Directorate Of Ports And Inland Water Transport Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Directorate Of Ports And Inland Water Transport - PIWT Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date18 Aug 2023
Closing Date25 Sep 2023
Tender Amount₹ 1,12,05,25,409 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Chiseling/Breaking using suitable tools and equipments the top of pile concrete up to the receipt of dense concrete and dressing the pile head suitably so as to receive the form work for deck work , including breaking to the required level exposing the pile reinforcement to sufficient length as per approved drawing for embedding into the coping beam etc. including removal of concrete debris from the site, supply of all labour, material, transportation cost, hire and running charges of all machineries complete for 1000mm dia piles as directed by the Engineer-In-Charge.

116

509100

4388.8

... More
Providing and laying reinforced cement concrete in concrete mix M40 for pile excluding cost of steel reinforcements in position as per approved drawing and as directed by the Engineer-In-Charge including mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc. complete as directed by the Engineer-In-Charge.

3271.67

27788256

8493.6

... More
Providing and laying reinforced cement concrete in concrete mix M40 for Precast Pile muff excluding cost of steel reinforcements in position as per approved drawing and as directed by the Engineer-In-Charge including shuttering, mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge.

108.73

1694176

15581.5

... More
Providing and laying reinforced cement concrete in concrete mix M40 for Insitu Beam excluding cost of steel reinforcements in position as per approved drawing and as directed by the Engineer-In-Charge including shuttering, mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge.

505.88

7427734

14682.8

... More
Providing and laying reinforced cement concrete in concrete mix M40 for Insitu Slab excluding cost of steel reinforcements in position as per approved drawing and as directed by the Engineer-In-Charge including shuttering, mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge.

431.25

5983162

13874

... More
Providing and laying reinforced cement concrete in concrete mix M40 for wearing coat as per approved drawing and as directed by the Engineer-In-Charge including mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge.

129.38

1039218

8032.3

... More
Providing and laying reinforced cement concrete in concrete mix M40 for Service Trench excluding cost of steel reinforcements in position as per approved drawing and as directed by the Engineer-In-Charge including shuttering, mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge.

20.7

287191

13874

... More
Fabricating and placing in position of steel reinforcement TMT bars(Fe 500D)confirming to IS 1786 specifications of SAIL/RINL/TISCON for all reinforced cement concrete pile including lifting hook, cutting, bending, tying with 16 gauge G.I. binding wire and welding to proper specifications wherever required including cost of steel and binding wire, cover blocks of 100mm dia in CC M40 mix, supply of with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees, etc. all complete as directed by the Engineer-In-Charge.

404.62

39253116

97012.3

... More
Supply of Fe500D steel confirming to IS specification of SAIL/ RINL/ TISCON/ Electro steel brands for Precast pile muff including cutting, straightening, bending , binding & plaving the grills in position for RCC works including cost of binding wire of 16 to 18 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees, etc. all complete as directed by the Engineer-In-Charge.

11.52

1073323

93170.4

... More
Supply of Fe500D steel confirming to IS specification of SAIL/ RINL/ TISCON/ Electro steel brands for Main Beams including cutting, straightening, bending , binding & plaving the grills in position for RCC works including cost of binding wire of 16 to 18 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees, etc. all complete as directed by the Engineer-In-Charge.

31.76

2959091

93170.4

... More
Supply of Fe500D steel confirming to IS specification of SAIL/ RINL/ TISCON/ Electro steel brands for Long Beams including cutting, straightening, bending , binding & plaving the grills in position for RCC works including cost of binding wire of 16 to 18 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees, etc. all complete as directed by the Engineer-In-Charge.

33.74

3143569

93170.4

... More
Supply of Fe500D steel confirming to IS specification of SAIL/ RINL/ TISCON/ Electro steel brands for Slab including cutting, straightening, bending , binding & plaving the grills in position for RCC works including cost of binding wire of 16 to 18 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees, etc. all complete as directed by the Engineer-In-Charge.

303.95

28319143

93170.4

... More
Supply of Fe500D steel confirming to IS specification of SAIL/ RINL/ TISCON/ Electro steel brands for Service Trench including cutting, straightening, bending , binding & plaving the grills in position for RCC works including cost of binding wire of 16 to 18 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees, VAT, etc. all complete as directed by the Engineer-In-Charge.

4.14

385725

93170.4

... More
Conducting High Strain Dynamic Test as per standard practices(ASTMD 4945 of 1989) The rate is inclusive of testing, hire charges for all equipments like transducers, strain gauge, oscilloscope hammer crane and cost of development of pile concrete with line and dismantling the developed length of concrete, transportation of equipment, labour and furnishing the test result etc., complete and as directed by the EIC.

2

500000

250000

... More
Supplying, handling, transporting and fixing in position of Arch fender of size DAV- 500x1500 mm Length as per Drawing with anchor bolts, U hooks, Chains,shall be hot dip G.I coating with 80micron including cutting, concrete chipping, drilling, grouting, necessary welding with deck reinforcement steel and necessary coal tar painting(wherever required) including all materials, labour, consumable items, machineries, tools, tackles,transportation etc. and complete as per Engineer-in-charge.

9

1098000

122000

... More
Supplying, handling, transporting and fixing in position of Cast iron Bollard (20T ton capacity)with necessary cutting, concrete chipping, drilling, grouting, welding with deck reinforcement steel and necessary coal tar painting(wherever required) including all materials, labour , consumable items etc. complete as per drawing and specifications as directed by the EIC.

13

334100

25700

... More
KANINALI -LANDING JETTY - Setting up the piling gantry and connected equipment over each pile location, including cost of shifting, cost of all materials for (750mm & 1000mm Dia Pile) piling gantry, labour, setting up the rig to alignment and correct dimensions as shown in the drawing and as directed by the EIC.

48

2416963

50353.4

... More
Providing and fabricating M.S.liners confirming to IS specifications of SAIL of specified thickness for required length with M.S. shoes of 1.0m height using 8mm thick M.S. plates for bored vertical pile measured from cut off level of pile to the terminating level including supplying, cutting, rolling, bending, handling and welding cost, labours, materials, accessories,all taxes, hire and running charges of all machineries, royality, labour, material, T&P, conveyance charges, Port entry fees etc. all complete as per drawings and specification as directed by Engineer-In-charge Note:- The stiffener shall be measured under this item.In case the soil strata found to be not good in the founding level of the liner, extra depth may be provided as per site condition.

290.07

27265622

93996.7

... More
Boring through all types of soils, boulders, hard starta and rocks etc.. for vertical bored piles (1000 mm dia pile) from the existing ground level 0 mCD to the founding level(-)32.0m CD of the piles, including bailing, flushing the bore bentonite with required density, chiselling, shifting of materials etc.. complete as per directed by the Engineer-In-charge.Note:-i) In case the soil stratum at the founding level is loose the Engineer or his representative may direct the contractor to carryout additional length of boring and payment shall be made accordingly. ii) The sample of bored materials of regular interval shall be collected and produced for the verification of the Engineer or his representative at no extra cost . in case any test reqiured by engineer in-charge, bored the samples so collected shall be referred to an authorized laboratory / agency identified by the Engineer , cost for testing shall be included in the quoted rate. engineer in-charge decision regarding founding level is final.`no claims in this regards are entertained. iii) Boring through all type of soil strata means soft soil, weathered rock, cemented sand, boulders and hard rock etc., iv) The boring in all type of soil measurement will be made on the basis of depth of boring from encountered soft soil level to founding/pile termination level. v) All the boring depths shall be jointly measured actually at site and Engineer in-charge decision is final.

576

3744000

6500

... More
Boring through all types of soils, boulders, hard starta and rocks etc.. for vertical bored piles (750 mm dia pile) from the existing ground level 0 mCD to the founding level(-)32.0m CD of the piles, including bailing, flushing the bore bentonite with required density, chiselling, shifting of materials etc.. complete as per directed by the Engineer-In-charge.Note:-i) In case the soil stratum at the founding level is loose the Engineer or his representative may direct the contractor to carryout additional length of boring and payment shall be made accordingly. ii) The sample of bored materials of regular interval shall be collected and produced for the verification of the Engineer or his representative at no extra cost . in case any test reqiured by engineer in-charge, bored the samples so collected shall be referred to an authorized laboratory / agency identified by the Engineer , cost for testing shall be included in the quoted rate. engineer in-charge decision regarding founding level is final.`no claims in this regards are entertained. iii) Boring through all type of soil strata means soft soil, weathered rock, cemented sand, boulders and hard rock etc., iv) The boring in all type of soil measurement will be made on the basis of depth of boring from encountered soft soil level to founding/pile termination level. v) All the boring depths shall be jointly measured actually at site and Engineer in-charge decision is final.

780

4290000

5500

... More
Chiseling/Breaking using suitable tools and equipments the top of pile (1000 mm dia pile) concrete up to the receipt of dense concrete and dressing the pile head suitably so as to receive the form work for deck work , including breaking to the required level exposing the pile reinforcement to sufficient length as per approved drawing for embedding into the coping beam etc. including removal of concrete debris from the site, supply of all labour, material, transportation cost, hire and running charges of all machineries complete as directed by the Engineer-In-Charge.

18

78998

4388.8

... More
Chiseling/Breaking using suitable tools and equipments the top of pile(750 mm dia pile) concrete up to the receipt of dense concrete and dressing the pile head suitably so as to receive the form work for deck work , including breaking to the required level exposing the pile reinforcement to sufficient length as per approved drawing for embedding into the coping beam etc. including removal of concrete debris from the site, supply of all labour, material, transportation cost, hire and running charges of all machineries complete as directed by the Engineer-In-Charge.

30

98748

3291.6

... More
Providing and laying reinforced cement concrete in concrete mix M40 for pile excluding cost of steel reinforcements in position as per approved drawing and as directed by the Engineer-In-Charge including mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge.

916.84

7787272

8493.6

... More
Providing and laying reinforced cement concrete in concrete mix M40 for Precast Pile muff excluding cost of steel reinforcements in position as per approved drawing and as directed by the Engineer-In-Charge including shuttering, mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge.

15.88

247434

15581.5

... More
Providing and laying reinforced cement concrete in concrete mix M40 for Insitu Beam excluding cost of steel reinforcements in position as per approved drawing and as directed by the Engineer-In-Charge including shuttering, mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge.

89.14

1308824

14682.8

... More
Providing and laying reinforced cement concrete in concrete mix M40 for Insitu Slab excluding cost of steel reinforcements in position as per approved drawing and as directed by the Engineer-In-Charge including shuttering, mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge.

93.75

1300687

13874

... More
Providing and laying reinforced cement concrete in concrete mix M40 for wearing coat as per approved drawing and as directed by the Engineer-In-Charge including mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge.

28.13

225948

8032.3

... More
Providing and laying reinforced cement concrete in concrete mix M40 for Service Trench excluding cost of steel reinforcements in position as per approved drawing and as directed by the Engineer-In-Charge including shuttering, mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge.

4.5

62433

13874

... More
Fabricating and placing in position of steel reinforcement TMT bars(Fe 500D)confirming to IS 1786 specifications of SAIL/RINL/TISCON for all reinforced cement concrete pile including lifting hook, cutting, bending, tying with 16 gauge G.I. binding wire and welding to proper specifications wherever required including cost of steel and binding wire, cover blocks of 100mm dia in CC M40 mix, supply of with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees, etc. all complete as directed by the Engineer-In-Charge.

111.45

10812020

97012.3

... More
Supply of Fe500D steel confirming to IS specification of SAIL/ RINL/ TISCON/ Electro steel brands for precast pile muff including cutting, straightening, bending , binding & plaving the grills in position for RCC works including cost of binding wire of 16 to 18 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees, VAT, etc. all complete as directed by the Engineer-In-Charge.

1.68

156526

93170.4

... More
Supply of Fe500D steel confirming to IS specification of SAIL/ RINL/ TISCON/ Electro steel brands for Main Beams including cutting, straightening, bending , binding & plaving the grills in position for RCC works including cost of binding wire of 16 to 18 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees, VAT, etc. all complete as directed by the Engineer-In-Charge.

6.57

612129

93170.4

... More
Supply of Fe500D steel confirming to IS specification of SAIL/ RINL/ TISCON/ Electro steel brands for Long Beams including cutting, straightening, bending , binding & plaving the grills in position for RCC works including cost of binding wire of 16 to 18 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees, VAT, etc. all complete as directed by the Engineer-In-Charge.

7.21

671758

93170.4

... More
Supply of Fe500D steel confirming to IS specification of SAIL/ RINL/ TISCON/ Electro steel brands for Coping Beams including cutting, straightening, bending , binding & plaving the grills in position for RCC works including cost of binding wire of 16 to 18 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees, etc. all complete as directed by the Engineer-In-Charge.

1.83

170501

93170.4

... More
Supply of Fe500D steel confirming to IS specification of SAIL/ RINL/ TISCON/ Electro steel brands for Slab including cutting, straightening, bending , binding & plaving the grills in position for RCC works including cost of binding wire of 16 to 18 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees, VAT, etc. all complete as directed by the Engineer-In-Charge.

66.08

6156700

93170.4

... More
Supply of Fe500D steel confirming to IS specification of SAIL/ RINL/ TISCON/ Electro steel brands for Serice Trench including cutting, straightening, bending , binding & plaving the grills in position for RCC works including cost of binding wire of 16 to 18 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees,etc. all complete as directed by the Engineer-In-Charge.

0.9

83853

93170.4

... More
Conducting High Strain Dynamic Test as per standard practices(ASTMD 4945 of 1989) The rate is inclusive of testing, hire charges for all equipments like transducers, strain gauge, oscilloscope hammer crane and cost of development of pile concrete with line and dismantling the developed length of concrete, transportation of equipment, labour and furnishing the test result etc., complete and as directed by the EIC.

1

250000

250000

... More
KANINALI-APPROACH JETTY-1 - Setting up the piling gantry and connected equipment over each pile location, including cost of shifting, cost of all materials for (1000mm Dia Pile) piling gantry, labour, setting up the rig to alignment and correct dimensions as shown in the drawing and as directed by the EIC.

32

1611308

50353.4

... More
Providing and fabricating M.S.liners confirming to IS specifications of SAIL of specified thickness for required length with M.S. shoes of 1.0m height using 8mm thick M.S. plates for bored vertical pile measured from cut off level of pile to the terminating level including supplying, cutting, rolling, bending, handling and welding cost, labours, materials, accessories,all taxes, hire and running charges of all machineries, royality, labour, material, T&P, conveyance charges, Port entry fees etc. all complete as per drawings and specification as directed by Engineer-In-charge. Note:- The stiffener shall be measured under this item.In case the soil strata found to be not good in the founding level of the liner, extra depth may be provided as per site condition.

247.97

23308361

93996.7

... More
Boring through all types of soils, boulders, hard starta and rocks etc.. for vertical bored piles (1000 mm dia pile) from the existing ground level 0 mCD to the founding level(-)32.0m CD of the piles, including bailing, flushing the bore bentonite with required density, chiselling, shifting of materials etc.. complete as per directed by the Engineer-In-charge.Note:-i) In case the soil stratum at the founding level is loose the Engineer or his representative may direct the contractor to carryout additional length of boring and payment shall be made accordingly. ii) The sample of bored materials of regular interval shall be collected and produced for the verification of the Engineer or his representative at no extra cost . in case any test reqiured by engineer in-charge, bored the samples so collected shall be referred to an authorized laboratory / agency identified by the Engineer , cost for testing shall be included in the quoted rate. engineer in-charge decision regarding founding level is final.`no claims in this regards are entertained. iii) Boring through all type of soil strata means soft soil, weathered rock, cemented sand, boulders and hard rock etc., iv) The boring in all type of soil measurement will be made on the basis of depth of boring from encountered soft soil level to founding/pile termination level. v) All the boring depths shall be jointly measured actually at site and Engineer in-charge decision is final.

1024

6656000

6500

... More
Chiseling/Breaking using suitable tools and equipments the top of pile concrete up to the receipt of dense concrete and dressing the pile head suitably so as to receive the form work for deck work , including breaking to the required level exposing the pile reinforcement to sufficient length as per approved drawing for embedding into the coping beam etc. including removal of concrete debris from the site, supply of all labour, material, transportation cost, hire and running charges of all machineries complete for 1000mm dia piles as directed by the Engineer-In-Charge.

32

140441

4388.8

... More
Providing and laying reinforced cement concrete in concrete mix M40 for pile excluding cost of steel reinforcements in position as per approved drawing and as directed by the Engineer-In-Charge including mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge.

908.84

7719323

8493.6

... More
Providing and laying reinforced cement concrete in concrete mix M40 for Precast Pile muff excluding cost of steel reinforcements in position as per approved drawing and as directed by the Engineer-In-Charge including shuttering, mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge.

28.22

439709

15581.5

... More
Providing and laying reinforced cement concrete in concrete mix M40 for Insitu Beam excluding cost of steel reinforcements in position as per approved drawing and as directed by the Engineer-In-Charge including shuttering, mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge.

111.52

1637425

14682.8

... More
Providing and laying reinforced cement concrete in concrete mix M40 for Insitu Slab excluding cost of steel reinforcements in position as per approved drawing and as directed by the Engineer-In-Charge including shuttering, mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge.

112.5

1560825

13874

... More
Providing and laying reinforced cement concrete in concrete mix M40 for wearing coat as per approved drawing and as directed by the Engineer-In-Charge including mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge.

33.75

271090

8032.3

... More
Providing and laying reinforced cement concrete in concrete mix M40 for Service Trench excluding cost of steel reinforcements in position as per approved drawing and as directed by the Engineer-In-Charge including shuttering, mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge.

5.4

74919

13874

... More
Fabricating and placing in position of steel reinforcement TMT bars(Fe 500D)confirming to IS 1786 specifications of SAIL/RINL/TISCON for all reinforced cement concrete pile including lifting hook, cutting, bending, tying with 16 gauge G.I. binding wire and welding to proper specifications wherever required including cost of steel and binding wire, cover blocks of 100mm dia in CC M40 mix, supply of with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees, etc. all complete as directed by the Engineer-In-Charge.

112.37

10901272

97012.3

... More
Supply of Fe500D steel confirming to IS specification of SAIL/ RINL/ TISCON/ Electro steel brands for precast pile muff including cutting, straightening, bending , binding & plaving the grills in position for RCC works including cost of binding wire of 16 to 18 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees, etc. all complete as directed by the Engineer-In-Charge.

2.99

278579

93170.4

... More
Supply of Fe500D steel confirming to IS specification of SAIL/ RINL/ TISCON/ Electro steel brands for Main Beams including cutting, straightening, bending , binding & plaving the grills in position for RCC works including cost of binding wire of 16 to 18 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees, etc. all complete as directed by the Engineer-In-Charge.

