Bhubaneswar Development Authority Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Bhubaneswar Development Authority - BDA Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date30 Dec 2023
Closing Date18 Jan 2024
Tender Amount₹ 99,74,946
Costs
EMD
₹ 99,749Document Cost
₹ 11,800Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_BDABU_99166_1Bid Award Id
ViewTender No
970/SE-II/BDA/2023-24 dt.29.12.2023Tender Authority
Bhubaneswar Development Authority ViewPurchaser Address
-Website
http://https://www.bda.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Supplylof Two Ply G.I. barbed wire for fencing by means of staples and straning hooks by means of tying with G.I. wires etc. complete including cost all materials and all labour, conveyance and T&P etc. as required for the work complete as direction of the Enhineer-in-charge.
5016.87
445999
88.9
Labour for fixing of barbed wire fencing and posts by means of staples and straining fooks by means of tying with G.I. wires including cost of all staples. hooks and tying wires etc. all complete as required for the work complete as direction of the Engineer-in-charge.
17917.4
17738
0.99
Earth work in excavation in foundation & trenches within 50m. initial lead & 1.5m. initial lift including levelling, dressing & breaking clods to maximum 5cm. to 7cm. & laying in layers not exceeding 0.3m. in depth including all labour, T&P etc. as per direction of the Engineer-in-charge.
-
-
-
All kinds of soil
337.68
78443
232.3
Cutting DI rock upto 1.50 mtr depth other than granite and laterite not requiring blasting.
135.07
72235
534.8
Supplying all materials, labour,T&P and sand filling F&P with sand wel watered, rammed including cost, conveyance, royalty and taxes etc all complete as per the direction of Engineer-in-charge.
70.35
36413
517.6
Supplying all materials, labour,T&P and providing Cement concrete (1:4:8) with 40mm size C.B hard granite metal including cost, conveyance, royalty and taxes etc all complete as per the direction of Engineer-in-charge.
70.35
365257
5192
Supplying all materials, labour, T&P for Fly ash Brick masonry of size 25cm x 12cm x 8cm in cement mortar (1:6) in F&P and curng including cost, conveyance, royalty and taxes etc all complete as per the direction of Engineer-in-charge.
259.3
1297796
5005
Supplying & filling all materials, labour,T&P for Filling foundation and plinth with excavated materials (1/3 of excavation material) including cost, conveyance, royalty and taxes etc all complete as per the direction of Engineer-in-charge.
157.58
20343
129.1
Supplying all materials, labour,T&P for 2.5cm thick damp proof course with C.C. (1:2:4) using 12mm size hard broken granite chips and curing including cost, conveyance, royalty and taxes etc all complete as per the direction of Engineer-in-charge.
381.9
123277
322.8
Supplying all materials, labour, T&P for Fly ash Brick masonry in cement mortar (1:6) in superstructure and curing including cost, conveyance, royalty and taxes etc all complete as per the direction of Engineer-in-charge.
346.73
1746929
5038.3
Supplying all materials, labour,T&P and providing Cement concrete M-20 (Column Footing, Column Beam & Column) with 12mm size hard granite chips including cost, conveyance, royalty and taxes etc all complete as per the direction of Engineer-in-charge.
134.57
842798
6262.9
M.S. Reinforcement for R.C.C. works including cutting,bending, binding and tying grills and placing in position including cost of M.S.Rods, binding wire 18 to 20 gauge including conveyance and taxes etc all complete as per the direction of Engineer-in-charge.
201.85
1792044
8878.1
Supplying all materials, labour,T&P for 12mm. thick cement plaster in cement mortar (1:6) over brick work and curing including cost, conveyance and taxes etc all complete as per the direction of Engineer-in-charge.
1758.75
264516
150.4
Supplying all materials, labour,T&P for 16mm. thick cement plaster in cement mortar (1:6) over brick work and curing including cost, conveyance and taxes etc all complete as per the direction of Engineer-in-charge.
1507.5
325017
215.6
Supplying all materials, labor, T&P for Finishing walls with water proofing cement paint of approved shade on new work- two coats over one coat cement wash to give an even shade including cost of brushes and putty including cost, conveyance and taxes etc all complete as per the direction of Engineer-in-charge.
3266.25
167558
51.3
Supplying all materials, labour,T&P and making of M.S gate made out of M.S angle, flat,rod etc with necessary hinges,hold fast, aldrop, tower bolt etc locking arrangements complete asper drawing, design with Labour charges for fitting and fixing of MS grill, gate etc. Including cutting holes for fixing of clamp and placing the grill/ gate in proper position, plumb and fitting the clamp holes with CC including cost of all materials, labour T&P as required for the work & direction of Engineer in charge.
16755
1388989
82.9
Supplying all materials, painting two coats with Enamel paint over a coat of primer to iron works with cost of materials, labour, T&P with etc all complete as per direction of Engineer-in-charge.
330.6
72368
218.9
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements