59094.72
... More
Dismantling of Guy Rod Assembly 46
-
-
8783.42
... More
Dismantling of Regulating Equipment with counter weight assembly. 47
-
-
37189.13
... More
Dismantling of OHE. 48
-
-
58700.11
... More
Dismantling of SPS. (a) Erection in PB 49
0.5
-
4255.02
... More
Dismantling of SP/DP Isolator. 50
-
-
10136.48
... More
Dismantling of Section Insulator. 51
-
-
20719.3
... More
Dismantling of Anticreep. (a) Erection in PB 52
1
9828
9828.43
... More
Dismantling mast/structure/upright by cutting 53
-
-
56676.35
... More
Retrieval of mast/TTU from solid core foundation without damage or leaning of mast
-
-
106841.56
... More
Supply of Porcelain 9-T insulator 2
46
3776
173696
... More
Supply of Porcelain Stay insulator-1050mm CD 3
102
2950
300900
... More
Supply of Porcelain Bracket insulator-1050mm CD 4
102
2950
300900
... More
Fabricated & galvanized B-Series Steel Structures 5
31.1
96760
3009236
... More
Fabricated & galvanized Steel TTC (5.50m Boom) Structures 6
4.6
96760
445096
... More
Fabricated & galvanized Steel TTC (8.0m Boom) Structures
5
96760
483800
... More
Galvanized Steel Flexible Traction Wire bonds with lugs duly crimped at both ends for 25KV ac Electric traction system(Effective length- 3 Metres)
-
-
7
... More
Galvanized Steel Flexible Traction Wire bonds with lugs duly crimped at both ends for 25KV ac Electric traction system(Effective length- 1 Metre)
100
566
56640
... More
Galvanized Steel Flexible Traction Wire bonds with lugs duly crimped at both ends for 25KV ac Electric traction system(Effective length- 4 Metres)
20
2455
49100
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%