8.76

816172

93170.4

... More
Supply of Fe500D steel confirming to IS specification of SAIL/ RINL/ TISCON/ Electro steel brands for Long Beams including cutting, straightening, bending , binding & plaving the grills in position for RCC works including cost of binding wire of 16 to 18 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees, etc. all complete as directed by the Engineer-In-Charge.

11.55

1076118

93170.4

... More
Supply of Fe500D steel confirming to IS specification of SAIL/ RINL/ TISCON/ Electro steel brands for Slab including cutting, straightening, bending , binding & plaving the grills in position for RCC works including cost of binding wire of 16 to 18 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees, etc. all complete as directed by the Engineer-In-Charge.

79.29

7387481

93170.4

... More
Supply of Fe500D steel confirming to IS specification of SAIL/ RINL/ TISCON/ Electro steel brands for Serice Trench including cutting, straightening, bending , binding & plaving the grills in position for RCC works including cost of binding wire of 16 to 18 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees,etc. all complete as directed by the Engineer-In-Charge.

1.08

100624

93170.4

... More
Conducting High Strain Dynamic Test as per standard practices(ASTMD 4945 of 1989) The rate is inclusive of testing, hire charges for all equipments like transducers, strain gauge, oscilloscope hammer crane and cost of development of pile concrete with line and dismantling the developed length of concrete, transportation of equipment, labour and furnishing the test result etc., complete and as directed by the EIC.

1

250000

250000

... More
KANINALI-APPROACH JETTY-2 - Setting up the piling gantry and connected equipment over each pile location, including cost of shifting, cost of all materials for (1000mm Dia Pile) piling gantry, labour, setting up the rig to alignment and correct dimensions as shown in the drawing and as directed by the EIC.

45

2265903

50353.4

... More
Providing and fabricating M.S.liners confirming to IS specifications of SAIL of specified thickness for required length with M.S. shoes of 1.0m height using 8mm thick M.S. plates for bored vertical pile measured from cut off level of pile to the terminating level including supplying, cutting, rolling, bending, handling and welding cost, labours, materials, accessories,all taxes, hire and running charges of all machineries, royality, labour, material, T&P, conveyance charges, Port entry fees etc. all complete as per drawings and specification as directed by Engineer-In-charge. Note:- The stiffener shall be measured under this item.In case the soil strata found to be not good in the founding level of the liner, extra depth may be provided as per site condition.

348.7

32776649

93996.7

... More
Boring through all types of soils, boulders, hard starta and rocks etc.. for vertical bored piles (1000 mm dia pile) from the existing ground level 0 mCD to the founding level(-)32.0m CD of the piles, including bailing, flushing the bore bentonite with required density, chiselling, shifting of materials etc.. complete as per directed by the Engineer-In-charge.Note:-i) In case the soil stratum at the founding level is loose the Engineer or his representative may direct the contractor to carryout additional length of boring and payment shall be made accordingly. ii) The sample of bored materials of regular interval shall be collected and produced for the verification of the Engineer or his representative at no extra cost . in case any test reqiured by engineer in-charge, bored the samples so collected shall be referred to an authorized laboratory / agency identified by the Engineer , cost for testing shall be included in the quoted rate. engineer in-charge decision regarding founding level is final.`no claims in this regards are entertained. iii) Boring through all type of soil strata means soft soil, weathered rock, cemented sand, boulders and hard rock etc., iv) The boring in all type of soil measurement will be made on the basis of depth of boring from encountered soft soil level to founding/pile termination level. v) All the boring depths shall be jointly measured actually at site and Engineer in-charge decision is final.

1440

9360000

6500

... More
Chiseling/Breaking using suitable tools and equipments the top of pile concrete up to the receipt of dense concrete and dressing the pile head suitably so as to receive the form work for deck work , including breaking to the required level exposing the pile reinforcement to sufficient length as per approved drawing for embedding into the coping beam etc. including removal of concrete debris from the site, supply of all labour, material, transportation cost, hire and running charges of all machineries complete for 1000mm dia piles as directed by the Engineer-In-Charge.

45

197496

4388.8

... More
Providing and laying reinforced cement concrete in concrete mix M40 for pile excluding cost of steel reinforcements in position as per approved drawing and as directed by the Engineer-In-Charge including mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge.

1278.06

10855330

8493.6

... More
Providing and laying reinforced cement concrete in concrete mix M40 for Precast Pile muff excluding cost of steel reinforcements in position as per approved drawing and as directed by the Engineer-In-Charge including shuttering, mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge.

39.69

618429

15581.5

... More
Providing and laying reinforced cement concrete in concrete mix M40 for Insitu Beam excluding cost of steel reinforcements in position as per approved drawing and as directed by the Engineer-In-Charge including shuttering, mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge.

134.85

1979975

14682.8

... More
Providing and laying reinforced cement concrete in concrete mix M40 for Insitu Slab excluding cost of steel reinforcements in position as per approved drawing and as directed by the Engineer-In-Charge including shuttering, mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge.

150

2081100

13874

... More
Providing and laying reinforced cement concrete in concrete mix M40 for wearing coat as per approved drawing and as directed by the Engineer-In-Charge including mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge.

45

361453

8032.3

... More
Providing and laying reinforced cement concrete in concrete mix M40 for Service Trench excluding cost of steel reinforcements in position as per approved drawing and as directed by the Engineer-In-Charge including shuttering, mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge.

10.8

149839

13874

... More
Fabricating and placing in position of steel reinforcement TMT bars(Fe 500D)confirming to IS 1786 specifications of SAIL/RINL/TISCON for all reinforced cement concrete pile including lifting hook, cutting, bending, tying with 16 gauge G.I. binding wire and welding to proper specifications wherever required including cost of steel and binding wire, cover blocks of 100mm dia in CC M40 mix, supply of with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees, etc. all complete as directed by the Engineer-In-Charge.

158.02

15329883

97012.3

... More
Supply of Fe500D steel confirming to IS specification of SAIL/ RINL/ TISCON/ Electro steel brands for precast pile muff including cutting, straightening, bending , binding & plaving the grills in position for RCC works including cost of binding wire of 16 to 18 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees, etc. all complete as directed by the Engineer-In-Charge.

4.21

392247

93170.4

... More
Supply of Fe500D steel confirming to IS specification of SAIL/ RINL/ TISCON/ Electro steel brands for Main Beams including cutting, straightening, bending , binding & plaving the grills in position for RCC works including cost of binding wire of 16 to 18 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees, etc. all complete as directed by the Engineer-In-Charge.

10.92

1017420

93170.4

... More
Supply of Fe500D steel confirming to IS specification of SAIL/ RINL/ TISCON/ Electro steel brands for Long Beams including cutting, straightening, bending , binding & plaving the grills in position for RCC works including cost of binding wire of 16 to 18 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees, VAT, etc. all complete as directed by the Engineer-In-Charge.

17.35

1616506

93170.4

... More
Supply of Fe500D steel confirming to IS specification of SAIL/ RINL/ TISCON/ Electro steel brands for Slab including cutting, straightening, bending , binding & plaving the grills in position for RCC works including cost of binding wire of 16 to 18 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees, VAT, etc. all complete as directed by the Engineer-In-Charge.

111.58

10395953

93170.4

... More
Supply of Fe500D steel confirming to IS specification of SAIL/ RINL/ TISCON/ Electro steel brands for Serice Trench including cutting, straightening, bending , binding & plaving the grills in position for RCC works including cost of binding wire of 16 to 18 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees,etc. all complete as directed by the Engineer-In-Charge.

2.16

201248

93170.4

... More
Conducting High Strain Dynamic Test as per standard practices(ASTMD 4945 of 1989) The rate is inclusive of testing, hire charges for all equipments like transducers, strain gauge, oscilloscope hammer crane and cost of development of pile concrete with line and dismantling the developed length of concrete, transportation of equipment, labour and furnishing the test result etc., complete and as directed by the EIC.

1

250000

250000

... More
KANINALI-APPROACH BUND-P.C.C of (1:3:6 ) with 4 cm down H.G.C.B metal includig hoisting, laying, compacting, curing and wateringetc. with all t&P required for the work including cost con veyance royality and all other taxes of materials compelte in all respect as per Engineer in charge.

270

1849527

6850.1

... More
Formation of rock layer with quarry stones (rough angular) weighing 3.5 T to 4 T, loading at quarry, conveying in contractors transporting by tippers / lorries including weighing in the electronic weigh bridge for the purpose of measurment, Unloading/dumping placing in position to required level, profile using crane and devices as per the drawings and specification etc., as directed by the Department Officers. ( The payment shall be made on weight basis (i.e.) laden weight minus unladden weight). The contractor has to make his own arrangements for weigh bridge in the presence of Department Officers.

1812.25

4393437

2424.3

... More
Formation of rock layer with quarry stones (rough angular) weighing 0.35 T to 0.4 T, loading at quarry, conveying in contractors transporting by tippers / lorries including weighing in the electronic weigh bridge for the purpose of measurment, Unloading/dumping placing in position to required level, profile using crane and devices as per the drawings and specification etc., as directed by the Department Officers. ( The payment shall be made on weight basis (i.e.) laden weight minus unladden weight). The contractor has to make his own arrangements for weigh bridge in the presence of Department Officers.

1432.08

3140837

2193.2

... More
Formation of filter layer with quarry stones (rough angular) weighing 1 kg to 50 kg, loading at quarry, conveying in contractors transporting by tippers / lorries including weighing in the electronic weigh bridge for the purpose of measurment, Unloading/dumping placing in position to required level, profile using crane and devices as per the drawings and specification etc., as directed by the Department Officers. ( The payment shall be made on weight basis (ie) laden weight minus unladden weight). The contractor has to make his own arrangements for weigh bridge in the presence of Department Officers.

1545.04

3388581

2193.2

... More
Filling in foudation and plinth with filling sand from approved quarry with all leads, lifts and delifts including cost, conveyance, royality, taxes, Labour & labour cess, well watering etc. complete as per specification and direction of the Engineer in charge.

2000.96

3533095

1765.7

... More
KANINALI-GANGWAY- Gang way (20m x 4m) Gangway Structure certification by IRS shall be obtained based on design confirming to any National/ International standards. The design to be submitted for the gangway shall include the bearing design, flap design, provision for lifting etc. Gangway shall be disign and built. The IRS certification including design is in the scope of contractor. The following documents shall be submitted; 1. Design calculation for loads and section modulus 2. Construction drawings with plan at bottom, plan at top, side elevation, typical sections etc 3. General arrangement drawing with details of pontoon end support and jetty end support. Type of Vehicle to be considered for design : Type 3 Truck/Bus with 3 axle (as per IRC- 1983) with Gross Tonnage of 25 Tonne

80

8000000

100000

... More
KANINALI-PONTOON-Pontoon with Guide Piles (30m x 15m). The pontoon shall be designed and built as per "Rules and Regulations for Construction and Classification of Inland waterways Vessels, July 2021, as amended". The indicative class notation would be: IW,PONTOON, Zone 1, INWATER SURVEED (10). The vessel shall comply with the requirements of the IFS Classification Note"Extended Dry-docking Scheme", and is fit for service with an extended interval of "10" years between successive dry-dockinngs. EDD(10) will be considered subject to long-life coatings (Manufacturer's guarantee that the underwater coatings used are designed to last for the interval of ten years between successive dry docking. IRS certification is mandatory to ensure the vessel's compliance with the Rules, by approval of plans, supervision of construction and witnessing tests and trails and upon successful completion of building, issue certificate of classification. The guide piles shall be designed as per IS 4651 considering all the load cases. The IRS certification including design is in the scope of contractor. Type of Vehicle to be considered for design : Type 3 Truck/Bus with 3 axle (as per IRC- 1983) with Gross Tonnage of 25 Tonne

450

45000000

100000

... More
KANINALI-WAITING HALL - Setting up the piling gantry and connected equipment over each pile location, including cost of shifting, cost of all materials for (450mm Dia Pile) piling gantry, labour, setting up the rig to alignment and correct dimensions as shown in the drawing and as directed by the EIC.

8

402827

50353.4

... More
Providing and fabricating M.S.liners confirming to IS specifications of SAIL of specified thickness for required length with M.S. shoes of 1.0m height using 8mm thick M.S. plates for bored vertical pile measured from cut off level of pile to the terminating level including supplying, cutting, rolling, bending, handling and welding cost, labours, materials, accessories,all taxes, hire and running charges of all machineries, royality, labour, material, T&P, conveyance charges, Port entry fees etc. all complete as per drawings and specification as directed by Engineer-In-charge. Note:- The stiffener shall be measured under this item.In case the soil strata found to be not good in the founding level of the liner, extra depth may be provided as per site condition.

22.25

2091426

93996.7

... More
Boring through all types of soils, boulders, hard starta and rocks etc.. for 450mm Dia vertical bored piles from the existing ground level 0 mCD to the founding level(-)32.0m CD of the piles, including bailing, flushing the bore bentonite with required density, chiselling, shifting of materials etc.. complete as per directed by the Engineer-In-charge. Note:-i) In case the soil stratum at the founding level is loose the Engineer or his representative may direct the contractor to carryout additional length of boring and payment shall be made accordingly. ii) The sample of bored materials of regular interval shall be collected and produced for the verification of the Engineer or his representative at no extra cost . in case any test reqiured by engineer in-charge, bored the samples so collected shall be referred to an authorized laboratory / agency identified by the Engineer , cost for testing shall be included in the quoted rate. engineer in-charge decision regarding founding level is final.`no claims in this regards are entertained. iii) Boring through all type of soil strata means soft soil, weathered rock, cemented sand, boulders and hard rock etc., iv) The boring in all type of soil measurement will be made on the basis of depth of boring from encountered soft soil level to founding/pile termination level. v) All the boring depths shall be jointly measured actually at site and Engineer in-charge decision is final.

292.4

1315800

4500

... More
Chiseling/Breaking using suitable tools and equipments the top of pile concrete up to the receipt of dense concrete and dressing the pile head suitably so as to receive the form work for deck work , including breaking to the required level exposing the pile reinforcement to sufficient length as per approved drawing for embedding into the coping beam etc. including removal of concrete debris from the site, supply of all labour, material, transportation cost, hire and running charges of all machineries complete for 450 mm dia piles as directed by the Engineer-In-Charge.

8

15799

1974.9

... More
Providing and laying reinforced cement concrete in concrete mix M40 for pile excluding cost of steel reinforcements in position as per approved drawing and as directed by the Engineer-In-Charge including mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge.

46.48

394782

8493.6

... More
Providing and laying reinforced cement concrete in concrete mix M40 for Precast Pile muff excluding cost of steel reinforcements in position as per approved drawing and as directed by the Engineer-In-Charge including shuttering, mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge.

1.8

28046

15581.5

... More
Earthwork excavation for foundation in all soils and sub soils and to the full depth as may be directed except hard rock requiring blasting inclusive of shoring , strutting and water where ever bailing out including necessary refilling the sides of foundation with excavated earth than and deposited the surplus earth as directed by department officer with all heads & lifts etc., completed as per standard specifications.

53.96

11158

206.8

... More
Filling in foudation and plinth with filling sand from approved quarry with all leads, lifts and delifts including cost, conveyance, royality, taxes, Labour & labour cess, well watering etc. complete as per specification and direction of the Engineer in charge.

29.39

51350

1747.2

... More
P.C.C of (1:3:6 ) with 4 cm down H.G.C.B metal includig hoisting, laying, compacting, curing and wateringetc. with all t&P required for the work including cost con veyance royality and all other taxes of materials compelte in all respect as per Engineer in charge.

7.35

50348

6850.1

... More
Providing and laying reinforced cement concrete in concrete mix M35 for Column excluding cost of steel reinforcements in position as per approved drawing and as directed by the Engineer-In-Charge including shuttering, mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge.

10.44

173236

16593.5

... More
Providing and laying reinforced cement concrete in concrete mix M35 for Beams excluding cost of steel reinforcements in position as per approved drawing and as directed by the Engineer-In-Charge including shuttering, mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge.

23.67

336215

14204.3

... More
Providing and laying reinforced cement concrete in concrete mix M35 for Insitu Slab excluding cost of steel reinforcements in position as per approved drawing and as directed by the Engineer-In-Charge including shuttering, mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge.

37.64

393782

10461.8

... More
Brick works with fly ash bricks 23 cm x 11 cm x 8 cm size having crushing strength not less than75 Kg/ cm2 with dimensional tolerance + or -2% in cement mortar (1:6) in foundation including cost conveyance,royality and all other taxes of materials etc. with curing complete in all respect as per specification and directon of Engineer in Charge.

50.37

305489

6064.9

... More
16 mm thick cement plaster in cement mortor (1:6) over brick masonary with punning including cost and conveyance of all materials with all the taxes, royality, labour, T & P required for the work etc. complete as directed by the Engineer-in-charge.

404.03

110098

272.5

... More
Supplying,fitting &fixing Vitrified tiles(600mmx600mm) in floors, treads or steps and landing on 25mm thick bed of cement mortar (1:1) (1 cement, 1 sand) jointed with neat cement slurry mixed with pigment to match the shade of the tiles including cost and conveyance of all materials and all taxes royalty, labour, labour cess, and T&P required for the work etc. complete in all respect as directed by the Engineer-in-Charge.

78.24

115552

1476.9

... More
Finishing walls with Weather coat (ISI) of approved shade in new work two coats to give an even shade including cost of paint , materials, taxes , labour, labour cess, and T&P etc. required to complete the work in all respect as directed by the Engineer-in-Charge.

74.7

6461

86.5

... More
Priming one coat with any approved primer including cost of primer , materials, taxes , labour, labour cess, and T&P etc. required to complete the work in all respect as directed by the Engineer-in-Charge. (For wood work )

6.39

422

66.1

... More
Supplying, fitting, fixing Dressed seasonal Sal wood work framed and fixed (W&P) in trusses, purlines, frames of door and windows and beams per one cum. including cost of all consumables, labour, taxes and T&P required for the work etc. complete in all respect as directed by the Engineer-in-Charge.

0.07

5618

80268.2

... More
Supplying,fitting,fixing of 32mm piasal wood or local Teak wood panelled shutters moulded panels with all labour, iron fittings, and wooden hinged cleats etc fitted fixed complete in all respect in all respect as directed by the Engineer-in-Charge.

3.2

14863

4644.8

... More
Supplying,fitting,fixing of window(sliding type)made up aluminium section 9778 as windows frame,section No,4095,4096 and 9777,39994 as shutter frame with 5mm thick glass as pannel fitted with rubber beading including locking arrangement including all fittings,including cost of materials all taxes,labour,T & P including cost of glass etc.complete as per direction of Engineer-in-charge

21.6

91432

4233

... More
Supplying, fitting & fixing of M.S. Grill for doors ,Windows & Ventilators of approved design including cost,conveyance, fabrication charges,labour,T&P required for the work etc. complete in all respect as directed by the Engineer-in-Charge.

