Bhubaneswar Development Authority Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Bhubaneswar Development Authority - BDA Tender

Works
Electrical and Electronics
Eprocure
Opening Date7 Dec 2023
Closing Date21 Dec 2023
Tender Amount₹ 50,38,437 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Fish plate 50x6mm 2.36 kg/mtr,each 0.280 mtr length, 06nos required=(6x2.36x0.280)

3.96

-

116.51

... More
AB Switch mounting channel 75x40x4.8mm ,7.14kg/Mtr,each channel length 3Mtr. 2Nos channel required=(7.14x3x2)

42.84

-

90.82

... More
AB Switch side support channel 100x50x6mm,9.56Kg/mtr, each channel length 0.35 mtr, 2 nos channel required= (9.56x2x0.35)

6.69

-

90.82

... More
Channel support for down pipe 75x40x4.8mm,7.14kg/mtr each channel length 0.8 mtr, 1 nos channel required=(7.14x0.8x1)

5.71

-

90.82

... More
Double Pole Belting channel 75x40x4.8mm,7.14KG/Mtr each channel length 3.0 mtr, 4nos channel required=(7.14x3x4)

85.68

-

90.82

... More
50x50x6mm GI Bracing Angle, 4.5 Kg/Mtr, each angle length 3.512 mtr, 4nos angle required=(4.5x3.512x4)

63.22

-

90.82

... More
Danger Plate 2 nos

2

-

124.28

... More
Back clamp for danger plate 25x3mm flat,0.59 kg/mtr, flat of 0.510 mtr length 2 nos=(2x0.59x0.510)

0.6

-

116.51

... More
H.T.Stay clamp, 50x8mm flat 3.14 kg/mtr,0.511 mtr length, 2 nos qty required (1pair)

2

-

186.06

... More
H.T.Stay set (Complete)

2

-

1562.93

... More
H.T.Stay insulator type-C

2

-

74.43

... More
7/10 SWG Stay wire 15kg/stay

30

-

111.64

... More
GI pipe earthing 40mm, 3 mtr long

2

-

1562.93

... More
50x6mm GI Flat for earthing, 2.36 kg/mtr 12.5 Mtr for LA ,3Mtr for AB Switch Body,2.5Mtr for raising)=20.5x2.36

48.38

-

116.51

... More
GI barbed wire anticlimbing device 3 kg per support,2Nos quantity required=(2x3KG)

6

-

124.28

... More
Back clamp for anticlimbing device 25x3mm flat,0.59 kg/mtr, flat of 0.510 mtr length 8nos=(8x0.59x0.510)

2.41

-

116.51

... More
Lightning Arrester (12KV,10KA)(Staion Class, class-2)

3

-

5514.93

... More
AB Switch (11KV,200A,3 Pole,50Hz)

1

-

11418.23

... More
11KV pin insulator polymer

3

-

310.7

... More
H W fitting (B&S)70KN 3 bolt

6

-

543.73

... More
Disc insulator (B&S) 70 KN Polymer

6

-

1786.53

... More
PG Clamp for 55 sq mm AAA conductor

6

-

745.68

... More
GI Nut,bolt & washer of different sizes (13.718 kg each DP with AB Switch)

13.72

-

121.17

... More
Black paint

1

-

341.77

... More
Yellow colour paint for Background

2

-

258.12

... More
55mm2 AAAC

0.02

-

46605

... More
CIVIL AND SERVICES

-

-

-

... More
Fixing of complete 11KV line complete stay set includes 1. Turn Buckle Assembly, 2. Stay Rod & Stay plate, 3. Stay Insulator,4. Stay wire,5. Stay clamps with Nuts & bolts BA will do the excavation including excavation, supply of 0.5 Cum cement concrete foundation 1:2:4 size (500mmx500mmx800mm) using 20mm BHG metal with all labour and material as per TPCODL Drawing & standard.

