Bharat Sanchar Nigam Limited Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
₹ 31,300Document Cost
₹ 590Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_BSNL_218803_1Bid Award Id
ViewTender No
50/CE(C)/2024-25/BCD/CuttackTender Authority
Bharat Sanchar Nigam Limited ViewPurchaser Address
-Website
http://bsnl.co.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead up to 50 m and lift up to 1.5m, as directed by Engineer-in-Charge.
-
-
-
... More
Ordinary rock
24
-
-
... More
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
-
-
-
... More
All kinds of soil.
4
-
-
... More
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
252
-
-
... More
Extra for every additional lift of 1.5 m or part thereof in excavation /banking excavated or stacked materials.
-
-
-
... More
All kinds of soil.
166
-
-
... More
Ordinary or hard rock.
24
-
-
... More
Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.
4
-
-
... More
Sub-Head : Concrete Work
-
-
-
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
-
-
-
... More
1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources)
8
-
-
... More
Sub-Head : Reinforced Cement Concrete
-
-
-
... More
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :
-
-
-
... More
1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
74
-
-
... More
1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size derived fro natural resources)
2
-
-
... More
Centering and shuttering including strutting, propping etc. and removal of form for :
-
-
-
... More
Foundations, footings, bases of columns, etc. for mass concrete
62
-
-
... More
Lintels, beams, plinth beams, girders, bressumers and cantilevers
12
-
-
... More
Columns, Pillars, Piers, Abutments, Posts and Struts
50
-
-
... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
-
-
-
... More
Thermo-Mechanically Treated bars of grade Fe-500D or more.
5250
-
-
... More
Smooth finishing of the exposed surface of R.C.C. work with 6 mm thick cement mortar 1:3 (1 Cement : 3 fine sand).
18
-
-
... More
Sub-Head : Masonry Work
-
-
-
... More
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 5.0 in foundation and plinth in:
-
-
-
... More
Cement mortar 1:6 (1 cement : 6 Coarse sand)
4
-
-
... More
Sub-Head : Flooring
-
-
-
... More
52 mm thick cement concrete flooring with concrete hardener topping, under layer 40 mm thick cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and top layer 12 mm thick cement hardener consisting of mix 1:2 (1 cement hardener mix : 2 graded stone aggregate 6 mm nominal size) by volume, hardening compound mixed @ 2 litre per 50 kg of cement or as per manufacturer's specifications. This includes cost of cement slurry, but excluding the cost of nosing of steps etc. complete.
4
-
-
... More
Sub-Head : Finishing
-
-
-
... More
12 mm cement plaster of mix :
-
-
-
... More
1:6 (1 cement: 6 coarse sand)
16
-
-
... More
Sub-Head : Tower Work
-
-
-
... More
Carriage of anchor bolts,templates, nuts, guide angle and base plate as required as per direction of Engineer-in-charge from place of store at BHUBANESWAR to work site. Rate includes sorting, labour charges in loading and unloading, safe handling etc all complete.
2
-
-
... More
Galvanising of MS high density tower anchor nuts, washers & bolts (32 nos top 0.20m length) etc as per requirement all complete as per direction of Engineer-in-charge, for protecting against corrosion in coastal & extreme weather conditions area.
2
-
-
... More
Labour charges for arranging and fixing the anchor bolts of 32mm dia @ 9.00 nos in each column (Total 36 nos) including nuts and base plate etc. in position as per direction of Engineer-in-charge. (Templates and anchor bolts, nuts and washers will be supplied by the department)
2
-
-
... More
Providing and fixing ring earth consisting of specified and required ring size at site and laying of G.I. Flats of size 50 x 6 mm laid at the bottom of the tower foundation pit, one metre away from the tower base. The G.I. flats shall be connected with each other with G.I. nuts and bolts after placing lead strips/ lead wool of 90x50x1mm thick in between and with legs of tower with G.I. nuts and bolts with spring washers. All the joints shall be properly wrapped and sealed by water proof tape to avoid ingress of moisture. The G.I flats shall be covered with fine and cohesive good earth all around and duly compacted. The G.I. flats shall be bent in such a way that curves are smooth having radius not less than one metre. The rate shall be inclusive of all materials and labour including tools and plants, incidental cost etc. all complete and nothing extra shall be paid on any account except earthwork in excavation, filling available excavated earth or good earth brought from outside as the case may be. (Note: Payment shall be made only if the ohmic value of the earth resistance is 0.5 ohms or less. Security deposit for the whole work will be released only after completion of A/T Any rectification required to make earth resistance to 0.5 ohms or less is to be carried out by the agency. If the A/T is not done in one year after completion of work 75% of S.D. will be released. Remaining part of S.D. will be released after completion of A/T).
96
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements