Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
Refer DocumentsDocument Cost
₹ 11,800Tender Fee
Refer Documents
Summary
Civil And Structural Works For 5th Stream Alumina Plant Of Nalco At Damanjodi,orissa
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_BandR_660461_1Bid Award Id
ViewTender No
BandR/HO/51222/TD/EARTH WORK/01Tender Authority
Bridge And Roof Company India Limited ViewPurchaser Address
-Website
http://eprocure.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
eTender_NALCO_51222_Earthwork_in_Excavation
BOQ Items
... More
Item No: 1.02
All activities & scope same as in item 1.01 but for excavation below 2M and upto 4 M below existing ground level.
12448
-
209.61
... More
Item No: 1.03
All activities & scope same as per item 1.01 but for excavation below 4M and upto 6 M below existing ground level.
6379
-
251.69
... More
Item No: 1.04
All activities & scope same as per item 1.01 but for excavation beyond 6M depth below existing ground level.
2000
-
294.53
... More
Item No: 1.05
All specifications scope & activities same as for item no 1.01 but for excavation in SOFT-ROCK as defined in IS:1200 for soil classification and up to a depth of 2M below existing ground level.
34411
-
403.92
... More
Item No: 1.06
Extra over item No.1.05 for every 1 M depth of excavation below 2 M from existing ground level.
20647
-
42.84
... More
Item No: 1.07
Excavation in Hard Rock as defined in IS:1200 for soil classification, including all tools and tackles required for removal of rock by control blasting using appropriate blasting materials, safety precautions and under supervision of Licenced blaster and due permission from local statutory authorities including removal of broken pieces, stacking the same in measurable stacks, and disposal of the same as directed within 1 KM of the nearest edge of excavation, all supervision other incidental expenses, and depths of 2 M below existing ground level all work as per Technical Specification Sec No.1.
14196
-
556.92
... More
Item No: 1.08
Extra over item no 1.07 for excavation at every 1 M below 2 M from existing ground level.
12466
-
42.84
... More
Item No: 1.09
Excavation in hard rock or boulders by pneumatic chiselling or by diamond rope cutting / chemical method or any other suitable method(s) but not blasting, stacking the same in measurable stacks, and disposal of the same as directed within 1 KM of the nearest edge of excavation, all supervision overhead/ profit other incidental expenses, and depths of 2 M below existing ground level all work as per Technical Specification Sec No.1.
39338
-
858.33
... More
Item No: 1.10
Extra over item no 1.09 for every 1 M excavation of rock below 2 M from GL.
49022
-
42.84
... More
Item No: 1.11
Backfilling in with earth borrowed from outside by the contractor including supply of material, all transport, fill in 300 mm layers, compacting at Optimum Moisture Content including royalty, watering, transport, machinery, tools/ tackles etc. all as per Technical Specification Sec-1.
10228
-
323.6
... More
Item No: 1.12
Providing and filling in plinth with selected excavated surplus earth and compatible soil within a lead of 5km in 300 mm layer, compacting at Optimum Moisture Content including watering, transport, machinery, tools/ tackles etc. all as per technical spec. in Sec-1.
4000
-
148.41
... More
Item No: 1.14
Providing and laying 230 mm thick selected rubble soling under floors, foundation, and in other areas including filling the interstices with selected (approved) earth / murrum / downgraded metal and mechanical compaction by 8 / 10T roller to required level and grades all as per Sec-1 of technical specifications.
4545
-
395.74
... More
Item No: 1.16
Providing and filling washed, clean and screened gravel / stone agreegate of nominal size 75 mm to 40 mm down grade to required level and grades in trenches, pits etc. complete as per the direction of engineer-in-charge
50
-
1439.73
... More
Item No: 1.17
Filling around pipes / cables laid in the trenches with very fine river sand free from pebbles, vegetations, shrubs, debris, passing through sieve of 200 microns including compaction all complete as per drawing, specifications and as per the direction of Engineer-in-Charge.
35
-
1538.42
... More
Item No: 1.17a Filling in Foundations, pits, trenches with selected sand in layers including hydraulic compaction as per sect. 1 of technical Spec.
200
-
1552.95
... More
Item No: 1.18
Transporting the excavated material of ordinary soil, soft rock or hard rock as available from clause nos. 1.01 to 1.10 beyond 1KM and upto 2 km for the purpose of stacking or filling.
130726
-
22.19
... More
Item No: 1.18a
Transporting the excavated material of ordinary soil, soft rock or hard rock as available from clause nos. 1.01 to 1.10 beyond 2KM and upto 3 km for the purpose of stacking or filling.
12840
-
42.84
... More
Item No: 1.18b
Transporting the excavated material of ordinary soil, soft rock or hard rock as available from clause nos. 1.01 to 1.10 beyond 3KM and upto 5 km for the purpose of stacking or filling.
14340
-
82.62
... More
Item No: 1.18c
Transporting the excavated material of ordinary soil, soft rock or hard rock as available from clause nos. 1.01 to 1.10 beyond 5KM and upto 7 km for the purpose of stacking or filling.
14340
-
118.58
... More
Item No: 1.18d
Transporting the excavated material of ordinary soil, soft rock or hard rock as available from clause nos. 1.01 to 1.10 beyond 7KM and upto 10 km for the purpose of stacking or filling.
927
-
171.36
... More
Item No: 1.19
Preparing, dressing up and making side slopes of graded plots at the interface of higher level plot and lower level plot, and covering the same with 230mm thick. dry stone pitching in specified slopes with the excavated rubble.
50
-
837.68
... More
Item No: 1.21
Excavation in ordinary soil or filled up material for forming the subbase for receiving the road soling and compacting the sub base at Optimum Moisture content (O.M.C.) with 8 to 10 T roller, to proper grade and camber and elevation including all labour, supervision, plant/equipment, disposal of earth into road embankment or otherwise as directed etc. complete as per drawings for BOX CUTTING USING MECHANICAL EQUIPMENTS.
400
-
293.76
... More
TOTAL ESTIMATED VALUE OF WORK AGAINST SL NOs : 1.0 TO 25.0 ABOVE INCLUDING ALL TAXES & DUTIES, ROYALTIES, CESS, ENVIORMENTAL & POLLUTION, FITNESS & SAFETY CLEARANCE CHARGES ( IF ANY ) OR ANY OTHER INCIDENTAL CHARGES ETC BUT EXCLUDING GST.
-
-
-
... More
[ NOTE: Construction Power & Water, Cement, Reinforcement Steel, RMC, Land for Office, Godown, Labour hutment etc. inside and / or out side of Project premises as applicable, all tools, plants, materials, equipment & man power are in the scope of the Bidder within their quoted rate for the above work as per the relevant clauses of Tender document.]
-
-
-