2

-

2250

... More
Concreting ratio 1:1.5:3(500mmx500mmx1800mm)=0.45 Cu.mtr

0.9

-

6500

... More
Couping ration 1:1.5:3 with dimension (500x500x450)=0.1125 Cu mtr

0.23

-

6500

... More
Construction earthing chamber including installation of earthing.

2

-

3700

... More
Supply of Materials for 11KV, 3Core, 120Sqmm, XLPE insulation armoured UG Cable(SC rating of Cable in KA-11.3KA and SC rating of Armour in ka-12KA)

80

-

938.09

... More
Supply of outdoor termination kit Heat Shrinkable type suitable for 11KV,3Core,120Sqmm HT UG cable for 3 core(Set)

4

-

16734.67

... More
Supply of HDPE PE 80-PN8 pipe of110mm diameter (for 120sqmm HT cable laying)

48

-

391.57

... More
Erection Portion

-

-

-

... More
Laying,Commissioning, Testing of 11KV,3Core,120 Sqmm aluminium,XLPE insulation armoured (extruded type)UG cable by open trench method.

80

-

103.48

... More
Erection of outdoor termination kit Heat Shrinkable type suitable for 11KV,3Core,120Sqmm HT UG cable kits for 3 core(Set)

4

-

2081.38

... More
Laying of 110mm dia PE 80-PN8,HDPE pipe inside open trench.

48

-

328.5

... More
Civil Portion (Civil works with supply of all materials like cement,MS tor rod, brick,coarse & fine aggregrates and labour, T&P etc for UG Cable Trench)

-

-

-

... More
Earth work excavation of soil(1mtr width x 1mtr depth) Route Length a) Earth work excavation of soil

16.8

-

700

... More
b) Earth work excavation of hard rock

7.2

-

1720

... More
Back filling with excavated soil outside and above the trench

24

-

202

... More
Damage of asphalt/tar road and other utilities and reconstructing to bring to its orginal shape after laying of cable in open trench (1mtr width)

24

-

2643.67

... More
Supply and erection of GI Pipe of dia150mm,Class-B(8Mtr)

32

-

1463.4

... More
Supply and Erection of Cable Roue Marker along the cable route at an interval of 30Mtrs with civil works.

1

-

1012

... More
WPB (GI)160X152(11Mtr.long,30.44 Kg/Mtr)

2

-

35444.9

... More
Top Channel 100x50x6mm, 9.56 Kg/Mtr,each channel length 3mtr, 2 nos channel required=(2x9.56x3)

57.36

-

90.82

... More
Fish plate 50x6mm 2.36 kg/mtr,each 0.280 mtr length, 06nos required=(6x2.36x0.280)

3.97

-

116.51

... More
AB Switch mounting channel 75x40x4.8mm ,7.14kg/Mtr,each channel length 3Mtr. 2Nos channel required=(7.14x3x2)

42.84

-

90.82

... More
HT MU Mounting Channel 100x50x6mm, 9.56KG/Mtr,eachchannel length 3Mtr,2 Nos channel required=(9.56x3x2)

57.36

-

90.82

... More
Cantilever support channel 75x40x4.8mm GI Channel (810mm long, 2 nos)(7.14kg/mtr,2 nos.)(Each 2x0.810x7.14=11.57 kg)

11.57

-

90.82

... More
Angle for cantilever arrangement for HT MU 50 x 50 x 6-1282 mm each 2 nos (4.5 kg per mtr)

11.54

-

90.82

... More
MU and AB Switch Side support channel 100x50x6 mm 9.55KG/Mtr each channel length 0.35Mtr, 4Nos channel required=(9.5x4x0.35)

13.38

-

90.82

... More
Channel support for down pipe 75x40x4.8mm,7.14kg/mtr each channel length 0.8 mtr, 1 nos channel required=(7.14x0.8x1)

5.71

-

90.82

... More
Double pole bracing channel 75x40x4.8mm ,7.14kg/ Mtr each channel length 3 Mtr , 2 Nos channel required =(7.14x3x2)

42.84

-

90.82

... More
50x50x6mm GI Bracing Angle, 4.5 Kg/Mtr, each angle length 3.512 mtr, 2 nos angle required=(4.5x3.512x2)

31.61

-

90.82

... More
Danger Plate 2 nos

2

-

124.28

... More
Back clamp for danger plate 25x3mm flat,0.59 kg/mtr, flat of 0.510 mtr length 2 nos=(2x0.59x0.510)

0.6

-

116.51

... More
55mm2 AAAC-PVC Insulated for Jumpering.