5.07

53363

10525.4

... More
Painting two coats with approved paints on new iron work to make it finished smooth & even surface including cost of paint , materials, taxes , labour, labour cess, and T&P etc. required to complete the work in all respect as directed by the Engineer-in-Charge.

49.5

7652

154.6

... More
Finishing surface of walls with cement based wall putty ( Water Based ) of approved make to make it finished smooth & even surface including cost of paint , materials, taxes , labour, labour cess, and T&P etc. required to complete the work in all respect as directed by the Engineer-in-Charge.

286.25

21755

76

... More
Priming one coat with approved Water bound cement primer including cost of Primer to make it finished smooth & even surface, materials, taxes , labour, labour cess, and T&P etc. required to complete the work in all respect as directed by the Engineer-in-Charge.

596.6

41105

68.9

... More
Painting 2 coats to walls with Plastic emulsion paint of approved shade on new work to give an even shade to make it finished smooth & even surface including cost of paint , materials, taxes , labour, labour cess, and T&P etc. required to complete the work in all respect as directed by the Engineer-in-Charge.

590.3

55724

94.4

... More
Fabricating and placing in position of steel reinforcement TMT bars(Fe 500D)confirming to IS 1786 specifications of SAIL/RINL/TISCON for all reinforced cement concrete pile including lifting hook, cutting, bending, tying with 16 gauge G.I. binding wire and welding to proper specifications wherever required including cost of steel and binding wire, cover blocks of 100mm dia in CC M40 mix, supply of with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees, etc. all complete as directed by the Engineer-In-Charge.

8.55

829455

97012.3

... More
Supply of Fe500D steel confirming to IS specification of SAIL/ RINL/ TISCON/ Electro steel brands for precast pile muff including cutting, straightening, bending , binding & plaving the grills in position for RCC works including cost of binding wire of 16 to 18 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees, VAT, etc. all complete as directed by the Engineer-In-Charge.

0.21

19565

93170.4

... More
Supply of Fe500D steel confirming to IS specification of SAIL/ RINL/ TISCON/ Electro steel brands for Plinth Beams including cutting, straightening, bending , binding & plaving the grills in position for RCC works including cost of binding wire of 16 to 18 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees, VAT, etc. all complete as directed by the Engineer-In-Charge.

1.63

151867

93170.4

... More
Supply of Fe500D steel confirming to IS specification of SAIL/ RINL/ TISCON/ Electro steel brands for Lintel Beams including cutting, straightening, bending , binding & plaving the grills in position for RCC works including cost of binding wire of 16 to 18 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees, etc. all complete as directed by the Engineer-In-Charge.

0.63

58697

93170.4

... More
Supply of Fe500D steel confirming to IS specification of SAIL/ RINL/ TISCON/ Electro steel brands for Roof beam including cutting, straightening, bending , binding & plaving the grills in position for RCC works including cost of binding wire of 16 to 18 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees, etc. all complete as directed by the Engineer-In-Charge.

1.6

149072

93170.4

... More
Supply of Fe500D steel confirming to IS specification of SAIL/ RINL/ TISCON/ Electro steel brands for Tank beams including cutting, straightening, bending , binding & plaving the grills in position for RCC works including cost of binding wire of 16 to 18 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees, etc. all complete as directed by the Engineer-In-Charge.

0.79

73604

93170.4

... More
Supply of Fe500D steel confirming to IS specification of SAIL/ RINL/ TISCON/ Electro steel brands for column including cutting, straightening, bending , binding & plaving the grills in position for RCC works including cost of binding wire of 16 to 18 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees, etc. all complete as directed by the Engineer-In-Charge.

1.17

109009

93170.4

... More
Supply of Fe500D steel confirming to IS specification of SAIL/ RINL/ TISCON/ Electro steel brands for Slab including cutting, straightening, bending , binding & plaving the grills in position for RCC works including cost of binding wire of 16 to 18 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees, etc. all complete as directed by the Engineer-In-Charge.

4.46

415539

93170.4

... More
Providing and laying reinforced cement concrete in concrete mix M25 for Column excluding cost of steel reinforcements in position as per approved drawing and as directed by the Engineer-In-Charge including shuttering, mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge.

1.9

31259

16452.6

... More
Providing and laying reinforced cement concrete in concrete mix M25 for Beams excluding cost of steel reinforcements in position as per approved drawing and as directed by the Engineer-In-Charge including shuttering, mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge.

3.3

34882

10570.4

... More
Providing and laying reinforced cement concrete in concrete mix M25 for footing excluding cost of steel reinforcements in position as per approved drawing and as directed by the Engineer-In-Charge including shuttering, mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge.

0.23

1941

8627.2

... More
Providing and laying reinforced cement concrete in concrete mix M25 for slab excluding cost of steel reinforcements in position as per approved drawing and as directed by the Engineer-In-Charge including shuttering, mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge.

1.2

19743

16452.6

... More
Supply of Fe500D steel confirming to IS specification of SAIL/ RINL/ TISCON/ Electro steel brands for Plinth Beams including cutting, straightening, bending , binding & plaving the grills in position for RCC works including cost of binding wire of 16 to 18 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees,etc. all complete as directed by the Engineer-In-Charge.

0.08

7453

93170.4

... More
Supply of Fe500D steel confirming to IS specification of SAIL/ RINL/ TISCON/ Electro steel brands for Lintel Beams including cutting, straightening, bending , binding & plaving the grills in position for RCC works including cost of binding wire of 16 to 18 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees,etc. all complete as directed by the Engineer-In-Charge.

0.07

6521

93170.4

... More
Supply of Fe500D steel confirming to IS specification of SAIL/ RINL/ TISCON/ Electro steel brands for Roof Beam including cutting, straightening, bending , binding & plaving the grills in position for RCC works including cost of binding wire of 16 to 18 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees,etc. all complete as directed by the Engineer-In-Charge.

0.05

4658

93170.4

... More
Supply of Fe500D steel confirming to IS specification of SAIL/ RINL/ TISCON/ Electro steel brands for Column including cutting, straightening, bending , binding & plaving the grills in position for RCC works including cost of binding wire of 16 to 18 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees,etc. all complete as directed by the Engineer-In-Charge.

0.57

53107

93170.4

... More
Supply of Fe500D steel confirming to IS specification of SAIL/ RINL/ TISCON/ Electro steel brands for Slab including cutting, straightening, bending , binding & plaving the grills in position for RCC works including cost of binding wire of 16 to 18 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees,etc. all complete as directed by the Engineer-In-Charge.

0.8

74536

93170.4

... More
KANINALI-ELECTRIFICATION-Recessed wiring to Tube light point/Fan point/exhaust fan point/ call bell point with 1.5 sq.mm FR PVC insulated single core multistrand copper conductor of ISI marked with 20mm dia non-metalic PVC flexible conduit with 5A,250V Modular type switch (Make Cona/Anchor/ Havels ) & ceiling rose (Make Cona/Anchor/ Havels ) mounted on MS Box having front bakelite cover of suitable size with 1.0 Sq.mm FR PVC insulated single core multistrand copper conductor as earth wire including all accessories and connections as per the direction of Engineer-in-charge. (Make of wire Finolex/ L&T/Anchor/ Havels/ V Guard). (Excluding the cost of supplying and fixing of 100mmx100mmx60mm MS Box with backlight cover -1no for Modular Switch)

22

15749

715.9

... More
Supplying & fixing of Modular GI box for 2-modules, 18 SWG (Nominal size) on surface/ recess with suitable size of Modular Base & Cover in front including cutting the wall & making good the same in case of recessed conduit as required including all accessories and connections as per the direction of Engineer-in-charge.

22

4923

223.8

... More
Supplying & fixing of Modular GI box for 8-modules, 18 SWG (Nominal size) on surface/ recess with suitable size of Modular Base & Cover in front including cutting the wall & making good the same in case of recessed conduit as required including all accessories and connections as per the direction of Engineer-in-charge.

6

2335

389.2

... More
Supplying & fixing of 5 pin 5/6 amp Modular Type Switch and 5/6 amp Modular Type socket outlet on the existing switch box/ cover including connections etc. required as per the direction of Engineer-in-charge.

6

1376

229.4

... More
Installation,Testing and Commissioning of Stepped type ceiling fan regulator, in existing switch box including connection with 1.5 sq.mm FR PVC insulated single core multistrand copper conductor, earthing the regulator as required including all accessories and connections as per the direction of Engineer-in-charge.

6

2005

334.2

... More
Supplying and drawing 1x1.5 sq.mm FR PVC insulated single core multistrand copper conductor of ISI marked confirming to IS 694/1990 in existing surface/recessed PVC conduit as required including all accessories and connections as per the direction of Engineer-in-charge. (Make of wire Finolex/ L&T/Anchor/ Havels/ V Guard).

60

2964

49.4

... More
Recessed wiring to sub-main in 2x2.5 sq.mm FR PVC insulated single core multistrand copper conductor of ISI marked confirming to IS 694/1990 in 20mm dia non-metalic heavy duty flexible conduit 1.6mm thick alongwith 1 x 1.5 Sq.mm FR PVC insulated single core multistrand copper conductor as earth wire etc. as required including all accessories and connections as per the direction of Engineer-in-charge. (Make of wire Finolex/ L&T/Anchor/ Havels/ V Guard).

60

8910

148.5

... More
Recessed wiring to sub-main in 2x1.5 sq.mm FR PVC insulated single core multistrand copper conductor of ISI marked confirming to IS 694/1990 in 20mm dia non-metalic heavy duty flexible conduit 1.6mm thick alongwith 1 x 1.5 Sq.mm FR PVC insulated single core multistrand copper conductor as earth wire etc. as required including all accessories and connections as per the direction of Engineer-in-charge. (Make of wire Finolex/ L&T/Anchor/ Havels/ V Guard).

20

2690

134.5

... More
Supplying & fixing of 5amp to 32amp rating 240V "B" series miniature circuit breaker suitable for lighting & other loads of the Single poles in the existing MCB DB ISI marked complete with connections testing and commissioning etc. as per the direction of Engineer-in-charge.

6

807

134.5

... More
Supplying & fixing of Modular Blanking Plate of ISI Marked on the existing Modular switch board including connections etc. required as per the direction of Engineer-in-charge.

2

100

50.4

... More
Supplying Fitting & Fixing, Installation, testing and Commissioning of Ceiling fan including wiring the down rods of standard length (upto 30 cm) with 1.5sq.mm FR PVC insulated single core multistrand copper conductor etc. Required as per the direction of Engineer-in-charge(.Celing Fan Havels Fusion 1200mm make 3 blade )

6

19937

3322.9

... More
Supplying Fitting & fixing of Tube light of ISI Marked on the existing Modular switch board and celing rose including connections etc. required as per the direction of Engineer-in-charge.(Havels make 20wt LED 6500K)

16

11193

699.6

... More
Supply, Installation, Testing, and Commissioning of 63 Amp DP Main switches of following capacity (IS 13940 Part 3/1993 ) on existing surface / wall mountnting and complete with HRC Fuse links, interconnections, earthing, etc. as required as per direction of Engineer in Charge.Make-SEIMENS/HPL/ ANCHOR/ L&T/HAVELS/C & S/ RK

1

2098

2098.8

... More
Supplying & fixing of 2 WAY , SPN, Single Door MCB-DB with sheet steel enclosure, distribution board, on surface/ recess complete with tinned copper bus bar, neutral box bar, earth bar, din bar, detachable gland plate , inter connection , phospate & powder painted including earthing etc. as required (but without MCB/RCCB/Isolator) including all accessories and connections as per the direction of Engineer-in-charge.

1

495

495.6

... More
Supplying & fitting , fixing of LED Street light 50wt Havells make in all respect as per direction of Engineer-in-charge.

1

2622

2622.9

... More
Earthing with GI earth pipe 3m long 40mm dia ISI marked including all accessories and providing masonary enclouser with cover plate having locking arrangement and watering pipe etc. with charcoal & salt as required as per the direction of Engineer-in-charge.

1

2547

2547.5

... More
Providing and fixing 8 SWG (4 mm) dia copper wire on surface or in recess for loop earthing from earth electrode to PANNEL BOARD directlyas directed by the Engineer in Charge.

10

977

97.7

... More
KANINALI-SEPTIC TANK-Earth work in excavation of foundation in Ordinary soil within 50m initial lead &1.5 M initial lift including rough dressing and leveling the bed and depositing the excavated materials away from the working areas as directed by the Engineer-in-Charge.

12.27

2537

206.8

... More
Earth work in excavation of foundation in Ordinary soil within 50m initial lead &1.5 M initial lift below 1.5 mtr lift including rough dressing and leveling the bed and depositing the excavated materials away from the working areas as directed by the Engineer-in-Charge.

1.53

341

223.2

... More
P.C.C of (1:3:6 ) with 40 cm down H.G.C.B metal includig hoisting, laying, compacting, curing and wateringetc. with all t&P required for the work including cost con veyance royality and all other taxes of materials compelte in all respect as per Engineer in charge.

1.41

9658

6850.1

... More
Brick work with 1st class K.B.bricks (23cm x11cmx8cm) size having C/S not less than 75Kg/cum in C.M.(1:4) in foundation and plinth including cost and conveyance of all materials with all taxes, royalty, labour, labour cess,and T&P required for the work etc. complete as directed by the Engineer-in-Charge.

4.9

29718

6064.9

... More
16mm thick cement plaster (1:6) with standard water proofing compound including punning with cost and conveyance of all materials with all taxes, royalty, labour, labour cess,and T&P required for the work etc. complete as directed by the Engineer-in-Charge.(Inside)

11.32

3084

272.5

... More
16mm thick cement plaster (1:6) with standard water proofing compound including cost and conveyance of all materials with all taxes, royalty, labour, labour cess,and T&P required for the work etc. complete as directed by the Engineer-in-Charge. (Outside)

5.57

1517

272.5

... More
2.5 cm thick AS flooring with C.C. (1:2:4) including punning using 12mm size HGCB chips including cost and conveyance of all materials with all taxes, royalty, labour, labour cess,and T&P required for the work etc. complete as directed by the Engineer-in-Charge.

2

777

388.5

... More
Filling foundation & Plinth with KB Brick Khoa 20cm thick including cost and conveyance of all materials with all taxes, royalty, labour, labour cess,and T&P required for the work etc. complete as directed by the Engineer-in-Charge.

6.96

5326

765.3

... More
Filling in foudation and plinth with filling sand from approved quarry with all leads, lifts and delifts including cost, conveyance, royality, taxes, Labour & labour cess, well watering etc. complete as per specification and direction of the Engineer in charge.

1.19

2079

1747.2

... More
M.S. Reinfocement for R.C.C. Work Including cutting, bending, binding & tying the grills including all cost, conveyance,taxes of M.S. Reinfocement and binding wire 18 to 20 guage etc.complete in all respect as per the Specification and direction of the Engineer-in-charge.

0.39

3633

9317

... More
Rigid smooth centering and shuttering for R.C.C. works including false works and dismentalling then after casting including cost of materials complete in ground floor as per the Specification and direction of the Engineer-in-charge.(R.C.C. Floor and Roof Slab, landing balconies projecting sub-shades and chajja upto 4.3 mtr. height.)

7.91

7745

979.2

... More
Providing fitting & fixing of iron foot step of 16mm. Dia bar including all cost as per the Specification and direction of the Engineer-in-charge.

4

480

120

... More
KANINALI- PH -Earth work in excavation of foundation inhard soil within 50m initial lead &1.5 M initial lift including rough dressing and leveling the bed and depositing the excavated materials away from the working areas asdirected by the Engineer-in-Charge.

8.06

1666

206.8

... More
Filling in foudation and plinth with filling sand from approved quarry with all leads, lifts and delifts including cost, conveyance, royality, taxes, Labour & labour cess, well watering etc. complete as per specification and direction of the Engineer in charge.

1.63

2847

1747.2

... More
P.C.C of (1:3:6 ) with 40 cm down H.G.C.B metal includig hoisting, laying, compacting, curing and wateringetc. with all t&P required for the work including cost con veyance royality and all other taxes of materials compelte in all respect as per Engineer in charge.

0.6

4110

6850.1

... More
Cement concrete (1:2:4) using 12 mm size hard granite chips of approved quarry including curing,cost, conveyance, royality, taxes, Labour & labour cess, well watering etc. complete as per specification and direction of the Engineer in charge.

0.79

6553

8295.7

... More
Brick works with fly ash bricks 23 cm x 11 cm x 8 cm size having crushing strength not less than75 Kg/ cm2 with dimensional tolerance + or -2% in cement mortar (1:6) in foundation including cost conveyance,royality and all other taxes of materials etc. with curing complete in all respect as per specification and directon of Engineer in Charge.

0.13

788

6064.9

... More
12 mm thick cement plaster in cement mortor (1:4) over brick Masonary including punning with cost and conveyance of all materials with all the taxes, royality, labour, T & P required for the work etc. complete as directed by the Engineer-in-charge.

0.81

157

194

... More
SupplyM.S.rainforcement for R.C.C.work including cutting, bending, binding and straighteing with cost conveyance, labour, T&P, all taxes of M.S.rod including cost of binding wire 18 to 20 gauge complete in all respect as per the Specification and direction of the Engineer-in-charge.

-

93

93170.4

... More
Supplying all materials,labour and T&P for cutting grouves in Pucca Floors & walls for taking GI/ PVC Pipes and making good the damages as per specification including cost of all materials, labour & labour cess etc complete as per direction of Engineer-in-Charge.

30

6759

225.3

... More
Supplying all materials,labour and T&P for cutting holes through existing brick work including making good the same in cement mortar (1:4) for taking G.I. pipes and fittings /P.V.C. pipes and fittings all complete as per specification including cost of all materials, labour & labour cess etc complete as per direction of Engineer-in-Charge.

