Centre For Modernizing Government Initiative Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Centre For Modernizing Government Initiative - CMGI Tender

Consultancy Services
Eprocure
Opening Date20 Apr 2018
Closing Date28 Apr 2018
Tender Amount₹ 20,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earth work excavation in foundation in all kinds of soil with all lead & lift including dressing the sides & levelling the bed of the foundation as directed by the Engineer-in-charges complete as per specification & direction of the E-I-C. below bed level.

12.15

1681

138.4

... More
Supplying all materials, labour, T&P and providing Cement Concrete (1:4:8) in foundation and plinth with 4cm. H.G.Stone metal with cost, conveyance, royalty, taxes of all materials required for the work as per specification & direction of the Engineer-in-charge.

2.03

6820

3359.8

... More
Supplying all materials, labour, T&P and providing R.R. H.G.Stone masonary with C.M.(1:6) in foundation and plinth with granite stone including cost, conveyance, labour, tax, royalty of materials to worksite complete as directed by the Engineer-in-charge.

10.8

27717

2566.4

... More
Supplying, filling in foundation & plinth with sand in 15cms. (9") thick layers with the cost conveyance royalties, taxes of the materials complete as per specification and direction of the Engineer-in-charge

4.73

1530

323.5

... More
Supplying all materials, labour, T&P and providing C.C. (1:2:4) work using 12mm size hard black broken granite stone chips including cost, conveyance, royalty & taxes etc, complete in all respect but excluding cost of M.S. Rods or Tor Steel and binding wires as per specification and direction of the Engineer-in-charge.

0.35

1651

4717.7

... More
Supplying all materials, labour, T&P and providing Brick work with C.B Bricks in c.m (1:6) in superstructure using well burnt C.B bricks of size 23cm x 11cm x 8cm including cost, conveyance, royalty of all materials as per specification and direction of the Engineer-in-charge.

9.39

29978

3192.6

... More
Supplying all materials, labour T&P providing R.C.C. (1:2:4) work using 12mm size hard black hand broken granite stone chips including cost conveyance taxes and royalty of all materials and labour with T&P required for the work etc, complete in all respect but excluding cost of MS Rods or Tor Steel and binding wires of 18 to 20 gauge as per including the cost of required quantity of centering and shuttering as per the dirction of the Engineer in Charge.

-

-

-

... More
Lintel

0.35

2715

7757.8

... More
Chajja

1.08

11352

10511.3

0.37

3339

9026.9

1.79

14607

8160.5

... More
Straightening bend up or coiled rods cutting bending, cranking, hooking, welding or jointing (if required) the M.S. Rods or Tor Steel and binding wires and binding, tying the grills, hoisting, lowering and placing in proper position as required for R.C.C. works including cost, conveyance and taxes of M.S. Rods or Tor Steel and binding wires of 18 to 20 gauge and labour with all T&P required for the work etc, complete in all floors as per specification and direction of the Engineer-in-charge.

3.94

19141

4858.2

... More
Cost of M.S doors and windows :

124.8

7737

62

... More
Labour for fitting & fixing M.S. choukath to door & windows including making holes in the brick wall and fixing the clamps by using C.C (1:2:4) by using 12mm. size h.b.g chips with all cost, conveyance, labour, T&P etc., required for the work complete as per specification and direction of the Engineer-in-charge.

4.16

187

45

... More
Supplying all materials, labour, T&P and providing 12mm (1/2") thick cement plaster (1:6) finished smooth with cost and conveyance of all materials as per specification and direction of the Engineer-in-charge.

88.84

8644

97.3

... More
Supplying all materials, labour, T&P and providing C.C. (1:2:4) work using 12mm size hard black broken granite stone chips including cost, conveyance, royalty & taxes etc, complete in all respect but excluding cost of M.S. Rods or Tor Steel and binding wires of 18 to 20 gauge as per specification and direction of the Engineer-in-charge.

0.6

2830

4717.7

... More
Providing, fixing tiles in dados skirting and risers of steps on 12mm. thick cement plaster(1:3) jpinted with neat cement slurry mixed with pigment to match the shades of the tiles including rubbing & polishing with cost, conveyance of all materials royalty, taxes etc, complete & as per the direction of the Engineer-in-charge.