15

-

66.01

... More
HT Stay Clamp 50x8 mmflat 3.14Kg/Mtr,0.551MtrLength,2Nos qty required(1Pair)

2

-

194.19

... More
H.T.Stay set (Complete)

2

-

1631.18

... More
H.T.Stay insulator type-C

2

-

77.68

... More
7/10 SWG Stay wire 15kg/stay

30

-

116.51

... More
GI pipe earthing 40mm, 3 mtr long

2

-

1631.18

... More
50x6mm GI Flat for earthing, 2.36 kg/mtr 12.5 Mtr for LA ,3Mtr for AB Switch Body,2.5Mtr for Mesh formation,2.5Mtr for raising)=20.5x2.36

48.38

-

116.51

... More
GI barbed wire anticlimbing device 3 kg per support,2Nos quantity required=(2x3KG)

6

-

124.28

... More
Back clamp for anticlimbing Device 25 x 3mm flat, 0.59 kg/mtr flat of 0.510 mtr length 2 nos= 8x0.59x 0.510)

2.41

-

116.51

... More
Lightning Arrester (12KV,10KA)(Staion Class, class-2)

3

-

5514.93

... More
AB Switch (11KV,200A,3 Pole,50Hz)

1

-

11418.23

... More
11KV pin insulator polymer

3

-

310.7

... More
H W fitting (B&S)70KN 3 bolt

6

-

543.73

... More
Disc insulator (B&S) 70 KN Polymer

6

-

1786.53

... More
PG Clamp for 55 sq mm AAA conductor

6

-

745.68

... More
GI Nut,bolt & washer of different sizes (13.718 kg each DP with AB Switch)

13.72

-

121.17

... More
Black paint

1

-

341.77

... More
Yellow colour paint for Background

2

-

258.12

... More
Civil & Services

-

-

-

... More
Fixing of complete 11KV line complete stay set includes 1. Turn Buckle Assembly, 2. Stay Rod & Stay plate, 3. Stay Insulator,4. Stay wire,5. Stay clamps with Nuts & bolts BA will do the excavation including excavation, supply of 0.5 Cum cement concrete foundation 1:2:4 size (500mmx500mmx800mm) using 20mm BHG metal with all labour and material as per TPCODL Drawing & standard.

2

-

2250

... More
Concreting ratio 1:1.5:3(500mmx500mmx1800mm)=0.45 Cu.mtr

0.9

-

6500

... More
Couping ration 1:1.5:3 with dimension(500x500x450)= 0.1125 Cu.mtr

0.23

-

6500

... More
Construction earthing chamber including installation of earthing.

2

-

3700

... More
Supply & erection of GI Fencing with gate.

20

-

3600

... More
PART - B

-

-

-

... More
Supply of 11KV, 3 Core, 120 Sqmm, XLPE insulation armoured UG Cable

240

-

938.09

... More
Supply of outdoor termination kits shrinkable type suitable for 11KV 3 Core, 120sqmm, HT UG Cable for 3 Core (Set)

4

-

16734.67

... More
Supply of HDPE PE 80-PN8 Pipe of 110mm diameter (for 120sqmm HT Cable laying)

148

-

391.57

... More
Erection Portion (Laying,commissioning, testing of 11KV, 3 Core, 120Sqmm, aluminium, XLPE insulation armoured (extruded type) UG cable by open trench method and HDD method.)

-

-

-

... More
Laying, commissioning, testing of 11KV, 3 Core, 120sqmm, aluminium, XLPE insulation armoured (Extruted type) UG cable by open trench method.

