Directorate Of Ports And Inland Water Transport Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
₹ 1,88,000Document Cost
₹ 10,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PIWT_106513_1Bid Award Id
ViewTender No
DPIWT-07/2024-25Tender Authority
Directorate Of Ports And Inland Water Transport ViewPurchaser Address
-Website
http://http://ct.odisha.gov.in/content/1/7
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
R.C.C. M-30 with 20 mm. down graded black hard granite crushed broken stone chips of approved quality and from approved quarry including hoisting, lowering and laying concrete and compacting by using vibrators, watering and curing for 4 weeks and finishing the exposed surface smooth providing grooves or beads where necessary in all floors including cost, conveyance, royalities and taxes of all materials cost of all labour, labour cess, T&P etc. required for the work to complete in all respect as per direction of Engineer in Charge.
388.98
8251
3209668.47
... More
Supplying, fabricating and placing of HYSD (FE-415) /(FE-500) grade steel for pile cage including cutting , bending, binding & welding and laying in position with cost, conveyance, taxes of HYSD steel and binding wires 18 to 20 gauge with all labour,labour cess, T&P, cage lowering, equipments etc., complete in all respect as directed by the Engineer in charge.
(Brand of Steel - SAIL ) Measurement of reinforcement will be made on lengthwise including hooks, if any, separately for different diameter as actually used in work, excluding overlaps, from the length so measured, the weight of reinforcement shall be calcuted in tonnes by multiplying the coefficient per unit length of bar as per code of the respective size of bars used on the basis of wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods for binding & placing shall not be measured as the cost of these items has already been included in the analysis of rates for reinforcement as per rule in force .
43.44
94532
4106504.83
... More
Earth work in excavation in ordinary soil within 50m initial lead and 1.5m initial lift including rough dressing and levelling the bed and depositing the excavated materials away from the working areas including cost of all labour, Labour cess and T& P required to complete the work in all respect as per specification & direction of Engineer in charge.
207.44
201
41819.9
... More
Filling in foudation and plinth with sand from approved quarry with all leads, lifts and delifts including cost, conveyance, royality taxes etc. complete With all leads, lifts and delifts etc. complete as per specification and direction of the Engineer in charge.
118.9
1692
201178.8
... More
Providing and laying Plain Cement concrete of proportion (1:3:6) in foundation and floors using 4cm down HGCB metal including hoisting, laying, compacting, curing and watering etc. with cost, conveyance, royalty, labour, labour cess, T&P and all taxes of materials required to complete the work in all respect as per specification and direction of Engineer in Charge.
194.48
7669
1491506.02
... More
Filling sand and moorum admixture(30:70) by admixing sand and moorum and consolidating with PRR including watering, cost and conveyance of all materials with all the taxes, royality, labour, T & P required for the work etc. complete as directed by the Engineer-in-charge.
762.04
3033
2311648.34
... More
Collecting, conveying and supplying good quality laterite moorum from approved quarry and laying Sub-base in layers not exceeding 100mm, watering & compaction to required density in OMC with PRR complete with all leads, lifts and delifts including cost, conveyance, royality taxes of all materials etc. complete as per specification and direction of the Engineer in charge.
283.33
3212
910282.62
... More
Cement concrete(1:2:4) with12mm size broken hard granite chips for R C C works including hoisting and laying With all leads, lifts and delifts etc. complete as per specification and direction of the Engineer in charge
264.36
10024
2650129.69
... More
Rigid smooth centering and shuttering for R.C.C. works including false works and dismentalling then after casting including cost, conveyance, royality, labour, Labour Cess, T&P and all other taxes etc. required to complete the work in all respect as per specification and direction of the Engineer in charge. (R.C.C. Foundation, plinth band and footing base of column mass concrete precast slab etc.)
824.8
247
204138
... More
Rigid smooth centering and shuttering for R.C.C. works including false works and dismentalling then after casting including cost, conveyance, royality, labour, Labour Cess, T&P and all other taxes etc. required to complete the work in all respect as per specification and direction of the Engineer in charge.( R.C.C. Walls and Fins including attached pillasters)
1545.48
1061
1640217.92
... More
Rigid smooth centering and shuttering for R.C.C. works including false works and dismentalling then after casting including cost, conveyance, royality, labour, Labour Cess, T&P and all other taxes etc. required to complete the work in all respect as per specification and direction of the Engineer in charge. (R.C.C. Floor and Roof Slab, landing balconies projecting sun-shades and chajja upto 4.3 mtr. height.)
291.4
755
220007
... More
Filling Bituminous expansion joint board in every expansion joint in C.C. road inclusive of cost of materials & cleaning upto specific depth as required for the work to complete in all respect as directed by the Engineer-in-Charge.
587.52
151
89009.28
... More
Supplying ,Laying & Fixing 600mm dia NP3 RCC hume pipe in position for culvert including pointing ends , suitable for flush joint with cement mortar (1:3) including cost conveyance and taxes of hume pipe etc complete.
15
3285
49285.5
... More
Construction of coffer dam including all materials, labours, taxes etc complete as per direction of Engineer in charge.
10
10948
109481
... More
12 mm thick cement plaster in cement mortor (1:3) over brick masonary including cost and conveyance of all materials with all the taxes, royality, labour, T & P required for the work etc. complete as directed by the Engineer-in-charge.
28.91
228
6611.72
... More
Priming one coat with approved Water bound cement primer including cost of Primer and cost and conveyance of all materials with all the taxes, royality, labour, T & P required for the work etc. complete as directed by the Engineer-in-charge.
28.91
82
2370.62
... More
Painting 2 coats to walls with Plastic emulsion paint of approved shade on new work to give an even shade including cost of all materials and labour etc complete in all respect as per direction of Engineer in charge
28.91
107
3113.61
Evaluation Notes How It Works ?