4.2

3224

767.7

... More
Providing & fixing (Glazed) tiles in all floor & treads of steps & landing on 25 mm thick bed of cement mortar in proportion (1:1) jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing & polishing with cost, conveyance of all materials royalty, taxes etc, complete & as per the direction of the Engineer-in-charge.

12

9792

816

... More
Supplying all materials, labour, T&P and providing 20mm (3/4") thick cement plaster (1:6) finished smooth to out side of stone work after raking out the joint including, watering and curing with cost and conveyance of all materials and labour with T&P ,all taxes and royalties etc., complete in all respect in all floors as per specification and direction of the Engineer-in-charge.

7.52

1104

146.9

... More
Supplying all material, labour, T&P and providing grading concrete with C.C(1:2:2) using 06mm. Size hard stone broken chips of approved quality including hpisting and laying not exceeding 25mm. thick with proper packing and required slope, with cost conveyance and taxes of all materials and labour with T&P required for the work etc, complete in all respect as per specification and direction of the Engineer-in-charge.

17.9

3776

211

... More
Supplying all labour, T&P and materials and finishing walls with two coats of cement paint over a coat of white wash with good shell lime with cost, conveyance, royalties and taxes of all the materials and labour with T&P required for the work etc, complete in all respect in all floors as per specification and direction of the Engineer-in-charge.

96.36

2447

25.4

... More
Painting two coats with any approved paint to new wood work and iron work including sand papering, polishing the surface, with cost conveyance and taxes of all materials and labour with T&P required for the work etc, complete in all respect including the the cost of appoved paint as per specification and direction of the Engineer-in-charge.

13.41

1766

131.7

... More
CONSTRUCTION OF COMPOUND WALL AROUND THE PUMP HOUSE

-

-

-

... More
Supplying all labour, T&P and materials for earth work excavation in foundation in all kinds of soil with all lead & lift including dressing the sides & levelling the bed of the foundation as directed by the Engineer-in-charges complete as per specification & direction of the Engineer-in-charge.

45.52

6299

138.4

... More
Supplying all labour, T&P and materials and providing Cement Concrete (1:4:8) in foundation and plinth with 4cm. H.G.Stone metal with cost, conveyance, royalty, taxes of all materials required for the work as per specification & direction of the Engineer-in-charge.

9.1

30574

3359.8

... More
Supplying all labour, T&P and materials and providing R.R. H.G.Stone masonary with C.M.(1:6) in foundation and plinth with granite stone including cost, conveyance, labour, tax, royalty of materials to worksite complete as directed by the Engineer-in-charge.

45.52

116822

2566.4

... More
Supplying all labour, T&P and materials and providing 1" thick D.P.C. over stone metal with cost, conveyance, tax, royalty of materials required and as per specification and direction of the Engineer-in-charge.

36.41

7464

205

... More
Supplying all labour, T&P and materials and providing brick work with C.B Bricks in c.m (1:6) in superstructure using well burnt C.B bricks of size 23cm x 11cm x 8cm including cost, conveyance, royalty of all materials as per specification and direction of the Engineer-in-charge.

28.35

90510

3192.6

... More
Cost of MS Grill Gate

67.5

4185

62

... More
Labour for fitting & fixing M.S. choukath to door & windows including making holes in the brick wall and fixing the clamps by using C.C (1:2:4) by using 12mm. size h.b.g chips with all cost, conveyance, labour, T&P etc., required for the work complete as per the direction of the Engineer-in-charge

2.25

101

45

... More
Supplying all labour, T&P and materials and providing 12mm (1/2") thick cement plaster (1:6) finished smooth with cost and conveyance of all materials as per specification and direction of the Engineer-in-charge.

243.66

23708

97.3

... More
Supplying all labour, T&P and materials and providing 20mm. thick cement plaster in cement mortar (1:6) for stone workand conveyance of all materials as per specification and direction of the Engineer-in-charge.

72.83

10698

146.9

... More
Supplying all labour, T&P and materials and finishing walls with cement paint of approved paint over a coat of white wash with good shell lime with cost, conveyance, royalties and taxes of all the materials and labour with T&P required for the work etc, complete in all respect in all floors as per specification and direction of the Engineer-in-charge.

316.49

8038

25.4

... More
Supplying all labour, T&P and materials and painting two coats with any approved paint to new iron work including paint sand papering, polishing the surface, with cost conveyance and taxes of all materials and labour with T&P required for the work etc, complete in all respect as per specification and direction of the Engineer-in-charge.