4

217

54.3

... More
Supplying & fixing on wall surface Following dia Chlorinated Polyvinyl Chloride (CPVC) pipes conforming to IS:15778, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings including Supplying & fixing the pipe with clamps at 1.00 m spacing & jointing of pipes & fittings with one step CPVC solvent cement including making good the wall & Floor and testing of joints complete as per direction of Engineer-in-Charge. (Supply pipe 32mm dia)

45

24903

553.4

... More
Supplying & fixing on wall surface Following dia Chlorinated Polyvinyl Chloride (CPVC) pipes conforming to IS:15778, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings including Supplying & fixing the pipe with clamps at 1.00 m spacing & jointing of pipes & fittings with one step CPVC solvent cement including making good the wall & Floor and testing of joints complete as per direction of Engineer-in-Charge. (Delivery pipe 25mm dia)

20

7590

379.5

... More
Supplying & fixing on wall surface Following dia Chlorinated Polyvinyl Chloride (CPVC) pipes conforming to IS:15778, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings including Supplying & fixing the pipe with clamps at 1.00 m spacing & jointing of pipes & fittings with one step CPVC solvent cement including making good the wall & Floor and testing of joints complete as per direction of Engineer-in-Charge. (Internal wiring pipe 20mm dia CPVC pipe)

30

8328

277.6

... More
Providing and fixing on wall face unplasticised Rigid UPVC Soil, Waste and Rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS: 5382, leaving10 mm gap for thermal expansion including testing as per specification including cost of all materials, labour & labour cess etc complete as per direction of Engineer-in-Charge. 90mm. dia UPVC Single Socket Pipe (Waste water line)

20

7290

364.5

... More
Supplying & Laying in trenches unplasticised UPVC pipes conforming to IS:4985-2000 and specials of the following outside diameter for all classes including jointing with supply of approved solvent cement by non-heat application method including testing as per specification complete including cost of all materials, labour & labourcess etc complete as per direction of Engineer-in-Charge. (Earth work in trenches to be measured and paid for separately)(110mm. dia UPVC Single Socket Pipe) (Soil Line)

20

10996

549.8

... More
Providing and fixing on wall face unplasticised PVC moulded fittings / accessories for unplasticised Rigid PVC Waste & Rain water pipes conforming to IS: 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion including testing as per specification including cost of all materials, labour & labour cess etc complete as per direction of Engineer-in-Charge. (110mm. Dia PVC Plain Bend)

5

1255

251.1

... More
Providing and fixing on wall face unplasticised PVC moulded fittings / accessories for unplasticised Rigid PVC Waste & Rain water pipes conforming to IS: 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion including testing as per specification including cost of all materials, labour & labour cess etc complete as per direction of Engineer-in-Charge. 110mm. Dia PVC Cowel

3

254

84.9

... More
Providing and fixing on wall face unplasticised PVC moulded fittings / accessories for unplasticised Rigid PVC Waste & Rain water pipes conforming to IS: 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion including testing as per specification including cost of all materials, labour & labour cess etc complete as per direction of Engineer-in-Charge. (110mm. Dia PVC Coupler)

1

173

173.2

... More
Providing and fixing on wall face unplasticised PVC moulded fittings / accessories for unplasticised Rigid PVC Waste & Rain water pipes conforming to IS: 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion including testing as per specification including cost of all materials, labour & labour cess etc complete as per direction of Engineer-in-Charge. (75mm dia plain bend)

2

229

114.6

... More
Providing and fixing on wall face unplasticised PVC moulded fittings / accessories for unplasticised Rigid PVC Waste & Rain water pipes conforming to IS: 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion including testing as per specification including cost of all materials, labour & labour cess etc complete as per direction of Engineer-in-Charge. (75mm dia door bend)

2

288

144

... More
Providing and fixing on wall face unplasticised PVC moulded fittings / accessories for unplasticised Rigid PVC Waste & Rain water pipes conforming to IS: 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion including testing as per specification including cost of all materials, labour & labour cess etc complete as per direction of Engineer-in-Charge. (75mm dia door Tee)

2

352

176

... More
Providing and fixing on wall face unplasticised PVC moulded fittings / accessories for unplasticised Rigid PVC Waste & Rain water pipes conforming to IS: 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion including testing as per specification including cost of all materials, labour & labour cess etc complete as per direction of Engineer-in-Charge. (75mm dia Cowel)

2

128

64.2

... More
Supplying all materials,labour and T &P for fixing of different size PVC Nahani Trap of following size of self cleaning design with stainless steel grating or without vent arm including cutting holes in walls and making good to the damages etc. all complete as per specification including cost of all materials, labour & labourcess etc complete as per direction of Engineer-in-Charge. (Nahani trap (110mm x75mm) with grating)

2

1378

689.4

... More
Supplying & fixing of bath/toilet fittings of the following size & specification including cost of fittings etc complete in all respect including cost of all materials, labour & labourcess etc complete as per specification and direction of Engineer-in-Charge. (15mm dia CP brass Pillar Cock)

2

4887

2443.6

... More
Supplying & fixing of bath/toilet fittings of the following size & specification including cost of fittings etc complete in all respect including cost of all materials, labour & labourcess etc complete as per specification and direction of Engineer-in-Charge.(15mm dia Short body CP brass bib cock )

2

2426

1213.2

... More
Supplying & fixing of bath/toilet fittings of the following size & specification including cost of fittings etc complete in all respect including cost of all materials, labour & labourcess etc complete as per specification and direction of Engineer-in-Charge. (15mm dia Long body CP brass bib cock )

2

3214

1607

... More
Supplying & fixing of bath/toilet fittings of the following size & specification including cost of fittings etc complete in all respect including cost of all materials, labour & labourcess etc complete as per specification and direction of Engineer-in-Charge. (15mm dia CP brass Angle stop cock )

4

4131

1032.9

... More
Supplying & fixing of bath/toilet fittings of the following size & specification including cost of fittings etc complete in all respect including cost of all materials, labour & labourcess etc complete as per specification and direction of Engineer-in-Charge. (15mm dia CP brass Concealed stop cock )

2

1376

688.4

... More
Supplying all labour and T &P for fixing UPVC Ball Valve (32mm dia) of the following size as per specification including cost of all materials, labour & labourcess etc complete as per direction of Engineer-in-Charge .

4

3576

894.2

... More
Supplying all labour and T &P for fixing CPVC Union (32mm dia) of following sizes as per specification including cost of all materials, labour & labourcess etc complete as per direction of Engineer-in-Charge.

4

1805

451.4

... More
Supplying & fixing Single Piece Water Closet (European type W.C pan) with integral 'P' trap conforming to IS 2556 : Part 8-2004, to the floor with wooden plug and chromium plated screws including jointing the trap with soil pipe in cement mortar (1: 1) etc with Supplying & fixing plastic seat and cover for wash down water closet with chromium plated brass hinges and rubber buffers all complete as per specification and direction of Engineer-in-Charge. (Make-Jaquar, Model- CNS-WHT-851P-P TRAP)

2

31625

15812.6

... More
Supplying & fixing 15mm dia PVC inlet connection pipe and making connection with pillar cocks and supply mains for wash basin complete as per specification and direction of Engineer-in-Charge.

24

7596

316.5

... More
Supplying & Fixing flexible (Coil shaped) PVC waste pipe for wash basin or sink 32 mm dia with length 1150 mm with PVC waste fittings including cost of all materials, labour & labourcess etc. complete as per specification & direction of the Engineer-in-Charge.

2

250

125

... More
Supplying all materials,labour and T &P for fixing Stainless Steel Towel Rail fixed to wooden plugs with chromium plated brass screws and washers including cost of all materials, labour & labourcess . all complete as per specification and direction of Engineer-in-Charge

2

3223

1611.5

... More
Supplying all materials,labour and T&P for fixing of CP brass Over head Shower of 120mm diameter and 15mm inlet including polishing, cost of all materials, labour & labourcess etc. complete as per specification and direction of Engineer-in-Charge.

2

4661

2330.6

... More
Fixing 630mm x 445mm Swivel mirror of superior glass mounted on 6mm thick A.C sheet or plywood sheet and fixed to wooden plugs with chromium plated brass screws and washers complete as per specification including cost of all materials, labour & labourcess etc complete as per specification and direction of Engineer-in-Charge.

2

8080

4040.4

... More
Fixing Wall hung wash basin 590x490x185 mm with half pedestal conforming to IS 2556 : Part 4-2004 with Cast Iron or M S brackets painted white including cutting holes in walls and making good the damages etc all complete as per specification.

2

13834

6917.3

... More
Supplying all materials,labour and T&P for fixing of CP brass soap dish holder fixed to wooden plugs with chromium plated brass screws and washers etc. all complete including cost of all materials, labour & labourcess complete as per specification and direction of Engineer-in-Charge.

4

4769

1192.3

... More
KANINALI-LAND RECLAMATION:-Formation of core with quarry stones (rough angular) weighing 1 kg to 50 kg, loading at quarry, conveying in contractors transporting by tippers / lorries including weighing in the electronic weigh bridge for the purpose of measurment, Unloading/dumping placing in position to required level, profile using crane and devices as per the drawings and specification etc., as directed by the Department Officers. ( The payment shall be made on weight basis (ie) laden weight minus unladden weight). The contractor has to make his own arrangements for weigh bridge in the presence of Department Officers.

10272.18

22528945

2193.2

... More
Formation of armour layer with quarry stones (rough angular) weighing 1 T to 3 T, loading at quarry, conveying in contractors transporting by tippers / lorries including weighing in the electronic weigh bridge for the purpose of measurment, Unloading/dumping placing in position to required level, profile using crane and devices as per the drawings and specification etc., as directed by the Department Officers. ( The payment shall be made on weight basis (ie) laden weight minus unladden weight). The contractor has to make his own arrangements for weigh bridge in the presence of Department Officers.

2682

5882162

2193.2

... More
Formation of Toe armour layer with quarry stones (rough angular) weighing 0.5 T to 1 T, loading at quarry, conveying in contractors transporting by tippers / lorries including weighing in the electronic weigh bridge for the purpose of measurment, Unloading/dumping placing in position to required level, profile using crane and devices as per the drawings and specification etc., as directed by the Department Officers. ( The payment shall be made on weight basis (ie) laden weight minus unladden weight). The contractor has to make his own arrangements for weigh bridge in the presence of Department Officers.

2783.6

6104991

2193.2

... More
Earthwork excavation by mechanical means in all soils and sub soils and to the full depth as may be directed except hard rock requiring blasting inclusive of shoring , strutting and water where ever bailing out including necessary refilling the sides of foundation with excavated earth than and deposited the surplus earth as directed by department officer with all heads & lifts etc., completed as per standard specifications.

5660.3

430748

76.1

... More
KANINALI-PARKING AREA DEVELOPMENT-Filling in foudation and plinth with filling sand from approved quarry with all leads, lifts and delifts including cost, conveyance, royality, taxes, Labour & labour cess, well watering etc. complete as per specification and direction of the Engineer in charge.

15

26208

1747.2

... More
Quarrying, collecting and supplying good moorum from approved quarry with all leads, lifts and delifts including cost, conveyance, royality taxes of all materials etc. complete and spreading the same in layers not exceeding 22.5cm and consolidation with PRR including watering etc. complete With all leads, lifts and delifts etc. complete as per specification and direction of the Engineer in charge.

45

90504

2011.2

... More
P.C.C of (1:3:6 ) 100 mm includig hoisting, laying, compacting, curing and wateringetc. with all t&P required for the work including cost con veyance royality and all other taxes of materials compelte in all respect as per Engineer in charge.

30

205503

6850.1

... More
Supplying, fitting & fixing of Paver block of 60 mm size ( Jumbo coloured) including cost and conveyance of all materials with all taxes, royalty, labour and labour cess, T&P required for the work etc. complete as directed by the Engineer-in-Charge.

300

324810

1082.7

... More
Earthwork excavation for foundation in all soils and sub soils and to the full depth as may be directed except hard rock requiring blasting inclusive of shoring , strutting and water where ever bailing out including necessary refilling the sides of foundation with excavated earth than and deposited the surplus earth as directed by department officer with all heads & lifts etc., completed as per standard specifications.

83.2

17205

206.8

... More
Filling in foudation and plinth with filling sand from approved quarry with all leads, lifts and delifts including cost, conveyance, royality, taxes, Labour & labour cess, well watering etc. complete as per specification and direction of the Engineer in charge.

4.16

7268

1747.2

... More
Providing and laying reinforced cement concrete in concrete mix M25 for Strip footing excluding cost of steel reinforcements in position as per approved drawing and as directed by the Engineer-In-Charge including shuttering, mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge.

24.96

215334

8627.2

... More
Providing and laying reinforced cement concrete in concrete mix M25 for Column excluding cost of steel reinforcements in position as per approved drawing and as directed by the Engineer-In-Charge including shuttering, mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge.

0.65

10694

16452.6

... More
Providing and laying reinforced cement concrete in concrete mix M25 for Beams excluding cost of steel reinforcements in position as per approved drawing and as directed by the Engineer-In-Charge including shuttering, mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge.

2.11

22303

10570.4

... More
Supply of Fe500D steel confirming to IS specification of SAIL/ RINL/ TISCON/ Electro steel brands for Strip Footing including cutting, straightening, bending , binding & plaving the grills in position for RCC works including cost of binding wire of 16 to 18 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees,etc. all complete as directed by the Engineer-In-Charge.

4.99

464920

93170.4

... More
Supply of Fe500D steel confirming to IS specification of SAIL/ RINL/ TISCON/ Electro steel brands for Plinth Beams including cutting, straightening, bending , binding & plaving the grills in position for RCC works including cost of binding wire of 16 to 18 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees, etc. all complete as directed by the Engineer-In-Charge.

0.73

68014

93170.4

... More
Supply of Fe500D steel confirming to IS specification of SAIL/ RINL/ TISCON/ Electro steel brands for column including cutting, straightening, bending , binding & plaving the grills in position for RCC works including cost of binding wire of 16 to 18 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees, etc. all complete as directed by the Engineer-In-Charge.

0.74

68946

93170.4

... More
Brick work with 1st class K.B.bricks (23cm x11cmx8cm) size having C/S not less than 75Kg/cum in C.M.(1:6) in foundation and plinth including cost and conveyance of all materials with all taxes, royalty, labour, labour cess,and T&P required for the work etc. complete as directed by the Engineer-in-Charge.

10.93

66289

6064.9

... More
16mm thick cement plaster (1:6) with standard water proofing compound including cost and conveyance of all materials with all taxes, royalty, labour, labour cess,and T&P required for the work etc. complete as directed by the Engineer-in-Charge.

119.7

32618

272.5

... More
Priming one coat with approved Water bound cement primer including cost of Primer to make it finished smooth & even surface, materials, taxes , labour, labour cess, and T&P etc. required to complete the work in all respect as directed by the Engineer-in-Charge.

138.06

9512

68.9

... More
Finishing walls with Weather coat (ISI) of approved shade in new work two coats to give an even shade including cost of weather coat to make it finished smooth & even surface, materials, taxes , labour, labour cess, and T&P etc. required to complete the work in all respect as directed by the Engineer-in-Charge.

138.06

11942

86.5

... More
Supplying, fitting & fixing of Stainless steel gate of approved design including cost,conveyance, fabrication charges,labour,T&P required to complete the work in all respect as directed by the Engineer-in-Charge.

7

73677

10525.4

... More
KANINALI-BOREWELL:-Labour for drilling a perfectly vertical bore hole of a specified dia for a specified depth(0-100 Mtr) below ground level in alluvial soil strata by mud Rotary Rig drilling as required to suit the site condition as per the direction of Engineer-in-charge including use of own rigs with its accessories, tools and plant and consumables etc. for lowering of finished bore suitable for lowering of 200mm dia GI/PVC pipes for housing, fitted with socket and with or without well screen as per the necessity for the soft, medium, hard and boulder formation (GI/PVC casing pipes if required by the contractor to prevent collapse of over burden portion) including lower and withdrawing of casing pipe after drilling 200mm to 450mm ia in over burden portion.

100

169200

1692

... More
Labour for drilling a perfectly vertical bore hole of a specified dia for a specified depth(101-200 Mtr) below ground level in alluvial soil strata by mud Rotary Rig drilling as required to suit the site condition as per the direction of Engineer-in-charge including use of own rigs with its accessories, tools and plant and consumables etc. for lowering of finished bore suitable for lowering of 200mm dia GI/PVC pipes for housing, fitted with socket and with or without well screen as per the necessity for the soft, medium, hard and boulder formation (GI/PVC casing pipes if required by the contractor to prevent collapse of over burden portion) including lower and withdrawing of casing pipe after drilling 200mm to 450mm ia in over burden portion.

100

204510

2045.1

... More
Labour for drilling a perfectly vertical bore hole of a specified dia for a specified depth(201-260 Mtr) below ground level in alluvial soil strata by mud Rotary Rig drilling as required to suit the site condition as per the direction of Engineer-in-charge including use of own rigs with its accessories, tools and plant and consumables etc. for lowering of finished bore suitable for lowering of 200mm dia GI/PVC pipes for housing, fitted with socket and with or without well screen as per the necessity for the soft, medium, hard and boulder formation (GI/PVC casing pipes if required by the contractor to prevent collapse of over burden portion) including lower and withdrawing of casing pipe after drilling 200mm to 450mm ia in over burden portion.

60

140094

2334.9

... More
Supply of all labour & T&P for Lowering the following size G.I/PVC Pipes with or without slotted pipes as per the necessity from ground level and fitted up in perfectly vertical position, including cutting and threading pipe and slotted pipe and fixing all jointing materials etc. complete and keeping the top of the casing pipe threaded including plugging tube wells to prevent entry of foreign from above excluding cost of fittings & jointing materials including supply and use of all necessary equipment and labour as per the direction of Engineer-in-Charge.

260

29328

112.8

... More
Cleaning and developing the production well using their own compressor continuously worked till clear and adequate discharge is obtained from the tube well including supply and use of all necessary equipment and labour as per the direction of Engineer-in-Charge.

1

29594

29594.2

... More
Supplying all labour, tools and plant and grouting with cement bentonite slurry for saline sealing in the bore around the 200mm dia P.V.C Casing pipe etc all complete as per the direction of the Engineer-in-charge. (Including the cost of Cement)

1

9843

9843.2

... More
Supplying all lbour, T&P and maaterials for packing the bore with washed gravel (size P-6) around the pipes in good quality including cost of gravel etc complete as per the directio of the Engineer-in-charge.

1

3223

3223.7

... More
Supplying all materials labour and T&P and grouting with cement slurry for sanitary sealing around the GI/PVC casing pipe up to 3 mts. Elow ground level including cost of cement all complete as per the direction of Engineer-in-charge.

1

3273

3273.7

... More
Providing supplying fitting and fixing of 5 HP 3 Phase oilfiltered 100mm dia borewell submergable pump set of KSB/ kirlosker/ crompton/texmo and other IS make with control pannel including 2.5sqmm three core PVC coated copper flat cable, 32mm dia HDPE pipe / nipple / bolt and PVC coated 6mm wire rope , U bolt , M.S clamp with all labour, T&P, taxes as applicable at site as per specification and direction of engineer in charge.

1

43610

43610.4

... More
Supplying all labour T&P, materials for Fitting & fixing of 200mm Sh-80 pipe including cost, conveyance, taxes, Labour & labour cess, etc. complete as per specification and direction of the Engineer in charge.(200mm Sch-80 Pipe)

67

153460

2290.46

... More
Supplying all labour T&P, materials for Fitting & fixing of 150mm Sh-80 pipe including cost, conveyance, taxes, Labour & labour cess, etc. complete as per specification and direction of the Engineer in charge.(150mm Sch-80 Pipe)

190

286472

1507.75

... More
Supplying all labour T&P, materials for Fitting & fixing of 150mm Sh-80 pipe including cost, conveyance, taxes, Labour & labour cess, etc. complete as per specification and direction of the Engineer in charge. (Material to be supplied by the Contractor)(150mm Sch-80 Pipe)

3

4523

1507.75

... More
Supplying all labour T&P, materials for Fitting & fixing of reduce socket including cost, conveyance, taxes, Labour & labour cess, etc. complete as per specification and direction of the Engineer in charge. (8" x 6" PVC Reduce Socket)

2

5960

2980

... More
Supplying all labour T&P, materials for Fitting & fixing including cost, conveyance, taxes, Labour & labour cess, etc. complete as per specification and direction of the Engineer in charge. (8" x 12" PVC S. P.)

1

3200

3200

... More
Supplying all labour T&P, materials for Fitting & fixing of 8" UPVC bend including cost, conveyance, taxes, Labour & labour cess, etc. complete as per specification and direction of the Engineer in charge.

15

7200

480

... More
Supplying all labour T&P, materials for Fitting & fixing of including cost, conveyance, taxes, Labour & labour cess, etc. complete as per specification and direction of the Engineer in charge. (Filter Fitting (30 Mtr))

30

14499

483.3

... More
Supplying all labour T&P, materials for Fitting & fixing of 200mm PVC cone including cost, conveyance, taxes, Labour & labour cess, etc. complete as per specification and direction of the Engineer in charge.(200mm PVC Cone)

1

2500

2500

... More
Supplying all labour T&P, materials for Fitting & fixing of pipe including cost, conveyance, taxes, Labour & labour cess, etc. complete as per specification and direction of the Engineer in charge. (75mm Sch-80 Pipe)

50

33750

675

... More
TALACHUA- MAIN JETTY - Setting up the piling gantry and connected equipment over each pile location, including cost of shifting, cost of all materials for (1000mm Dia Pile) piling gantry, labour, setting up the rig to alignment and correct dimensions as shown in the drawing and as directed by the EIC.

116

5970392

51468.9

... More
Providing and fabricating M.S.liners confirming to IS specifications of SAIL of specified thickness for required length with M.S. shoes of 1.0m height using 8mm thick M.S. plates for bored vertical pile measured from cut off level of pile to the terminating level including supplying, cutting, rolling, bending, handling and welding cost, labours, materials, accessories,all taxes, hire and running charges of all machineries, royality, labour, material, T&P, conveyance charges, Port entry fees etc. all complete as per drawings and specification as directed by Engineer-In-charge. Note:- The stiffener shall be measured under this item.In case the soil strata found to be not good in the founding level of the liner, extra depth may be provided as per site condition.

893.04

83942812

93996.7

... More
Boring through all types of soils, boulders, hard starta and rocks etc.. for 1000mm Dia vertical bored piles from the existing ground level 0 mCD to the founding level(-)32.0m CD of the piles, including bailing, flushing the bore bentonite with required density, chiselling, shifting of materials etc.. complete as per directed by the Engineer-In-charge. Note:-i) In case the soil stratum at the founding level is loose the Engineer or his representative may direct the contractor to carryout additional length of boring and payment shall be made accordingly. ii) The sample of bored materials of regular interval shall be collected and produced for the verification of the Engineer or his representative at no extra cost . in case any test reqiured by engineer in-charge, bored the samples so collected shall be referred to an authorized laboratory / agency identified by the Engineer , cost for testing shall be included in the quoted rate. engineer in-charge decision regarding founding level is final.`no claims in this regards are entertained. iii) Boring through all type of soil strata means soft soil, weathered rock, cemented sand, boulders and hard rock etc., iv) The boring in all type of soil measurement will be made on the basis of depth of boring from encountered soft soil level to founding/pile termination level. v) All the boring depths shall be jointly measured actually at site and Engineer in-charge decision is final.

3712

24128000

6500

... More
Chiseling/Breaking using suitable tools and equipments the top of pile concrete up to the receipt of dense concrete and dressing the pile head suitably so as to receive the form work for deck work , including breaking to the required level exposing the pile reinforcement to sufficient length as per approved drawing for embedding into the coping beam etc. including removal of concrete debris from the site, supply of all labour, material, transportation cost, hire and running charges of all machineries complete for 1000mm dia piles as directed by the Engineer-In-Charge.

116

509100

4388.8

... More
Providing and laying reinforced cement concrete in concrete mix M40 for pile excluding cost of steel reinforcements in position as per approved drawing and as directed by the Engineer-In-Charge including mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge.

3271.67

28138325

8600.6

... More
Providing and laying reinforced cement concrete in concrete mix M40 for Precast Pile muff excluding cost of steel reinforcements in position as per approved drawing and as directed by the Engineer-In-Charge including shuttering, mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge.

108.73

1718684

15806.9

... More
Providing and laying reinforced cement concrete in concrete mix M40 for Insitu Beam excluding cost of steel reinforcements in position as per approved drawing and as directed by the Engineer-In-Charge including shuttering, mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge.

505.88

7534779

14894.4

... More
Providing and laying reinforced cement concrete in concrete mix M40 for Insitu Slab excluding cost of steel reinforcements in position as per approved drawing and as directed by the Engineer-In-Charge including shuttering, mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge.

431.25

6069024

14073.1

... More
Providing and laying reinforced cement concrete in concrete mix M40 for wearing coat as per approved drawing and as directed by the Engineer-In-Charge including mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge.

129.38

1053347

8141.5

... More
Providing and laying reinforced cement concrete in concrete mix M40 for Service Trench excluding cost of steel reinforcements in position as per approved drawing and as directed by the Engineer-In-Charge including shuttering, mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge.

20.7

291313

14073.1

... More
Fabricating and placing in position of steel reinforcement TMT bars(Fe 500D)confirming to IS 1786 specifications of SAIL/RINL/TISCON for all reinforced cement concrete pile including lifting hook, cutting, bending, tying with 16 gauge G.I. binding wire and welding to proper specifications wherever required including cost of steel and binding wire, cover blocks of 100mm dia in CC M40 mix, supply of with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees, etc. all complete as directed by the Engineer-In-Charge.

404.62

38854485

96027.1

... More
Supply of Fe500D steel confirming to IS specification of SAIL/ RINL/ TISCON/ Electro steel brands for Precast pile muff including cutting, straightening, bending , binding & plaving the grills in position for RCC works including cost of binding wire of 16 to 18 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees, etc. all complete as directed by the Engineer-In-Charge.

11.52

1072705

93116.8

... More
Supply of Fe500D steel confirming to IS specification of SAIL/ RINL/ TISCON/ Electro steel brands for Main Beams including cutting, straightening, bending , binding & plaving the grills in position for RCC works including cost of binding wire of 16 to 18 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees, etc. all complete as directed by the Engineer-In-Charge.

31.76

2957389

93116.8

... More
Supply of Fe500D steel confirming to IS specification of SAIL/ RINL/ TISCON/ Electro steel brands for Long Beams including cutting, straightening, bending , binding & plaving the grills in position for RCC works including cost of binding wire of 16 to 18 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees, etc. all complete as directed by the Engineer-In-Charge.

33.74

3141760

93116.8

... More
Supply of Fe500D steel confirming to IS specification of SAIL/ RINL/ TISCON/ Electro steel brands for Slab including cutting, straightening, bending , binding & plaving the grills in position for RCC works including cost of binding wire of 16 to 18 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees, etc. all complete as directed by the Engineer-In-Charge.

303.95

28302851

93116.8

... More
Supply of Fe500D steel confirming to IS specification of SAIL/ RINL/ TISCON/ Electro steel brands for Service Trench including cutting, straightening, bending , binding & plaving the grills in position for RCC works including cost of binding wire of 16 to 18 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees, etc. all complete as directed by the Engineer-In-Charge.

4.14

385503

93116.8

... More
Conducting High Strain Dynamic Test as per standard practices(ASTMD 4945 of 1989) The rate is inclusive of testing, hire charges for all equipments like transducers, strain gauge, oscilloscope hammer crane and cost of development of pile concrete with line and dismantling the developed length of concrete, transportation of equipment, labour and furnishing the test result etc., complete and as directed by the EIC.

2

500000

250000

... More
Supplying, handling, transporting and fixing in position of Arch fender of size DAV- 500x1500 mm Length as per Drawing with anchor bolts, U hooks, Chains,shall be hot dip G.I coating with 80micron including cutting, concrete chipping, drilling, grouting, necessary welding with deck reinforcement steel and necessary coal tar painting(wherever required) including all materials, labour, consumable items, machineries, tools, tackles,transportation etc.complete as per Engineer Incharge.

9

1098000

122000

... More
Supplying, handling, transporting and fixing in position of Cast iron Bollard (20T ton capacity)with necessary cutting, concrete chipping, drilling, grouting, welding with deck reinforcement steel and necessary coal tar painting(wherever required) including all materials, labour , consumable items etc. complete as per drawing and specifications as directed by the EIC.

13

334100

25700

... More
TALACHUA- LANDING JETTY - Setting up the piling gantry and connected equipment over each pile location, including cost of shifting, cost of all materials for (750mm & 1000mm Dia Pile) piling gantry, labour, setting up the rig to alignment and correct dimensions as shown in the drawing and as directed by the EIC.

48

2470507

51468.9

... More
Providing and fabricating M.S.liners confirming to IS specifications of SAIL of specified thickness for required length with M.S. shoes of 1.0m height using 8mm thick M.S. plates for bored vertical pile measured from cut off level of pile to the terminating level including supplying, cutting, rolling, bending, handling and welding cost, labours, materials, accessories,all taxes, hire and running charges of all machineries, royality, labour, material, T&P, conveyance charges, Port entry fees etc. all complete as per drawings and specification as directed by Engineer-In-charge Note:- The stiffener shall be measured under this item.In case the soil strata found to be not good in the founding level of the liner, extra depth may be provided as per site condition.

290.07

27265622

93996.7

... More
Boring through all types of soils, boulders, hard starta and rocks etc.. for vertical bored piles (1000 mm dia pile) from the existing ground level 0 mCD to the founding level(-)32.0m CD of the piles, including bailing, flushing the bore bentonite with required density, chiselling, shifting of materials etc.. complete as per directed by the Engineer-In-charge.Note:-i) In case the soil stratum at the founding level is loose the Engineer or his representative may direct the contractor to carryout additional length of boring and payment shall be made accordingly. ii) The sample of bored materials of regular interval shall be collected and produced for the verification of the Engineer or his representative at no extra cost . in case any test reqiured by engineer in-charge, bored the samples so collected shall be referred to an authorized laboratory / agency identified by the Engineer , cost for testing shall be included in the quoted rate. engineer in-charge decision regarding founding level is final.`no claims in this regards are entertained. iii) Boring through all type of soil strata means soft soil, weathered rock, cemented sand, boulders and hard rock etc., iv) The boring in all type of soil measurement will be made on the basis of depth of boring from encountered soft soil level to founding/pile termination level. v) All the boring depths shall be jointly measured actually at site and Engineer in-charge decision is final.

576

3744000

6500

... More
Boring through all types of soils, boulders, hard starta and rocks etc.. for vertical bored piles (750 mm dia pile) from the existing ground level 0 mCD to the founding level(-)32.0m CD of the piles, including bailing, flushing the bore bentonite with required density, chiselling, shifting of materials etc.. complete as per directed by the Engineer-In-charge.Note:-i) In case the soil stratum at the founding level is loose the Engineer or his representative may direct the contractor to carryout additional length of boring and payment shall be made accordingly. ii) The sample of bored materials of regular interval shall be collected and produced for the verification of the Engineer or his representative at no extra cost . in case any test reqiured by engineer in-charge, bored the samples so collected shall be referred to an authorized laboratory / agency identified by the Engineer , cost for testing shall be included in the quoted rate. engineer in-charge decision regarding founding level is final.`no claims in this regards are entertained. iii) Boring through all type of soil strata means soft soil, weathered rock, cemented sand, boulders and hard rock etc., iv) The boring in all type of soil measurement will be made on the basis of depth of boring from encountered soft soil level to founding/pile termination level. v) All the boring depths shall be jointly measured actually at site and Engineer in-charge decision is final.

780

4290000

5500

... More
Chiseling/Breaking using suitable tools and equipments the top of pile (1000 mm dia pile) concrete up to the receipt of dense concrete and dressing the pile head suitably so as to receive the form work for deck work , including breaking to the required level exposing the pile reinforcement to sufficient length as per approved drawing for embedding into the coping beam etc. including removal of concrete debris from the site, supply of all labour, material, transportation cost, hire and running charges of all machineries complete as directed by the Engineer-In-Charge.

18

78998

4388.8

... More
Chiseling/Breaking using suitable tools and equipments the top of pile(750 mm dia pile) concrete up to the receipt of dense concrete and dressing the pile head suitably so as to receive the form work for deck work , including breaking to the required level exposing the pile reinforcement to sufficient length as per approved drawing for embedding into the coping beam etc. including removal of concrete debris from the site, supply of all labour, material, transportation cost, hire and running charges of all machineries complete as directed by the Engineer-In-Charge.

30

98748

3291.6

... More
Providing and laying reinforced cement concrete in concrete mix M40 for pile excluding cost of steel reinforcements in position as per approved drawing and as directed by the Engineer-In-Charge including mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge.

916.84

7885374

8600.6

... More
Providing and laying reinforced cement concrete in concrete mix M40 for Precast Pile muff excluding cost of steel reinforcements in position as per approved drawing and as directed by the Engineer-In-Charge including shuttering, mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge.

15.88

251013

15806.9

... More
Providing and laying reinforced cement concrete in concrete mix M40 for Insitu Beam excluding cost of steel reinforcements in position as per approved drawing and as directed by the Engineer-In-Charge including shuttering, mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge.

89.14

1327686

14894.4

... More
Providing and laying reinforced cement concrete in concrete mix M40 for Insitu Slab excluding cost of steel reinforcements in position as per approved drawing and as directed by the Engineer-In-Charge including shuttering, mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge.

93.75

1319353

14073.1

... More
Providing and laying reinforced cement concrete in concrete mix M40 for wearing coat as per approved drawing and as directed by the Engineer-In-Charge including mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge.

28.13

229020

8141.5

... More
Providing and laying reinforced cement concrete in concrete mix M40 for Service Trench excluding cost of steel reinforcements in position as per approved drawing and as directed by the Engineer-In-Charge including shuttering, mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge.

4.5

63328

14073.1

... More
Fabricating and placing in position of steel reinforcement TMT bars(Fe 500D)confirming to IS 1786 specifications of SAIL/RINL/TISCON for all reinforced cement concrete pile including lifting hook, cutting, bending, tying with 16 gauge G.I. binding wire and welding to proper specifications wherever required including cost of steel and binding wire, cover blocks of 100mm dia in CC M40 mix, supply of with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees, etc. all complete as directed by the Engineer-In-Charge.

111.45

10702220

96027.1

... More
Supply of Fe500D steel confirming to IS specification of SAIL/ RINL/ TISCON/ Electro steel brands for precast pile muff including cutting, straightening, bending , binding & plaving the grills in position for RCC works including cost of binding wire of 16 to 18 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees, VAT, etc. all complete as directed by the Engineer-In-Charge.

1.68

156436

93116.8

... More
Supply of Fe500D steel confirming to IS specification of SAIL/ RINL/ TISCON/ Electro steel brands for Main Beams including cutting, straightening, bending , binding & plaving the grills in position for RCC works including cost of binding wire of 16 to 18 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees, VAT, etc. all complete as directed by the Engineer-In-Charge.

6.57

611777

93116.8

... More
Supply of Fe500D steel confirming to IS specification of SAIL/ RINL/ TISCON/ Electro steel brands for Long Beams including cutting, straightening, bending , binding & plaving the grills in position for RCC works including cost of binding wire of 16 to 18 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees, etc. all complete as directed by the Engineer-In-Charge.

7.21

671372

93116.8

... More
Supply of Fe500D steel confirming to IS specification of SAIL/ RINL/ TISCON/ Electro steel brands for Coping Beams including cutting, straightening, bending , binding & plaving the grills in position for RCC works including cost of binding wire of 16 to 18 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees, etc. all complete as directed by the Engineer-In-Charge.

1.83

170403

93116.8

... More
Supply of Fe500D steel confirming to IS specification of SAIL/ RINL/ TISCON/ Electro steel brands for Slab including cutting, straightening, bending , binding & plaving the grills in position for RCC works including cost of binding wire of 16 to 18 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees, etc. all complete as directed by the Engineer-In-Charge.

66.08

6153158

93116.8

... More
Supply of Fe500D steel confirming to IS specification of SAIL/ RINL/ TISCON/ Electro steel brands for Serice Trench including cutting, straightening, bending , binding & plaving the grills in position for RCC works including cost of binding wire of 16 to 18 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees,etc. all complete as directed by the Engineer-In-Charge.

0.9

83805

93116.8

... More
Conducting High Strain Dynamic Test as per standard practices(ASTMD 4945 of 1989) The rate is inclusive of testing, hire charges for all equipments like transducers, strain gauge, oscilloscope hammer crane and cost of development of pile concrete with line and dismantling the developed length of concrete, transportation of equipment, labour and furnishing the test result etc., complete and as directed by the EIC.

1

250000

250000

... More
TALACHUA-APPROACH JETTY-1 - Setting up the piling gantry and connected equipment over each pile location, including cost of shifting, cost of all materials for (1000mm Dia Pile) piling gantry, labour, setting up the rig to alignment and correct dimensions as shown in the drawing and as directed by the EIC.

32

1647004

51468.9

... More
Providing and fabricating M.S.liners confirming to IS specifications of SAIL of specified thickness for required length with M.S. shoes of 1.0m height using 8mm thick M.S. plates for bored vertical pile measured from cut off level of pile to the terminating level including supplying, cutting, rolling, bending, handling and welding cost, labours, materials, accessories,all taxes, hire and running charges of all machineries, royality, labour, material, T&P, conveyance charges, Port entry fees etc. all complete as per drawings and specification as directed by Engineer-In-charge. Note:- The stiffener shall be measured under this item.In case the soil strata found to be not good in the founding level of the liner, extra depth may be provided as per site condition.

