Bank Of Baroda Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
ea7156d7-79b7-3f18-94ab-9104c621e2feTender Authority
Bank Of Baroda ViewPurchaser Address
-Website
http://bankofbaroda.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
LOW HEIGHT Partition ( Semi Glazed)
-
-
-
Providing and fixing in position partly glazed 4'-0" HT. Partition work as per drawing ,in frame work at 2’x2’ grind (horizontally and vertically) comprising of 2”x1 ½” hevy gazed almunium section ( confermin ISI 303 )and/or as per frame work shown in the drawings with 9 mm BWP ply on both sides finished with 1 mm thick laminates of approved shade and colour as shown in drawings. Item to include 12 mm thick glass with chemical eaching as per design and fitted with 3-1/4" thick beach wood beading at glass sides All exposed wood. surfaces to be finished in melamine polish of as directed including all necessary Stainless Steel finish fittings/hardware and wood preservative paint etc. as per list of approved material and as approved by the Project Consultant/Bank complete in all respects.
115
-
-
Full glazed Partition
-
-
-
Providing , fitting & fixing 12mm thick flot glass partition with chemically eaching as per design.the partiton will be supported with S.S patch panel fittings as per drawing and design. The exposed edge of the glass partition should be polished to super quality. The work should be completed as per direction of architect including cost of all labour & material .
94
-
-
DOOR WORK.
-
-
-
Doors – semi glazed
-
-
-
Providing & fabricating fixing door shutter with 28mm x 75mm height & 28mm x 75mm, 28 mmx 60mm, 28mm x80mm rails respectively by using Giringa/ Kasi wood of well seasoned with necessary wood joining, planning, polishing etc., as per drawing matching the aligned partition . The shutter will have part glazed 8mm thk float glass side beveled , high polished & part solid one covered with 9 mm BWP ply, both sides covered with 1 mm tk laminate of approved shade with necessary wood beading etc mat polished with melamine polish of asian / ici , complete to match the aligned partition elevations designs, the rates are inclusive of cost of necessary hinges, handles ( 1'-0"long ), aldrops etc., all labour, materials, taxes, leads & lift to the place of work executed to the satisfaction of the Architect.
95
-
-
Doors – ( solid )
-
-
-
Providing and fixing solid doors of sizes as shown in the drawing. The door shutter shall of 35 mm thick flush shutter of approved make and finished with two coat of enamel paint over one coat of wood primenr on both sides. The edges finished with TW lipping. A door frame of 3.5” x 2" section of hard wood shall be provided finished in two coat of enamel paint over one coat of wood primenr . Rate shall include Dead lock ( Godrej Make), door stopper, a pair of handles 12" SS Brushed finished, 5" hinges 4 Nos., buffers, tower bolts, etc with necessary hardware. The work should be completed including all labour and materials.
88
-
-
Doors – glazed
-
-
-
Providing and fixing Entrance Door (glazed) as per drawing in black Anodised aluminium door single groove section jumbu section of size 150mmx50mm (Jindal make) in top and bottom and glazed with 12 mm thick toughen glass of approved make with chemical eaching design as per drg. . Item to include all necessary hardware of Stainless Steel finish as approved by the Project Consultant/Bank complete in all respects.
-
-
-
a) Open able portion ( it include SS finished H type 1'-6" long door handle )
24.5
-
-
a) Fixed portion
55
-
-
Door closer
-
-
-
Providing and fixing Godrej/ Doorset make over head door closers in door with necessary fixtures and fittings etc.
7
-
-
Floor spring
-
-
-
Providing and fixing Godrej/ Door set make heavy duty floor spring in entrance door with necessary fixtures and fittings etc.
1
-
-
Night latch lock
-
-
-
Providing and fixing Knightlatch lock of Godrej make to cash counter door with necessary fixture and fittings etc as per direction of architect.
2
-
-
Suggesion box/ Cheque drop box
-
-
-
Supplying and erecting free-standing suggestions box of overall size , 450 mm long x 300 mm deep x450 mm high made of 19 mm thick phenol formaldehyde block board, all as in drawing, complete. with hardware. fittings and fixtures of approved make and quality.Top and all exposed surfaces of block board are to be finished with 1mm thick laminate sheet of approved shade and quality. Inner faces of block board surfaces are to be finished with 0.7 mm th inner laminate of approved shads and quality . The shutter should have a glzed portion of size 6"x6" with 8mm. th. clear glass. The work should be done as per design including all labour , material, hardware etc.
2
-
-
Flap door
-
-
-
Providing, fitting and fixing of flap door with frame work made out of 35mmx35mm thick hard wood and nailed with 6mm. thick ply and finished with 1mm. Thick laminates of approved colour and design on both the surfaces of the frame work as per drawing and design.The edges of the door to be covered with decorative wood moulding with two coat of superior wax polish.The work is to be finished with all material ,labour,nails,screws,hings,locks,handles,door closer and all other hard wares as per detail drawings.
12
-
-
FURNITURE WORK.