1.13

148

131.7

... More
CONSTRUCTION OF COMPOUND WALL AROUND 30000 LTR OGR

-

-

-

... More
Supplying all labour, T&P and materials for earth work excavation in foundation in all kinds of soil with all lead & lift including dressing the sides & levelling the bed of the foundation as directed by the Engineer-in-charges complete as per specification & direction of the Engineer-in-charge.

23.18

3208

138.4

... More
Supplying all labour, T&P and materials and providing Cement Concrete (1:4:8) in foundation and plinth with 4cm. H.G.Stone metal with cost, conveyance, royalty, taxes of all materials required for the work as per specification & direction of the Engineer-in-charge.

4.64

15589

3359.8

... More
Supplying all labour, T&P and materials and providing R.R. H.G.Stone masonary with C.M.(1:6) in foundation and plinth with granite stone including cost, conveyance, labour, tax, royalty of materials to worksite complete as directed by the Engineer-in-charge.

23.17

59463

2566.4

... More
Supplying all labour, T&P and materials and providing 1" thick D.P.C. over stone metal with cost, conveyance, tax, royalty of materials required and as per specification and direction of the Engineer-in-charge.

18.54

3800

205

... More
Supplying all labour, T&P and materials and providing brick work with C.B Bricks in c.m (1:6) in superstructure using well burnt C.B bricks of size 23cm x 11cm x 8cm including cost, conveyance, royalty of all materials as per specification and direction of the Engineer-in-charge.

14.64

46739

3192.6

... More
Cost of MS Grill Gate

67.5

4185

62

... More
Labour for fitting & fixing M.S. choukath to door & windows including making holes in the brick wall and fixing the clamps by using C.C (1:2:4) by using 12mm. size h.b.g chips with all cost, conveyance, labour, T&P etc., required for the work complete as per the direction of the Engineer-in-charge

2.25

101

45

... More
Supplying all labour, T&P and materials and providing 12mm (1/2") thick cement plaster (1:6) finished smooth with cost and conveyance of all materials as per specification and direction of the Engineer-in-charge.

124.5

12113

97.3

... More
Supplying all labour, T&P and materials and providing 20mm. thick cement plaster in cement mortar (1:6) for stone workand conveyance of all materials as per specification and direction of the Engineer-in-charge.

37.08

5447

146.9

... More
Supplying all labour, T&P and materials and finishing walls with cement paint of approved paint over a coat of white wash with good shell lime with cost, conveyance, royalties and taxes of all the materials and labour with T&P required for the work etc, complete in all respect in all floors as per specification and direction of the Engineer-in-charge.

161.58

4104

25.4

... More
Supplying all labour, T&P and materials and painting two coats with any approved paint to new iron work including paint sand papering, polishing the surface, with cost conveyance and taxes of all materials and labour with T&P required for the work etc, complete in all respect as per specification and direction of the Engineer-in-charge.

1.13

148

131.7

... More
LAYING OF RISING MAN

-

-

-

... More
Earth work in excavation of trenches for laying of pipe line including dressing, leveling the bed upto required depth & within initial lead of 50mtrs & 1.5mtrs initial lift breaking clods to maximum size (5 to 7cm) laying in layers not exceeding 0.30mtrs in depth etc. complete including cost of all labour, T&P, pipes, fittings and specials etc.required for completion of the item as per specification & direction of Engineer in charge.

-

-

-

... More
In stoney earth & gravel mix

102.6

20478

199.6

... More
Supplying all labour, T&P for filling in pipe line trenches with excavated materials including watering etc., all complete including proper care to the laid pipe lines to prevent damages of pipes and specials as per the direction of Engineer-in-charge.

-

-

-

... More
In stoney earth & gravel mix

102.6

11378

110.9

... More
Supplying all materials including HDPE pipes, fittings and specials, labour, T&P for laying in trenches unplasticised HDPE pipes of the following outside diameter for all classes and specials as required at site, including jointing with solvent cement by non heat application method excluding the cost of earth work in excavation but including the cost of pipes cost of fitting and specials & testing the pipe line etc. all complete as per direction of Engineer-in-charge.

-

-

-

... More
90mm HDPE pipe PE-80 PN -8

300

138540

461.8

... More
Supplying C.I double-flanged valves with hand wheel of following mentioned dia., all labour T&P and jointing materials and fitting and fixing the valves in proper position in the pipe line as per the direction of the Engineer-in-Charge.

-

-

-

... More
80 mm CI Sluice Valve

2

5178

2589.4

... More
80 mm CI NR Valve

2

4938

2469.4

... More
15mm CI Single Air Valve

2

2386

1193.4

... More
Supplying all labour, material, T&P and constructing brick masonry valve chambers of following mentioned inetrnal dimension, complete with C.C (1:4:8) at the bottom, C.B brick masonry in c.m(1:4) with internal plastering and R.C.C top cover with C.C(1:2:4) complete in all respect as per the direction of the Engineer-in-charge.

-

-

-

... More
SluiceValve/NR Valve Chamber

4

30684

7671

... More
Air Valve Chamber

2

10936

5468

... More
Supplying all materials, labour and T&P for fabricating, fitting and fixing with specials at the required site using hot dip galvanized pipes of medium class and standard weight of reputed make (Tata / Zindal make) confirming to IS 1239(P.1)2004/IS:1161 of the following dia including cutting the pipes and flanges drilling the bolt holes matching the pipes flanges and jointing with proper gradient and alignment, welding with using electrodes, fitting, fixing using mobile diesel generator set etc., complete as per direction of Engineer-in-charge to be used to cross drainage work including jointing with rubber insertion, nut and bolts, clamp making and fixing if required and providing necessary masonary support as per site condition and jointing to the water mains and providing scaffoldings as per direction of EIC

-

-

-

... More
100 mm dia G.I. pipe

75

95370

1271.6

... More
100 mm dia . Long Bend

5

4750

950

... More
100 mm dia . G.I. flange

20

7400

370

... More
LAYING OF DISTRIBUTION SYSTEM

-

-

-

... More
Earth work in excavation of trenches for laying of pipe line including dressing, leveling the bed upto required depth & within initial lead of 50mtrs & 1.5mtrs initial lift breaking clods to maximum size (5 to 7cm) laying in layers not exceeding 0.30mtrs in depth etc. complete including cost of all labour, T&P, pipes, fittings and specials etc.required for completion of the item as per specification & direction of Engineer in charge.

-

-

-

... More
In stoney earth & gravel mix

171

34131

199.6

... More
Supplying all materials including HDPE pipes, fittings and specials, labour, T&P for laying in trenches unplasticised HDPE pipes of the following outside diameter for all classes and specials as required at site, including jointing with solvent cement by non heat application method excluding the cost of earth work in excavation but including the cost of pipes cost of fitting and specials & testing the pipe line etc. all complete as per direction of Engineer-in-charge.

-

-

-

... More
90mm HDPE pipe PE-80 PN -8

500

230900

461.8

... More
Supplying all labour, T&P for filling in pipe line trenches with excavated materials including watering etc., all complete including proper care to the laid pipe lines to prevent damages of pipes and specials as per the direction of Engineer-in-charge.

-

-

-

... More
In stoney earth & gravel mix

171

18963

110.9

... More
Supplying C.I double-flanged valves with hand wheel of following mentioned dia., all labour T&P and jointing materials and fitting and fixing the valves in proper position in the pipe line as per the direction of the Engineer-in-Charge.

-

-

-

... More
80 mm CI Sluice Valve

2

5178

2589.4

... More
Supplying all labour, material, T&P and constructing brick masonry valve chambers of following mentioned inetrnal dimension, complete with C.C (1:4:8) at the bottom, C.B brick masonry in c.m(1:4) with internal plastering and R.C.C top cover with C.C(1:2:4) complete in all respect as per the direction of the Engineer-in-charge.

-

-

-

... More
SluiceValve/NR Valve Chamber

5

38355

7671

... More
Supplying all labour, T&P and materials and providing Cement Concrete (1:4:8) in foundation and plinth with 4cm. H.G.Stone metal with cost, conveyance, royalty, taxes of all materials required for the work as per specification & direction of the Engineer-in-charge.

4.5

15119

3359.8

... More
Supplying all materials, labour, T&P and providing C.C. (1:2:4) work using 12mm size hard black broken granite stone chips including cost, conveyance, royalty & taxes etc, complete in all respect but excluding cost of M.S. Rods or Tor Steel and binding wires of 18 to 20 gauge as per specification and direction of the Engineer-in-charge.

2.25

10614

4717.7

... More
Supplying all labour, T&P and dismentaling of concrete road for laying of pipe line and making good to the damage as per approved design and specification.

-

-

-

... More
Concrete Road

6.75

2508

371.7

... More
Supplying all labour T&P laying of pipe line to each house hold including cost of PVC/GI pipe, saddle of required size, brass ferrule and bib cock at the end of supply line including excavation trenches and making good the damages etc complet as per direction of Engineer in Charge as approved design and specification.

18

18000

1000

... More
Supplying all labour, T&P and materials and making provision of water supply to GP / AWC / Pry. Schools with the provision of overhead tanks etc. complete as as per approved design and specification.

2

36048

18024

... More
INTERNAL ELECTRIFICATION

-

-

-

... More
Supplying the following materials ,required labour and T &P and providing internal electrification to pump house as required at site including commisioning and testing as per the direction of the Engineer in Charge.

-

-

-

... More
Surface wiring to light point in 20mm dia PVC cond. Pipe on MS board wiyh 3mm thick mulltistand copper wire.

-

-

-

... More
a. Short point

5

1660

332

... More
b. Medium point

2

874

437

... More
Surface wiring to 3pin 5A plug point in 20m dia pvc conduit on existing board .

3

168

56

... More
surface wiring to 3pin 5A plug point in 20m dia pvc conduit on existing board .

-

-

-

... More
Medium point

1

437

437

... More
B.H. Fitting including all connection.

2

1520

760

... More
63 AMP 440 V ICTPN main switch

1

2750

2750

... More
3 nos 63 Amp kitkat fuse on MS Board.

1

800

800

... More
32 Amp main switch with all connections

1

557

557

... More
Sub- main wiring 4 x 4mm2 copper wire with in 20mm dia pvc conduit.

15

5265

351

... More
Sub- main wiring 2 x 2.5mm2 copper wire with in 20mm dia pvc conduit.

20

2060

103

... More
Standard earthing in 38mm dia 3mtr long GI pipe with No 8 GI wire including all connections.

1

1990

1990

... More
4' x 40 W F.L. Fitting complete with tube.

2

860

430

... More
25 x 5 mm thick iron FL frame , ( 6.5 ft x 2.5 ft ) embeded on wall with all consumable materials like cement chips painting etc including all connections with PVC paint, flexible pipe,copper cable etc.

1

1500

1500

... More
15 Amp switch and socket on 10 x 12 size MS board with all connections

1

207

207

... More
RYB phase indicator with control 5 Amp F.T. switch with all connection.

3

900

300

... More
5 Amp plug point on separate board fixed with 7" x 4" MS box with lylem cover with necessary connection.

-

-

-

... More
Short point

2

808

404

... More
10mm2 4 core cable

20

2800

140

... More
Celling Fan

1

1200

1200

... More
PUMPING UNIT

-

-

-

... More
Supplying installing, testing & commissioning of suitable horizantal Sumersible pumping set of any repurted make such as KSB/Crompton Greaves/ Kirloskar/ CRI/Suguna etc with energy efficient motor with ISI mark to run in 3 phase AC supply capble to discharge clear water from Production well @5000 LPH against a total head of 90 mtrs. along with suitable pannel board of reputed make with ISI mark and 3 core flat submersible cable of reputed make with ISI mark .

3

75600

25200

... More
Supplying Testing ,and installation of suitable control pannel Board for submerssible pump and motor set with reputed ISI make.

-

-

-

... More
Make BCH/L & T/Havels

2

10500

5250

... More
Required assessories like G.I R/S, stainless Steel nipple, G.I bend,wire ropw all of heavy quality with M.S calmp, MS bore cover etc. as required at site to complete the installation of the pimp set etc. complete in all respect.

2

8000

4000

... More
Cost of 6mm2 three core flat submerssible electric cable reputed ISI make Finolex/BCH/Havells

500

105000

210

... More
Supplying of 50 mm dia HDPE suction pipe for lowering of pump & motors etc

100

10200

102

... More
FIVE YEARS MAINTENANCE

-

-

-

... More
Cost of Opernation & maintenance

5

104870

20974



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.