247.97

23308361

93996.7

... More
Boring through all types of soils, boulders, hard starta and rocks etc.. for vertical bored piles (1000 mm dia pile) from the existing ground level 0 mCD to the founding level(-)32.0m CD of the piles, including bailing, flushing the bore bentonite with required density, chiselling, shifting of materials etc.. complete as per directed by the Engineer-In-charge.Note:-i) In case the soil stratum at the founding level is loose the Engineer or his representative may direct the contractor to carryout additional length of boring and payment shall be made accordingly. ii) The sample of bored materials of regular interval shall be collected and produced for the verification of the Engineer or his representative at no extra cost . in case any test reqiured by engineer in-charge, bored the samples so collected shall be referred to an authorized laboratory / agency identified by the Engineer , cost for testing shall be included in the quoted rate. engineer in-charge decision regarding founding level is final.`no claims in this regards are entertained. iii) Boring through all type of soil strata means soft soil, weathered rock, cemented sand, boulders and hard rock etc., iv) The boring in all type of soil measurement will be made on the basis of depth of boring from encountered soft soil level to founding/pile termination level. v) All the boring depths shall be jointly measured actually at site and Engineer in-charge decision is final.

1024

6656000

6500

... More
Chiseling/Breaking using suitable tools and equipments the top of pile concrete up to the receipt of dense concrete and dressing the pile head suitably so as to receive the form work for deck work , including breaking to the required level exposing the pile reinforcement to sufficient length as per approved drawing for embedding into the coping beam etc. including removal of concrete debris from the site, supply of all labour, material, transportation cost, hire and running charges of all machineries complete for 1000mm dia piles as directed by the Engineer-In-Charge.

32

140441

4388.8

... More
Providing and laying reinforced cement concrete in concrete mix M40 for pile excluding cost of steel reinforcements in position as per approved drawing and as directed by the Engineer-In-Charge including mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge.

908.84

7816569

8600.6

... More
Providing and laying reinforced cement concrete in concrete mix M40 for Precast Pile muff excluding cost of steel reinforcements in position as per approved drawing and as directed by the Engineer-In-Charge including shuttering, mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge.

28.22

446070

15806.9

... More
Providing and laying reinforced cement concrete in concrete mix M40 for Insitu Beam excluding cost of steel reinforcements in position as per approved drawing and as directed by the Engineer-In-Charge including shuttering, mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge.

111.52

1661023

14894.4

... More
Providing and laying reinforced cement concrete in concrete mix M40 for Insitu Slab excluding cost of steel reinforcements in position as per approved drawing and as directed by the Engineer-In-Charge including shuttering, mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge.

112.5

1583223

14073.1

... More
Providing and laying reinforced cement concrete in concrete mix M40 for wearing coat as per approved drawing and as directed by the Engineer-In-Charge including mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge.

33.75

274775

8141.5

... More
Providing and laying reinforced cement concrete in concrete mix M40 for Service Trench excluding cost of steel reinforcements in position as per approved drawing and as directed by the Engineer-In-Charge including shuttering, mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge.

5.4

75994

14073.1

... More
Fabricating and placing in position of steel reinforcement TMT bars(Fe 500D)confirming to IS 1786 specifications of SAIL/RINL/TISCON for all reinforced cement concrete pile including lifting hook, cutting, bending, tying with 16 gauge G.I. binding wire and welding to proper specifications wherever required including cost of steel and binding wire, cover blocks of 100mm dia in CC M40 mix, supply of with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees, etc. all complete as directed by the Engineer-In-Charge.

112.37

10790565

96027.1

... More
Supply of Fe500D steel confirming to IS specification of SAIL/ RINL/ TISCON/ Electro steel brands for precast pile muff including cutting, straightening, bending , binding & plaving the grills in position for RCC works including cost of binding wire of 16 to 18 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees, etc. all complete as directed by the Engineer-In-Charge.

2.99

278419

93116.8

... More
Supply of Fe500D steel confirming to IS specification of SAIL/ RINL/ TISCON/ Electro steel brands for Main Beams including cutting, straightening, bending , binding & plaving the grills in position for RCC works including cost of binding wire of 16 to 18 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees, etc. all complete as directed by the Engineer-In-Charge.

8.76

815703

93116.8

... More
Supply of Fe500D steel confirming to IS specification of SAIL/ RINL/ TISCON/ Electro steel brands for Long Beams including cutting, straightening, bending , binding & plaving the grills in position for RCC works including cost of binding wire of 16 to 18 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees, etc. all complete as directed by the Engineer-In-Charge.

11.55

1075499

93116.8

... More
Supply of Fe500D steel confirming to IS specification of SAIL/ RINL/ TISCON/ Electro steel brands for Slab including cutting, straightening, bending , binding & plaving the grills in position for RCC works including cost of binding wire of 16 to 18 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees, etc. all complete as directed by the Engineer-In-Charge.

79.29

7383231

93116.8

... More
Supply of Fe500D steel confirming to IS specification of SAIL/ RINL/ TISCON/ Electro steel brands for Serice Trench including cutting, straightening, bending , binding & plaving the grills in position for RCC works including cost of binding wire of 16 to 18 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees,etc. all complete as directed by the Engineer-In-Charge.

1.08

100566

93116.8

... More
Conducting High Strain Dynamic Test as per standard practices(ASTMD 4945 of 1989) The rate is inclusive of testing, hire charges for all equipments like transducers, strain gauge, oscilloscope hammer crane and cost of development of pile concrete with line and dismantling the developed length of concrete, transportation of equipment, labour and furnishing the test result etc., complete and as directed by the EIC.

1

250000

250000

... More
TALACHUA-APPROACH JETTY-2 - Setting up the piling gantry and connected equipment over each pile location, including cost of shifting, cost of all materials for (1000mm Dia Pile) piling gantry, labour, setting up the rig to alignment and correct dimensions as shown in the drawing and as directed by the EIC.

39

2007287

51468.9

... More
Providing and fabricating M.S.liners confirming to IS specifications of SAIL of specified thickness for required length with M.S. shoes of 1.0m height using 8mm thick M.S. plates for bored vertical pile measured from cut off level of pile to the terminating level including supplying, cutting, rolling, bending, handling and welding cost, labours, materials, accessories,all taxes, hire and running charges of all machineries, royality, labour, material, T&P, conveyance charges, Port entry fees etc. all complete as per drawings and specification as directed by Engineer-In-charge. Note:- The stiffener shall be measured under this item.In case the soil strata found to be not good in the founding level of the liner, extra depth may be provided as per site condition.

302.21

28406742

93996.7

... More
Boring through all types of soils, boulders, hard starta and rocks etc.. for vertical bored piles (1000 mm dia pile) from the existing ground level 0 mCD to the founding level(-)32.0m CD of the piles, including bailing, flushing the bore bentonite with required density, chiselling, shifting of materials etc.. complete as per directed by the Engineer-In-charge.Note:-i) In case the soil stratum at the founding level is loose the Engineer or his representative may direct the contractor to carryout additional length of boring and payment shall be made accordingly. ii) The sample of bored materials of regular interval shall be collected and produced for the verification of the Engineer or his representative at no extra cost . in case any test reqiured by engineer in-charge, bored the samples so collected shall be referred to an authorized laboratory / agency identified by the Engineer , cost for testing shall be included in the quoted rate. engineer in-charge decision regarding founding level is final.`no claims in this regards are entertained. iii) Boring through all type of soil strata means soft soil, weathered rock, cemented sand, boulders and hard rock etc., iv) The boring in all type of soil measurement will be made on the basis of depth of boring from encountered soft soil level to founding/pile termination level. v) All the boring depths shall be jointly measured actually at site and Engineer in-charge decision is final.

1248

8112000

6500

... More
Chiseling/Breaking using suitable tools and equipments the top of pile concrete up to the receipt of dense concrete and dressing the pile head suitably so as to receive the form work for deck work , including breaking to the required level exposing the pile reinforcement to sufficient length as per approved drawing for embedding into the coping beam etc. including removal of concrete debris from the site, supply of all labour, material, transportation cost, hire and running charges of all machineries complete for 1000mm dia piles as directed by the Engineer-In-Charge.

39

171163

4388.8

... More
Providing and laying reinforced cement concrete in concrete mix M40 for pile excluding cost of steel reinforcements in position as per approved drawing and as directed by the Engineer-In-Charge including mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge.

1107.65

9526454

8600.6

... More
Providing and laying reinforced cement concrete in concrete mix M40 for Precast Pile muff excluding cost of steel reinforcements in position as per approved drawing and as directed by the Engineer-In-Charge including shuttering, mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge.

34.4

543757

15806.9

... More
Providing and laying reinforced cement concrete in concrete mix M40 for Insitu Beam excluding cost of steel reinforcements in position as per approved drawing and as directed by the Engineer-In-Charge including shuttering, mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge.

127.87

1904546

14894.4

... More
Providing and laying reinforced cement concrete in concrete mix M40 for Insitu Slab excluding cost of steel reinforcements in position as per approved drawing and as directed by the Engineer-In-Charge including shuttering, mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge.

125

1759137

14073.1

... More
Providing and laying reinforced cement concrete in concrete mix M40 for wearing coat as per approved drawing and as directed by the Engineer-In-Charge including mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge.

37.5

305306

8141.5

... More
Providing and laying reinforced cement concrete in concrete mix M40 for Service Trench excluding cost of steel reinforcements in position as per approved drawing and as directed by the Engineer-In-Charge including shuttering, mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge.

9

126657

14073.1

... More
Fabricating and placing in position of steel reinforcement TMT bars(Fe 500D)confirming to IS 1786 specifications of SAIL/RINL/TISCON for all reinforced cement concrete pile including lifting hook, cutting, bending, tying with 16 gauge G.I. binding wire and welding to proper specifications wherever required including cost of steel and binding wire, cover blocks of 100mm dia in CC M40 mix, supply of with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees, etc. all complete as directed by the Engineer-In-Charge.

136.95

13150911

96027.1

... More
Supply of Fe500D steel confirming to IS specification of SAIL/ RINL/ TISCON/ Electro steel brands for precast pile muff including cutting, straightening, bending , binding & plaving the grills in position for RCC works including cost of binding wire of 16 to 18 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees, etc. all complete as directed by the Engineer-In-Charge.

3.65

339876

93116.8

... More
Supply of Fe500D steel confirming to IS specification of SAIL/ RINL/ TISCON/ Electro steel brands for Main Beams including cutting, straightening, bending , binding & plaving the grills in position for RCC works including cost of binding wire of 16 to 18 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees, etc. all complete as directed by the Engineer-In-Charge.

9.47

881816

93116.8

... More
Supply of Fe500D steel confirming to IS specification of SAIL/ RINL/ TISCON/ Electro steel brands for Long Beams including cutting, straightening, bending , binding & plaving the grills in position for RCC works including cost of binding wire of 16 to 18 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees, etc. all complete as directed by the Engineer-In-Charge.

14.45

1345537

93116.8

... More
Supply of Fe500D steel confirming to IS specification of SAIL/ RINL/ TISCON/ Electro steel brands for Slab including cutting, straightening, bending , binding & plaving the grills in position for RCC works including cost of binding wire of 16 to 18 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees, etc. all complete as directed by the Engineer-In-Charge.

88.1

8203590

93116.8

... More
Supply of Fe500D steel confirming to IS specification of SAIL/ RINL/ TISCON/ Electro steel brands for Serice Trench including cutting, straightening, bending , binding & plaving the grills in position for RCC works including cost of binding wire of 16 to 18 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees,etc. all complete as directed by the Engineer-In-Charge.

1.8

167610

93116.8

... More
Conducting High Strain Dynamic Test as per standard practices(ASTMD 4945 of 1989) The rate is inclusive of testing, hire charges for all equipments like transducers, strain gauge, oscilloscope hammer crane and cost of development of pile concrete with line and dismantling the developed length of concrete, transportation of equipment, labour and furnishing the test result etc., complete and as directed by the EIC.

1

250000

250000

... More
TALACHUA-GANGWAY- Gang way (20m x 4m) Gangway Structure certification by IRS shall be obtained based on design confirming to any National/ International standards. The design to be submitted for the gangway shall include the bearing design, flap design, provision for lifting etc. Gangway shall be disign and built. The IRS certification including design is in the scope of contractor. The following documents shall be submitted; 1. Design calculation for loads and section modulus 2. Construction drawings with plan at bottom, plan at top, side elevation, typical sections etc 3. General arrangement drawing with details of pontoon end support and jetty end support. Type of Vehicle to be considered for design : Type 3 Truck/Bus with 3 axle (as per IRC- 1983) with Gross Tonnage of 25 Tonne

80

8000000

100000

... More
TALACHUA-PONTOON-Pontoon with Guide Piles (30m x 15m). The pontoon shall be designed and built as per "Rules and Regulations for Construction and Classification of Inland waterways Vessels, July 2021, as amended". The indicative class notation would be: IW,PONTOON, Zone 1, INWATER SURVEED (10). The vessel shall comply with the requirements of the IFS Classification Note"Extended Dry-docking Scheme", and is fit for service with an extended interval of "10" years between successive dry-dockinngs. EDD(10) will be considered subject to long-life coatings (Manufacturer's guarantee that the underwater coatings used are designed to last for the interval of ten years between successive dry docking. IRS certification is mandatory to ensure the vessel's compliance with the Rules, by approval of plans, supervision of construction and witnessing tests and trails and upon successful completion of building, issue certificate of classification. The guide piles shall be designed as per IS 4651 considering all the load cases. The IRS certification including design is in the scope of contractor. Type of Vehicle to be considered for design : Type 3 Truck/Bus with 3 axle (as per IRC- 1983) with Gross Tonnage of 25 Tonne

450

45000000

100000

... More
TALACHUA-WAITING HALL - Setting up the piling gantry and connected equipment over each pile location, including cost of shifting, cost of all materials for (450mm Dia Pile) piling gantry, labour, setting up the rig to alignment and correct dimensions as shown in the drawing and as directed by the EIC.

8

411751

51468.9

... More
Providing and fabricating M.S.liners confirming to IS specifications of SAIL of specified thickness for required length with M.S. shoes of 1.0m height using 8mm thick M.S. plates for bored vertical pile measured from cut off level of pile to the terminating level including supplying, cutting, rolling, bending, handling and welding cost, labours, materials, accessories,all taxes, hire and running charges of all machineries, royality, labour, material, T&P, conveyance charges, Port entry fees etc. all complete as per drawings and specification as directed by Engineer-In-charge. Note:- The stiffener shall be measured under this item.In case the soil strata found to be not good in the founding level of the liner, extra depth may be provided as per site condition.

22.25

2091426

93996.7

... More
Boring through all types of soils, boulders, hard starta and rocks etc.. for 450mm Dia vertical bored piles from the existing ground level 0 mCD to the founding level(-)32.0m CD of the piles, including bailing, flushing the bore bentonite with required density, chiselling, shifting of materials etc.. complete as per directed by the Engineer-In-charge. Note:-i) In case the soil stratum at the founding level is loose the Engineer or his representative may direct the contractor to carryout additional length of boring and payment shall be made accordingly. ii) The sample of bored materials of regular interval shall be collected and produced for the verification of the Engineer or his representative at no extra cost . in case any test reqiured by engineer in-charge, bored the samples so collected shall be referred to an authorized laboratory / agency identified by the Engineer , cost for testing shall be included in the quoted rate. engineer in-charge decision regarding founding level is final.`no claims in this regards are entertained. iii) Boring through all type of soil strata means soft soil, weathered rock, cemented sand, boulders and hard rock etc., iv) The boring in all type of soil measurement will be made on the basis of depth of boring from encountered soft soil level to founding/pile termination level. v) All the boring depths shall be jointly measured actually at site and Engineer in-charge decision is final.

292.4

1315800

4500

... More
Chiseling/Breaking using suitable tools and equipments the top of pile concrete up to the receipt of dense concrete and dressing the pile head suitably so as to receive the form work for deck work , including breaking to the required level exposing the pile reinforcement to sufficient length as per approved drawing for embedding into the coping beam etc. including removal of concrete debris from the site, supply of all labour, material, transportation cost, hire and running charges of all machineries complete for 450 mm dia piles as directed by the Engineer-In-Charge.

8

15799

1974.9

... More
Providing and laying reinforced cement concrete in concrete mix M40 for pile excluding cost of steel reinforcements in position as per approved drawing and as directed by the Engineer-In-Charge including mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge.

46.48

399755

8600.6

... More
Providing and laying reinforced cement concrete in concrete mix M40 for Precast Pile muff excluding cost of steel reinforcements in position as per approved drawing and as directed by the Engineer-In-Charge including shuttering, mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge.

1.8

28452

15806.9

... More
Earthwork excavation for foundation in all soils and sub soils and to the full depth as may be directed except hard rock requiring blasting inclusive of shoring , strutting and water where ever bailing out including necessary refilling the sides of foundation with excavated earth than and deposited the surplus earth as directed by department officer with all heads & lifts etc., completed as per standard specifications.

45.96

9504

206.8

... More
Filling in foudation and plinth with filling sand from approved quarry with all leads, lifts and delifts including cost, conveyance, royality, taxes, Labour & labour cess, well watering etc. complete as per specification and direction of the Engineer in charge.

29.39

51843

1764

... More
P.C.C of (1:3:6 ) with 4 cm down H.G.C.B metal includig hoisting, laying, compacting, curing and watering, with cost, conveyance, royality, taxes, Labour, labour cess and T&P etc. required to complete the work including cost con veyance royality and all other taxes of materials compelte in all respect as per Engineer in charge.

7.35

50326

6847.2

... More
Providing and laying reinforced cement concrete in concrete mix M35 for Column excluding cost of steel reinforcements in position as per approved drawing and as directed by the Engineer-In-Charge including shuttering, mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge.

10.44

177365

16989

... More
Providing and laying reinforced cement concrete in concrete mix M35 for Beams excluding cost of steel reinforcements in position as per approved drawing and as directed by the Engineer-In-Charge including shuttering, mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge.

23.67

343719

14521.3

... More
Providing and laying reinforced cement concrete in concrete mix M35 for Insitu Slab excluding cost of steel reinforcements in position as per approved drawing and as directed by the Engineer-In-Charge including shuttering, mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge.

37.64

402601

10696.1

... More
Brick work with fly ash Bricks 23cmx11cmx8cm having crushing strength not less than 75 kg/m2 with dimensional tolerence +2 percent in cement mortar (1:6) in superstructure. with all leads, lifts and delifts including cost, conveyance, royality, taxes, Labour & labour cess, well watering etc. complete as per specification and direction of the Engineer in charge.

39.92

235480

5898.8

... More
16mm thick cement plaster (1:6) with standard water proofing compound including cost and conveyance of all materials with all taxes, royalty, labour, labour cess,and T&P required for the work etc. complete as directed by the Engineer-in-Charge.