180

-

103.48

... More
Erection of Indoor termination Kits Heat Shrinkable type suitable for 11KV, 3 Core, 120sqmm, aluminum UG cable kits for 3 core(Set)

4

-

2081.38

... More
Installation, laying, commissioning & testing of 11KV, 3 Core,2 Runs, 120 Sqmm, XLPE UG Cable by HDD method with HDPE Pipe.(110mm dia, PNB PE80) including supply of HDPE Pipe.

60

-

2518.5

... More
Laying of 110mm dia PE 80-PN8, HDPE Pipe inside open trench

148

-

328.5

... More
Civil Portion (Civil works with supply of all materials like cement, MS for rod,brick,coarse & fine aggregates and labour, T& P, etc for UG Cable trench.)

-

-

-

... More
Earth work of excavation of soil (1mtr W x 1mtr D) a) Earth work excavation of soil

51.8

-

836.5

... More
b) Earth work excavation of hard rock

22.2

-

2055.4

... More
Backfilling with excavated soil outside and above the trench.

74

-

241.39

... More
Damage of Asphalt for/tar road and other utilities and reconstructing to bring to its original shape after laying of cable in open trench.(1mtr width)

74

-

3159.19

... More
Supply and erection of GI Pipe of dia 150mm, Class-B(8 Mtr)

32

-

1748.76

... More
Supply and erection of cable route marker along the cable route at an interval of 30 mtrs with civil works.

4

-

1209.34

... More
Dismantling of 09/11 Mtr Joist/WPB Pole- 116 x 100mm (Servicable Pole) after digging the pit and taking out the pole, transporation and stacking the pole at a proper place in safe position with 10Km/sitestore and refilling the pit with loose earth and ramming including removal and disposal of maiba at proper location .

3

-

1478.25

... More
Dismantling/Removal of V Cross arm from pole including loading, transporation, unloading and staking at a proper place in safe position/ site store.

2

-

49.47

... More
Dismantling of 11KV Pin Insulator with Pin including loading, transporation, unloading and staking at a proper place in safe position/ site store.

9

-

9.68

... More
Dismantling of 11KV Pin Insulator with Hardware including loading, transporation, unloading and staking at a proper place in safe position/ site store.

6

-

9.68

... More
Dismantling/Removal of MS Channel from pole including loading, transporation, unloading and staking of dismantled material at a proper place in safe position at site store.

22

-

9.46

... More
Dismantling of 11KV line.

300

-

7.77

... More
Supply of materials for 11KV 3 Core, 120Sqmm, XLPE insulation armoured UG Cable with accessoriess (

-

-

-

... More
Supply of 11KV, 4 Core, 70Sqmm, XLPE insulation armoured UG Cable

1600

-

412.57

... More
Supply of HDPE PE 80-PN8 Pipe of 110mm diameter

1600

-

391.57

... More
Erection Portion (Laying,commissioning, testing of 11KV, aluminium, XLPE insulation armoured UG cable by open trench method.)

-

-

-

... More
Laying, commissioning, testing of 11KV, 4 Core, 70sqmm, aluminium, XLPE insulation armoured UG cable

1600

-

51.25

... More
Laying of 110mm HDPE Pipe

1600

-

328.5

... More
Civil Portion (Civil works with supply of all materials like cement, MS for rod,brick,coarse & fine aggregates and labour, T& P, etc for UG Cable trench.)

-

-

-

... More
a) Earth work excavation of soil

560

-

836.5

... More
b) Earth work excavation of hard rock

240

-

2055.4

... More
Backfilling with excavated soil outside and above the trench.

800

-

241.39

... More
Damage of asphalt/tar road and other utilities and reconstructing to bring to its original shape after laying of cable in open trench.

50

-

3159.19

... More
Dismantling of 34mm2 AAAC

480

-

7.53

... More
Dismantling of LT ABC.

200

-

26.89

... More
Dismantling of LT RS Joist.

6

-

1613.25

... More
Supply and erection of G. I. Fencing with Gate

15

-

3942



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.