342.55

93379

272.6

... More
Supplying,fitting &fixing Vitrified tiles(600mmx600mm) in floors, treads or steps and landing on 25mm thick bed of cement mortar (1:1) (1 cement, 1 sand) jointed with neat cement slurry mixed with pigment to match the shade of the tiles including cost, conveyance, all taxes etc. complete as directed by the Engineer-in-Charge.

73.48

108338

1474.4

... More
Finishing walls with Weather coat (ISI) of approved shade in new work two coats to give an even shade including cost of paint, materials, taxes , labour, labour cess, and T&P etc. required to complete the work in all respect as directed by the Engineer-in-Charge.

74.7

6416

85.9

... More
Priming one coat with any approved primer including cost of primer, materials, taxes , labour, labour cess, and T&P etc. required to complete the work in all respect as directed by the Engineer-in-Charge. (For wood work )

6.39

419

65.7

... More
Supplying, fitting, fixing Dressed seasonal Sal wood work framed and fixed (W&P) in trusses, purlines, frames of door and windows and beams per one cum as directed by the Engineer-in-Charge.

0.07

5595

79941.7

... More
Supplying,fitting,fixing of 32mm piasal wood or local Teak wood panelled shutters moulded panels with all labour, iron fittings, and wooden hinged cleats etc fitted fixed complete in all respect as directed by the Engineer-in-Charge.

3.2

13878

4337.1

... More
Supplying,fitting,fixing of window(sliding type)made up aluminium section 9778 as windows frame,section No,4095,4096 and 9777,39994 as shutter frame with 5mm thick glass as pannel fitted with rubber beading including locking arrangement including all fittings,including cost of materials all taxes,labour,T & P including cost of glass etc.complete as per direction of Engineer-in-charge

21.6

91342

4228.8

... More
Supplying, fitting & fixing of M.S. Grill for doors ,Windows & Ventilators of approved design including cost,conveyance, fabrication charges,labour,T&P required as directed by the Engineer-in-Charge.

5.07

53475

10547.5

... More
Painting two coats with approved paints on new iron work including cost of paint, materials, taxes , labour, labour cess, and T&P etc. required to complete the work in all respect as directed by the Engineer-in-Charge.

49.5

7652

154.6

... More
Finishing surface of walls with cement based wall putty ( Water Based ) of approved make including cost of paint, materials, taxes , labour, labour cess, and T&P etc. required to complete the work in all respect as directed by the Engineer-in-Charge.

247.24

18790

76

... More
Priming one coat with approved Water bound cement primer including cost of primer, materials, taxes , labour, labour cess, and T&P etc. required to complete the work in all respect as directed by the Engineer-in-Charge.

516.81

35608

68.9

... More
Painting 2 coats to walls with Plastic emulsion paint of approved shade on new work to give an even shade including cost of paint, materials, taxes , labour, labour cess, and T&P etc. required to complete the work in all respect as directed by the Engineer-in-Charge.

516.81

48735

94.3

... More
Fabricating and placing in position of steel reinforcement TMT bars(Fe 500D)confirming to IS 1786 specifications of SAIL/RINL/TISCON for all reinforced cement concrete pile including lifting hook, cutting, bending, tying with 16 gauge G.I. binding wire and welding to proper specifications wherever required including cost of steel and binding wire, cover blocks of 100mm dia in CC M40 mix, supply of with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees, etc. all complete as directed by the Engineer-In-Charge.

8.55

821031

96027.1

... More
Supply of Fe500D steel confirming to IS specification of SAIL/ RINL/ TISCON/ Electro steel brands for precast pile muff including cutting, straightening, bending , binding & plaving the grills in position for RCC works including cost of binding wire of 16 to 18 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees, etc. all complete as directed by the Engineer-In-Charge.

0.21

19554

93116.8

... More
Supply of Fe500D steel confirming to IS specification of SAIL/ RINL/ TISCON/ Electro steel brands for Plinth Beams including cutting, straightening, bending , binding & plaving the grills in position for RCC works including cost of binding wire of 16 to 18 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees, etc. all complete as directed by the Engineer-In-Charge.

1.62

150849

93116.8

... More
Supply of Fe500D steel confirming to IS specification of SAIL/ RINL/ TISCON/ Electro steel brands for Lintel Beams including cutting, straightening, bending , binding & plaving the grills in position for RCC works including cost of binding wire of 16 to 18 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees, etc. all complete as directed by the Engineer-In-Charge.

0.63

58663

93116.8

... More
Supply of Fe500D steel confirming to IS specification of SAIL/ RINL/ TISCON/ Electro steel brands for Roof beam including cutting, straightening, bending , binding & plaving the grills in position for RCC works including cost of binding wire of 16 to 18 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees, etc. all complete as directed by the Engineer-In-Charge.

1.6

148986

93116.8

... More
Supply of Fe500D steel confirming to IS specification of SAIL/ RINL/ TISCON/ Electro steel brands for Tank beams including cutting, straightening, bending , binding & plaving the grills in position for RCC works including cost of binding wire of 16 to 18 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees, etc. all complete as directed by the Engineer-In-Charge.

0.79

73562

93116.8

... More
Supply of Fe500D steel confirming to IS specification of SAIL/ RINL/ TISCON/ Electro steel brands for column including cutting, straightening, bending , binding & plaving the grills in position for RCC works including cost of binding wire of 16 to 18 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees, etc. all complete as directed by the Engineer-In-Charge.

1.17

108946

93116.8

... More
Supply of Fe500D steel confirming to IS specification of SAIL/ RINL/ TISCON/ Electro steel brands for Slab including cutting, straightening, bending , binding & plaving the grills in position for RCC works including cost of binding wire of 16 to 18 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees, etc. all complete as directed by the Engineer-In-Charge.

4.46

415300

93116.8

... More
TALACHUA-ELECTRIFICATION-Recessed wiring to Tube light point/Fan point/exhaust fan point/ call bell point with 1.5 sq.mm FR PVC insulated single core multistrand copper conductor of ISI marked with 20mm dia non-metalic PVC flexible conduit with 5A,250V Modular type switch (Make Cona/Anchor/ Havels ) & ceiling rose (Make Cona/Anchor/ Havels ) mounted on MS Box having front bakelite cover of suitable size with 1.0 Sq.mm FR PVC insulated single core multistrand copper conductor as earth wire including all accessories and connections as per the direction of Engineer-in-charge. (Make of wire Finolex/ L&T/Anchor/ Havels/ V Guard). (Excluding the cost of supplying and fixing of 100mmx100mmx60mm MS Box with backlight cover -1no for Modular Switch)

22

15749

715.9

... More
Supplying & fixing of Modular GI box for 2-modules, 18 SWG (Nominal size) on surface/ recess with suitable size of Modular Base & Cover in front including cutting the wall & making good the same in case of recessed conduit as required including all accessories and connections as per the direction of Engineer-in-charge.

22

4923

223.8

... More
Supplying & fixing of Modular GI box for 8-modules, 18 SWG (Nominal size) on surface/ recess with suitable size of Modular Base & Cover in front including cutting the wall & making good the same in case of recessed conduit as required including all accessories and connections as per the direction of Engineer-in-charge.

6

2335

389.2

... More
Supplying & fixing of 5 pin 5/6 amp Modular Type Switch and 5/6 amp Modular Type socket outlet on the existing switch box/ cover including connections etc. required as per the direction of Engineer-in-charge.

6

1376

229.4

... More
Installation,Testing and Commissioning of Stepped type ceiling fan regulator, in existing switch box including connection with 1.5 sq.mm FR PVC insulated single core multistrand copper conductor, earthing the regulator as required.

6

2005

334.2

... More
Supplying and drawing 1x1.5 sq.mm FR PVC insulated single core multistrand copper conductor of ISI marked confirming to IS 694/1990 in existing surface/recessed PVC conduit as required including all accessories and connections as per the direction of Engineer-in-charge. (Make of wire Finolex/ L&T/Anchor/ Havels/ V Guard).

60

2964

49.4

... More
Recessed wiring to sub-main in 2x2.5 sq.mm FR PVC insulated single core multistrand copper conductor of ISI marked confirming to IS 694/1990 in 20mm dia non-metalic heavy duty flexible conduit 1.6mm thick alongwith 1 x 1.5 Sq.mm FR PVC insulated single core multistrand copper conductor as earth wire etc. as required including all accessories and connections as per the direction of Engineer-in-charge. (Make of wire Finolex/ L&T/Anchor/ Havels/ V Guard).

60

8910

148.5

... More
Recessed wiring to sub-main in 2x1.5 sq.mm FR PVC insulated single core multistrand copper conductor of ISI marked confirming to IS 694/1990 in 20mm dia non-metalic heavy duty flexible conduit 1.6mm thick alongwith 1 x 1.5 Sq.mm FR PVC insulated single core multistrand copper conductor as earth wire etc. as required including all accessories and connections as per the direction of Engineer-in-charge. (Make of wire Finolex/ L&T/Anchor/ Havels/ V Guard).

20

2690

134.5

... More
Supplying & fixing of 5amp to 32amp rating 240V "B" series miniature circuit breaker suitable for lighting & other loads of the Single poles in the existing MCB DB ISI marked complete with connections testing and commissioning etc. as per the direction of Engineer-in-charge.

6

807

134.5

... More
Supplying & fixing of Modular Blanking Plate of ISI Marked on the existing Modular switch board including connections etc. required as per the direction of Engineer-in-charge.

2

100

50.4

... More
Supplying Fitting & Fixing, Installation, testing and Commissioning of Ceiling fan including wiring the down rods of standard length (upto 30 cm) with 1.5sq.mm FR PVC insulated single core multistrand copper conductor etc. Required as per the direction of Engineer-in-charge(.Celing Fan Havels Fusion 1200mm make 3 blade )

6

19937

3322.9

... More
Supplying Fitting & fixing of Tube light of ISI Marked on the existing Modular switch board and celing rose including connections etc. required as per the direction of Engineer-in-charge.(Havels make 20wt LED 6500K)

16

11193

699.6

... More
Supply, Installation, Testing, and Commissioning of 63 Amp DP Main switches of following capacity (IS 13940 Part 3/1993 ) on existing surface / wall mountnting and complete with HRC Fuse links, interconnections, earthing, etc. as required as per direction of Engineer in Charge.Make-SEIMENS/HPL/ ANCHOR/ L&T/HAVELS/C & S/ RK

1

2098

2098.8

... More
Supplying & fixing of 2 WAY , SPN, Single Door MCB-DB with sheet steel enclosure, distribution board, on surface/ recess complete with tinned copper bus bar, neutral box bar, earth bar, din bar, detachable gland plate , inter connection , phospate & powder painted including earthing etc. as required (but without MCB/RCCB/Isolator) including all accessories and connections as per the direction of Engineer-in-charge.

1

495

495.6

... More
Supplying & fitting , fixing of LED Street light 50wt Havells make in all respect as per direction of Engineer-in-charge.

1

2622

2622.9

... More
Earthing with GI earth pipe 3m long 40mm dia ISI marked including all accessories and providing masonary enclouser with cover plate having locking arrangement and watering pipe etc. with charcoal & salt as required as per the direction of Engineer-in-charge.

1

2547

2547.5

... More
Providing and fixing 8 SWG (4 mm) dia copper wire on surface or in recess for loop earthing from earth electrode to PANNEL BOARD directlyas directed by the Engineer in Charge.

10

977

97.7

... More
TALACHUA-SEPTIC TANK-Earth work in excavation of foundation in Ordinary soil within 50m initial lead &1.5 M initial lift including rough dressing and leveling the bed and depositing the excavated materials away from the working areas as directed by the Engineer-in-Charge.

12.27

2537

206.8

... More
Earth work in excavation of foundation in Ordinary soil within 50m initial lead &1.5 M initial lift below 1.5 mtr lift including rough dressing and leveling the bed and depositing the excavated materials away from the working areas as directed by the Engineer-in-Charge.

1.53

341

223.2

... More
Cement Concrete (1:3:6) with 40 mm. size black hard granite crusher broken stone chips including cost and conveyance of all materials with all taxes, royalty, labour and T&P required for the work etc. complete as directed by the Engineer-in-Charge.

1.41

9654

6847.2

... More
Brick work with 1st class K.B.bricks (25cm x12cmx8cm) size having C/S not less than 75Kg/cum in C.M.(1:4) in foundation and plinth including cost and conveyance of all materials with all taxes, royalty, labour, labour cess,and T&P required for the work etc. complete as directed by the Engineer-in-Charge.

4.9

28904

5898.8

... More
16mm thick cement plaster (1:6) with standard water proofing compound including punning with cost and conveyance of all materials with all taxes, royalty, labour, labour cess,and T&P required for the work etc. complete as directed by the Engineer-in-Charge.(Inside)

11.32

3085

272.6

... More
16mm thick cement plaster (1:6) with standard water proofing compound including cost and conveyance of all materials with all taxes, royalty, labour, labour cess,and T&P required for the work etc. complete as directed by the Engineer-in-Charge. (Outside)

5.57

1518

272.6

... More
2.5 cm thick AS flooring with C.C. (1:2:4) including punning using 12mm size HGCB chips including cost and conveyance of all materials with all taxes, royalty, labour, labour cess,and T&P required for the work etc. complete as directed by the Engineer-in-Charge.

2

782

391.1

... More
Filling foundation & Plinth with KB Brick Khoa 20cm thick including cost and conveyance of all materials with all taxes, royalty, labour, labour cess,and T&P required for the work etc. complete as directed by the Engineer-in-Charge.

6.96

5246

753.8

... More
Filling in foudation and plinth with filling sand from approved quarry with all leads, lifts and delifts including cost, conveyance, royality, taxes, Labour & labour cess, well watering etc. complete as per specification and direction of the Engineer in charge.

1.19

2099

1764

... More
M.S. Reinfocement for R.C.C. Work Including cutting, bending, binding & tying the grills including all cost, conveyance,taxes of M.S. Reinfocement and binding wire 18 to 20 guage etc.complete in all respect as directed by the Engineer-in-Charge.

0.39

3631

9311.7

... More
Rigid smooth centering and shuttering for R.C.C. works including false works and dismentalling then after casting including cost of materials complete in ground floor.(R.C.C. Floor and Roof Slab, landing balconies projecting sub-shades and chajja upto 4.3 mtr. height.)

7.91

5315

672

... More
Providing fitting & fixing of iron foot step of 16mm. Dia bar including all cost as directed by the Engineer-in-Charge.

4

480

120

... More
TALACHUA-PH -Earth work in excavation of foundation inhard soil within 50m initial lead &1.5 M initial lift including rough dressing and leveling the bed and depositing the excavated materials away from the working areas asdirected by the Engineer-in-Charge.

8.06

1666

206.8

... More
Filling in foudation and plinth with filling sand from approved quarry with all leads, lifts and delifts including cost, conveyance, royality, taxes, Labour & labour cess, well watering etc. complete as per specification and direction of the Engineer in charge.

1.63

2875

1764

... More
P.C.C of (1:3:6 ) with 40 cm down H.G.C.B metal includig hoisting, laying, compacting, curing and wateringetc. with all t&P required for the work including cost con veyance royality and all other taxes of materials compelte in all respect as per Engineer in charge.

0.6

4108

6847.2

... More
Cement concrete (1:2:4) using 12 mm size hard granite chips of approved quarry including curing,cost, conveyance, royality, taxes, Labour & labour cess, well watering etc. complete as per specification and direction of the Engineer in charge.

0.79

6632

8395.5

... More
Brick works with fly ash bricks 23 cm x 11 cm x 8 cm size having crushing strength not less than75 Kg/ cm2 with dimensional tolerance + or -2% in cement mortar (1:6) in foundation including cost conveyance,royality and all other taxes of materials etc. with curing complete in all respect as per specification and directon of Engineer in Charge.

0.13

766

5898.8

... More
12 mm thick cement plaster in cement mortor (1:4) over brick Masonary including punning with cost and conveyance of all materials with all the taxes, royality, labour, T & P required for the work etc. complete as directed by the Engineer-in-charge.

0.81

157

194

... More
SupplyM.S.rainforcement for R.C.C.work including cutting, bending, binding and straighteing with cost conveyance, labour, T&P, all taxes of M.S.rod including cost of binding wire 18 to 20 gauge.

-

93

93116.8

... More
Supplying all materials,labour and T&P for cutting grouves in Pucca Floors & walls for taking GI/ PVC Pipes and making good the damages as per specification including cost of all materials, labour & labour cess etc complete as per direction of Engineer-in-Charge.

30

6807

226.9

... More
Supplying all materials,labour and T&P for cutting holes through existing brick work including making good the same in cement mortar (1:4) for taking G.I. pipes and fittings /P.V.C. pipes and fittings all complete as per specification including cost of all materials, labour & labour cess etc complete as per direction of Engineer-in-Charge.

4

215

53.9

... More
Supplying & fixing on wall surface Following dia Chlorinated Polyvinyl Chloride (CPVC) pipes conforming to IS:15778, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings including Supplying & fixing the pipe with clamps at 1.00 m spacing & jointing of pipes & fittings with one step CPVC solvent cement including making good the wall & Floor and testing of joints complete as per direction of Engineer-in-Charge. (Supply pipe 32mm dia)

45

24903

553.4

... More
Supplying & fixing on wall surface Following dia Chlorinated Polyvinyl Chloride (CPVC) pipes conforming to IS:15778, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings including Supplying & fixing the pipe with clamps at 1.00 m spacing & jointing of pipes & fittings with one step CPVC solvent cement including making good the wall & Floor and testing of joints complete as per direction of Engineer-in-Charge. (Delivery pipe 25mm dia)

20

7588

379.4

... More
Supplying & fixing on wall surface Following dia Chlorinated Polyvinyl Chloride (CPVC) pipes conforming to IS:15778, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings including Supplying & fixing the pipe with clamps at 1.00 m spacing & jointing of pipes & fittings with one step CPVC solvent cement including making good the wall & Floor and testing of joints complete as per direction of Engineer-in-Charge. (Internal wiring pipe 20mm dia CPVC pipe)

30

8328

277.6

... More
Providing and fixing on wall face unplasticised Rigid UPVC Soil, Waste and Rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS: 5382, leaving10 mm gap for thermal expansion including testing as per specification including cost of all materials, labour & labour cess etc complete as per direction of Engineer-in-Charge. (90mm. dia UPVC Single Socket Pipe) (Waste water line)

20

7286

364.3

... More
Supplying & Laying in trenches unplasticised UPVC pipes conforming to IS:4985-2000 and specials of the following outside diameter for all classes including jointing with supply of approved solvent cement by non-heat application method including testing as per specification complete including cost of all materials, labour & labourcess etc complete as per direction of Engineer-in-Charge. (Earth work in trenches to be measured and paid for separately)(110mm. dia UPVC Single Socket Pipe) (Soil Line)

20

10990

549.5

... More
Providing and fixing on wall face unplasticised PVC moulded fittings / accessories for unplasticised Rigid PVC Waste & Rain water pipes conforming to IS: 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion including testing as per specification including cost of all materials, labour & labour cess etc complete as per direction of Engineer-in-Charge. (110mm. Dia PVC Plain Bend)

5

1255

251.1

... More
Providing and fixing on wall face unplasticised PVC moulded fittings / accessories for unplasticised Rigid PVC Waste & Rain water pipes conforming to IS: 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion including testing as per specification including cost of all materials, labour & labour cess etc complete as per direction of Engineer-in-Charge. (110mm. Dia PVC Cowel)

3

254

84.9

... More
Providing and fixing on wall face unplasticised PVC moulded fittings / accessories for unplasticised Rigid PVC Waste & Rain water pipes conforming to IS: 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion including testing as per specification including cost of all materials, labour & labour cess etc complete as per direction of Engineer-in-Charge. (110mm. Dia PVC Coupler)

1

173

173.2

... More
Providing and fixing on wall face unplasticised PVC moulded fittings / accessories for unplasticised Rigid PVC Waste & Rain water pipes conforming to IS: 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion including testing as per specification including cost of all materials, labour & labour cess etc complete as per direction of Engineer-in-Charge. (75mm dia plain bend)

2

229

114.6

... More
Providing and fixing on wall face unplasticised PVC moulded fittings / accessories for unplasticised Rigid PVC Waste & Rain water pipes conforming to IS: 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion including testing as per specification including cost of all materials, labour & labour cess etc complete as per direction of Engineer-in-Charge. (75mm dia door bend)

2

288

144

... More
Providing and fixing on wall face unplasticised PVC moulded fittings / accessories for unplasticised Rigid PVC Waste & Rain water pipes conforming to IS: 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion including testing as per specification including cost of all materials, labour & labour cess etc complete as per direction of Engineer-in-Charge. (75mm dia door Tee)

2

352

176

... More
Providing and fixing on wall face unplasticised PVC moulded fittings / accessories for unplasticised Rigid PVC Waste & Rain water pipes conforming to IS: 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion including testing as per specification including cost of all materials, labour & labour cess etc complete as per direction of Engineer-in-Charge. (75mm dia Cowel)

2

128

64.2

... More
Supplying all materials,labour and T &P for fixing of different size PVC Nahani Trap of following size of self cleaning design with stainless steel grating or without vent arm including cutting holes in walls and making good to the damages etc. all complete as per specification including cost of all materials, labour & labourcess etc complete as per direction of Engineer-in-Charge. (Nahani trap (110mm x75mm) with grating)

2

1378

689.4

... More
Supplying & fixing of bath/toilet fittings of the following size & specification including cost of fittings etc complete in all respect.(15mm dia Pillar Cock)

2

4887

2443.6

... More
Supplying & fixing of bath/toilet fittings of the following size & specification including cost of fittings etc complete in all respect.(15mm dia Short body bib cock )

2

2426

1213.2

... More
Supplying & fixing of bath/toilet fittings of the following size & specification including cost of fittings etc complete in all respect.(15mm dia Long body bib cock )

2

3214

1607

... More
Supplying & fixing of bath/toilet fittings of the following size & specification including cost of fittings etc complete in all respect.(15mm dia Angle stop cock )

4

4131

1032.9

... More
Supplying & fixing of bath/toilet fittings of the following size & specification including cost of fittings etc complete in all respect.(15mm dia Concealed stop cock )

2

1376

688.4

... More
Supplying all labour and T &P for fixing UPVC Ball Valve (32mm dia) of the following size as per specification including cost of all materials, labour & labourcess etc complete as per direction of Engineer-in-Charg.

4

3576

894.2

... More
Supplying all labour and T &P for fixing CPVC Union (32mm dia) of following sizes as per specification including cost of all materials, labour & labourcess etc complete as per direction of Engineer-in-Charge.

4

1805

451.4

... More
Supplying & fixing Single Piece Water Closet (European type W.C pan) with integral 'P' trap conforming to IS 2556 : Part 8-2004, to the floor with wooden plug and chromium plated screws including jointing the trap with soil pipe in cement mortar (1: 1) etc with Supplying & fixing plastic seat and cover for wash down water closet with chromium plated brass hinges and rubber buffers all complete as per specification. (Make-Jaquar, Model- CNS-WHT-851P-P TRAP)

2

31625

15812.6

... More
Supplying & fixing 15mm dia PVC inlet connection pipe and making connection with pillar cocks and supply mains for wash basin complete as per specification and direction of Engineer-in-Charge.

24

7596

316.5

... More
Supplying & Fixing flexible (Coil shaped) PVC waste pipe for wash basin or sink 32 mm dia with length 1150 mm with PVC waste fittings including cost of all materials, labour & labourcess etc. complete as per specification & direction of the Engineer-in-Charge.

2

250

125

... More
Supplying all materials,labour and T &P for fixing Steel Towel Rail fixed to wooden plugs with chromium plated brass screws and washers including cost of all materials, labour & labourcess . all complete as per specification and direction of Engineer-in-Charge. (Towel Rail 600 mm long (Make-Jaquar, Model-ACN-1111SM)

2

3223

1611.5

... More
Supplying all materials,labour and T&P for fixing of CP brass Over head Shower of 120mm diameter and 15mm inlet including polishing, cost of all materials, labour & labourcess etc. complete as per specification and direction of Engineer-in-Charge.

2

4661

2330.6

... More
Fixing 630mm x 445mm Swivel mirror of superior glass mounted on 6mm thick A.C sheet or plywood sheet and fixed to wooden plugs with chromium plated brass screws and washers complete as per specification and direction of Engineer-in-Charge.

2

8080

4040.4

... More
Fixing Wall hung wash basin 590x490x185 mm with half pedestal conforming to IS 2556 : Part 4-2004 with Cast Iron or M S brackets painted white including cutting holes in walls and making good the damages etc all complete as per specification and direction of Engineer-in-Charge.

2

13834

6917.3

... More
Supplying all materials,labour and T&P for fixing of CP brass soap dish holder fixed to wooden plugs with chromium plated brass screws and washers etc. all complete including cost of all materials, labour & labourcess complete as per specification and direction of Engineer-in-Charge.

4

4769

1192.3

... More
TALACHUA-LAND RECLAMATION:-Formation of core with quarry stones (rough angular) weighing 1 kg to 50 kg, loading at quarry, conveying in contractors transporting by tippers / lorries including weighing in the electronic weigh bridge for the purpose of measurment, Unloading/dumping placing in position to required level, profile using crane and devices as per the drawings and specification etc., as directed by the Department Officers. ( The payment shall be made on weight basis (ie) laden weight minus unladden weight). The contractor has to make his own arrangements for weigh bridge in the presence of Department Officers.

10724.56

25016108

2332.6

... More
Formation of armour layer with quarry stones (rough angular) weighing 1 T to 3 T, loading at quarry, conveying in contractors transporting by tippers / lorries including weighing in the electronic weigh bridge for the purpose of measurment, Unloading/dumping placing in position to required level, profile using crane and devices as per the drawings and specification etc., as directed by the Department Officers. ( The payment shall be made on weight basis (ie) laden weight minus unladden weight). The contractor has to make his own arrangements for weigh bridge in the presence of Department Officers.

2682

6256033

2332.6

... More
Formation of Toe armour layer with quarry stones (rough angular) weighing 0.5 T to 1 T, loading at quarry, conveying in contractors transporting by tippers / lorries including weighing in the electronic weigh bridge for the purpose of measurment, Unloading/dumping placing in position to required level, profile using crane and devices as per the drawings and specification etc., as directed by the Department Officers. ( The payment shall be made on weight basis (ie) laden weight minus unladden weight). The contractor has to make his own arrangements for weigh bridge in the presence of Department Officers.

2783.6

6493025

2332.6

... More
Earthwork excavation by mechanical means in all soils and sub soils and to the full depth as may be directed except hard rock requiring blasting inclusive of shoring , strutting and water where ever bailing out including necessary refilling the sides of foundation with excavated earth than and deposited the surplus earth as directed by department officer with all heads & lifts etc., completed as per standard specifications.

5660.3

430748

76.1

... More
TALACHUA-PARKING AREA DEVELOPMENT-Filling in foudation and plinth with filling sand from approved quarry with all leads, lifts and delifts including cost, conveyance, royality, taxes, Labour & labour cess, well watering etc. complete as per specification and direction of the Engineer in charge.

15

26460

1764

... More
Quarrying, collecting and supplying good moorum from approved quarry with all leads, lifts and delifts including cost, conveyance, royality taxes of all materials etc. complete and spreading the same in layers not exceeding 22.5cm and consolidation with PRR including watering etc. complete With all leads, lifts and delifts etc. complete as per specification and direction of the Engineer in charge.

45

94684

2104.1

... More
P.C.C of (1:3:6 ) 40 mm size chips includig hoisting, laying, compacting, curing and wateringetc. with all t&P required for the work including cost con veyance royality and all other taxes of materials compelte in all respect as per Engineer in charge.

30

205416

6847.2

... More
Supplying, fitting & fixing of Paver block of 60 mm size ( Jumbo coloured) including cost and conveyance of all materials with all taxes, royalty, labour and labour cess, T&P required for the work etc. complete as directed by the Engineer-in-Charge.

300

324120

1080.4

... More
Earthwork excavation for foundation in all soils and sub soils and to the full depth as may be directed except hard rock requiring blasting inclusive of shoring , strutting and water where ever bailing out including necessary refilling the sides of foundation with excavated earth than and deposited the surplus earth as directed by department officer with all heads & lifts etc., completed as per standard specifications as per specification and direction of Engineer-in-Charge.

83.2

17205

206.8

... More
Filling in foudation and plinth with filling sand from approved quarry with all leads, lifts and delifts including cost, conveyance, royality, taxes, Labour & labour cess, well watering etc. complete as per specification and direction of the Engineer in charge.

4.16

7338

1764

... More
Providing and laying reinforced cement concrete in concrete mix M25 for Strip footing excluding cost of steel reinforcements in position as per approved drawing and as directed by the Engineer-In-Charge including shuttering, mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge.

24.96

219747

8804

... More
Providing and laying reinforced cement concrete in concrete mix M25 for Column excluding cost of steel reinforcements in position as per approved drawing and as directed by the Engineer-In-Charge including shuttering, mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge.

0.65

10951

16849

... More
Providing and laying reinforced cement concrete in concrete mix M25 for Beams excluding cost of steel reinforcements in position as per approved drawing and as directed by the Engineer-In-Charge including shuttering, mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge.

2.11

22988

10895.2

... More
Supply of Fe500D steel confirming to IS specification of SAIL/ RINL/ TISCON/ Electro steel brands for Strip Footing including cutting, straightening, bending , binding & plaving the grills in position for RCC works including cost of binding wire of 16 to 18 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees,etc. all complete as directed by the Engineer-In-Charge.

4.99

464652

93116.8

... More
Supply of Fe500D steel confirming to IS specification of SAIL/ RINL/ TISCON/ Electro steel brands for Plinth Beams including cutting, straightening, bending , binding & plaving the grills in position for RCC works including cost of binding wire of 16 to 18 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees, etc. all complete as directed by the Engineer-In-Charge.

0.74

68906

93116.8

... More
Supply of Fe500D steel confirming to IS specification of SAIL/ RINL/ TISCON/ Electro steel brands for column including cutting, straightening, bending , binding & plaving the grills in position for RCC works including cost of binding wire of 16 to 18 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees, etc. all complete as directed by the Engineer-In-Charge.

0.73

67975

93116.8

... More
Brick work with 1st class K.B.bricks (25cm x12cmx8cm) size having C/S not less than 75Kg/cum in C.M.(1:4) in foundation and plinth including cost and conveyance of all materials with all taxes, royalty, labour, labour cess,and T&P required for the work etc. complete as directed by the Engineer-in-Charge.

10.93

64473

5898.8

... More
16mm thick cement plaster (1:6) with standard water proofing compound including cost and conveyance of all materials with all taxes, royalty, labour, labour cess,and T&P required for the work etc. complete as directed by the Engineer-in-Charge.

119.7

32630

272.6

... More
Priming one coat with approved Water bound cement primer including cost of Primer to make it finished smooth & even surface, materials, taxes , labour, labour cess, and T&P etc. required to complete the work in all respect as directed by the Engineer-in-Charge.

138.06

9512

68.9

... More
Finishing walls with Weather coat (ISI) of approved shade in new work two coats to give an even shade including cost of weather coat to make it finished smooth & even surface, materials, taxes , labour, labour cess, and T&P etc. required to complete the work in all respect as directed by the Engineer-in-Charge.

138.06

11859

85.9

... More
Supplying, fitting & fixing of Stainless steel gate of approved design including cost,conveyance, fabrication charges,labour,T&P required to complete the work in all respect as directed by the Engineer-in-Charge.

7

73832

10547.5

... More
TALACHUA-BOREWELL:- Labour for drilling a perfectly vertical bore hole of a specified dia for a specified depth(0-100 Mtr) below ground level in alluvial soil strata by mud Rotary Rig drilling as required to suit the site condition as per the direction of Engineer-in-charge including use of own rigs with its accessories, tools and plant and consumables etc. for lowering of finished bore suitable for lowering of 200mm dia GI/PVC pipes for housing, fitted with socket and with or without well screen as per the necessity for the soft, medium, hard and boulder formation (GI/PVC casing pipes if required by the contractor to prevent collapse of over burden portion) including lower and withdrawing of casing pipe after drilling 200mm to 450mm ia in over burden portion.

100

169200

1692

... More
Labour for drilling a perfectly vertical bore hole of a specified dia for a specified depth(101-200 Mtr) below ground level in alluvial soil strata by mud Rotary Rig drilling as required to suit the site condition as per the direction of Engineer-in-charge including use of own rigs with its accessories, tools and plant and consumables etc. for lowering of finished bore suitable for lowering of 200mm dia GI/PVC pipes for housing, fitted with socket and with or without well screen as per the necessity for the soft, medium, hard and boulder formation (GI/PVC casing pipes if required by the contractor to prevent collapse of over burden portion) including lower and withdrawing of casing pipe after drilling 200mm to 450mm ia in over burden portion.

100

204510

2045.1

... More
Labour for drilling a perfectly vertical bore hole of a specified dia for a specified depth(201-260 Mtr) below ground level in alluvial soil strata by mud Rotary Rig drilling as required to suit the site condition as per the direction of Engineer-in-charge including use of own rigs with its accessories, tools and plant and consumables etc. for lowering of finished bore suitable for lowering of 200mm dia GI/PVC pipes for housing, fitted with socket and with or without well screen as per the necessity for the soft, medium, hard and boulder formation (GI/PVC casing pipes if required by the contractor to prevent collapse of over burden portion) including lower and withdrawing of casing pipe after drilling 200mm to 450mm ia in over burden portion.

60

140094

2334.9

... More
Supply of all labour & T&P for Lowering the following size G.I/PVC Pipes with or without slotted pipes as per the necessity from ground level and fitted up in perfectly vertical position, including cutting and threading pipe and slotted pipe and fixing all jointing materials etc. complete and keeping the top of the casing pipe threaded including plugging tube wells to prevent entry of foreign from above excluding cost of fittings & jointing materials.

260

29328

112.8

... More
Cleaning and developing the production well using their own compressor continuously worked till clear and adequate discharge is obtained from the tube well including supply and use of all necessary equipment adn labour as per the direction of Engineer-in-Charge

1

29594

29594.2

... More
Supplying all labour, tools and plant and grouting with cement bentonite slurry for saline sealing in the bore around the 200mm dia P.V.C Casing pipe etc all complete as per the direction of the Engineer-in-charge. (Including the cost of Cement)

1

9817

9817.6

... More
Supplying all lbour, T&P and materials for packing the bore with washed gravel (size P-6) around the pipes in good quality including cost of gravel etc complete as per specification and direction of the Engineer-in-charge.

1

3300

3300.2

... More
Supplying all materials labour and T&P and grouting with cement slurry for sanitary sealing around the GI/PVC casing pipe up to 3 mts. Elow ground level including cost of cement all complete as per the direction of Engineer-in-charge

1

3273

3273.6

... More
Providing supplying fitting and fixing of 5 HP 3 Phase oilfiltered 100mm dia borewell submergable pump set of KSB/ kirlosker/ crompton/texmo and other IS make with control pannel including 2.5sqmm three core PVC coated copper flat cable, 32mm dia HDPE pipe / nipple / bolt and PVC coated 6mm wire rope , U bolt , M.S clamp with all labour, T&P, taxes as applicable at site as per specification and direction of engineer in charge.

1

43610

43610.4

... More
Supplying all labour T&P, materials for Fitting & fixing of 200mm Sh-80 pipe including cost, conveyance, taxes, Labour & labour cess, etc. complete as per specification and direction of the Engineer in charge. (200mm Sch-80 Pipe)

67

153463

2290.5

... More
Supplying all labour T&P, materials for Fitting & fixing of 150mm Sh-80 pipe including cost, conveyance, taxes, Labour & labour cess, etc. complete as per specification and direction of the Engineer in charge. (150mm Sch-80 Pipe)

190

286482

1507.8

... More
Supplying all labour T&P, materials for Fitting & fixing of 150mm Sh-80 pipe including cost, conveyance, taxes, Labour & labour cess, etc. complete as per specification and direction of the Engineer in charge.(150mm Sch-80 Pipe)

3

4523

1507.8

... More
Supplying all labour T&P, materials for Fitting & fixing of reduce socket including cost, conveyance, taxes, Labour & labour cess, etc. complete as per specification and direction of the Engineer in charge. (8" x 6" Reduce Socket)

2

5960

2980

... More
Supplying all labour T&P, materials for Fitting & fixing including cost, conveyance, taxes, Labour & labour cess, etc. complete as per specification and direction of the Engineer in charge.(8" x 12" S. P.)

1

3200

3200

... More
Supplying all labour T&P, materials for Fitting & fixing of 8"UPVC bend including cost, conveyance, taxes, Labour & labour cess, etc. complete as per specification and direction of the Engineer in charge.

15

7200

480

... More
Supplying all labour T&P, materials for Fitting & fixing of including cost, conveyance, taxes, Labour & labour cess, etc. complete as per specification and direction of the Engineer in charge. (Filter Fitting (30 Mtr))

30

14499

483.3

... More
Supplying all labour T&P, materials for Fitting & fixing of 200mm PVC cone including cost, conveyance, taxes, Labour & labour cess, etc. complete as per specification and direction of the Engineer in charge.(200mm PVC Cone)

1

2500

2500

... More
Supplying all labour T&P, materials for Fitting & fixing of pipe including cost, conveyance, taxes, Labour & labour cess, etc. complete as per specification and direction of the Engineer in charge. (75mm Sch-80 Pipe)

50

33750

675



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.