-
-
-
Cash Counter
-
-
-
Providing and fixing of counter table of size 4'-6"x2'-9"x 2'-6"the front facia is raised up to ht of 3'-10" with a horizontal 15" wide counter top and front drawer unit consisting 3 Nos of drawer units slides on telescopic slider made up of 19mm th.ply/ HDF ply with locking arrangement. It also include metal Keyboard tray and CPU trolley without Mousepad manufactured by M/s Godrej / EBCO.The keyboard is a pullout type, fixed to channels and screwed to below table top and mobile metal CPU trolley attached with 4 wheels for holding CPU and for its smooth movement .The exposed edge surfaces are to be finished with 1.0mm th.laminates as per design of approved shade and the inner surface is finished with 0.7 mm th inner laminate . shall also include cost of polished teak wood moulding (finished 40x20 mm section) to edges of table. top: polished teak wood- lipping (6mm thick) to free edges of block board /plywood surfaces; approved drawer-slides, hinges and locks with keys in dupli'cate : other necessary hardware and accessories including satin finish S.S handles. knobs and wire - managers etc. of approved qualityThe work should be mpleted including all labour and material
2
-
-
Manager's & Officer table
-
-
-
Providing executive type manager table and a front drawer unit consisting 3 Nos of drawer units,slides on telescopic slider made up of 19mm th.ply / HDF ply ( conforming IS 710 ) with locking arrangement. It also include metal Keyboard tray and CPU trolley without Mousepad manufactured by M/s Godrej / EBCO.The keyboard is a pullout type, fixed to channels and screwed to below table top and mobile metal CPU trolley attached with 4 wheels for holding CPU and for its smooth movement The exposed edge surfaces are to be finished with 1.0mm th.laminates as per design of approved shadea and the inner surface is finished with 0.7 mm th inner laminate . The side credenza will have two drawer unit slides on telescopic slider and two cupboard unit. Quoted rates shall also include cost of polished teak wood moulding (finished 40x20 mm section) to edges of table. top: polished teak wood- lipping
-
-
-
(6mm thick) to free edges of block board /plywood surfaces; approved drawer-slides, hinges and locks with keys in dupli'cate : other necessary hardware and accessories including satin finish S.S handles. knobs and wire - managers etc. of approved qualityThe work should be mpleted including all labour and material.It also include 8mm glass top on table with edge polished. All the work should be done as per drawing and as per direction of architect.
-
-
-
a) Approx. size of 5'-6"x 2'-6"x 2'-6"
1
-
-
b) Approx. size of 4'-6"x 2'-9"x 2'-6"
7
-
-
c) Approx. size of 4'-6"x 2'-6"x 2'-6"
1
-
-
Side Storage Unit
-
-
-
Providing and fixing of table side storage cabinate as per mention size made out of 19mm th. block board having one/ two drawer uint at top and cupboard unit at bottom as per design / instruction by acchitect . The storage unit and drawer units should have locking arrangement with front shutter .The exposed surface is to finished with 1.0mm th.laminates as per design of approved shade and the inner surface is finished with 0.7 mm th inner laminate . The work also include intermediate shaves as per design .The work should be completed according to drawing and design including all labour and materials.
-
-
-
a) Approx. size of 3'-6" x 1'-6"X 2'-6"
1
-
-
b) Approx. size of 3'-0" x 1'-6"X 2'-6"
1
-
-
Low Height Storage Cabinate.
-
-
-
Providing and fixing of low/full height storage cabinate having 450mm. depth of made out of 19mm th. block board with locking arrangement by sliding/shutter at front .The exposed surface is to finished with 1.0mm th.laminates as per design of approved shade and the inner surface is finished with 0.7 mm th inner laminate surfaces are to be finished with as per design The work should be completed according to drawing and design including all labour and materials.
90
-
-
Full Height Storage ( 450mm Depth )
-
-
-
Providing and fixing of low height storage cabinate having 450 mm. depth & 25 mm thk Modular Top made from 25 mm thick BWP grade Solid ply (AUSTIN-GOLD,SABURI-GOLD) all side finished with 1.0 mm thick Laminate of approved shade on the exterior side as per design of approved colour and the inner surface is finished with 0.8 mm thick Laminate of approved colour. The work shall be completed with all necessary hardwares i.e, S.S Handles,brass locks,wall catches etc,labour and materials etc.
320
-
-
Pedestal Unit
-
-
-
Providing and installing drawer boxes of size 585mm ht / fixed under table, 390mm width and 500mm deep, top made out of 19mm Board board as per design . The unit in made for one drawer unit of 125mm ht. and other portion a cupboard unit. The exposed surface is to finished with 1.0mm th.laminates as per design of approved shade and the inner surface is finished with 0.7 mm th inner laminate.The unit is furnished with key lock mechanism / SS telescopic channels and provided with handle and necessaryfixtures (heavy duty high performance) as directed.
7
-
-
CELING WORK
-
-
-
False ceiling (Gypsum board.)
-
-
-
Providing & fixing at site plain gypsum board stepped/ flush false ceiling as per pattern &design made from 12.5mm thk paper reinforced gypboard sheets fixed with mainframe channels 80mm x 26mm x0.5mm, every 450mm c/c or as mentioned in drawing intermediate channels 15mm x 45mm x 0.9mm at every 1220mm c/c with perimeter channel 20mm x 26mm x 0.5mm all along the wall shall be provided. The whole system to be suspended with strap bolts as recommended using rawl plugs 12.5mm dia. x 35mm long, with 6mm dia bolt & soffit cleat 27mm x37mm x 25mm x1.6mm thk. Gypboards to be screw fixed to the above framework using 25 mm dry wall screws. Provisions of melamine polished white beach wood moulding at wall / partition joints. Arrangements are to be made to accommodate light fixtures by forming recessed channels etc., wherever directed. Depressions, nails & screws, jointing & finishing etc., shall be done with jointing compound & paper tape. Ceiling shall be finished with painting 2 coats of plastic emulsion paint ( velvet touch ) of approved shade . Ceiling to be leveled & free from cracks including fixing GI perimeter to hold light fittings. Item to be completed in all respect to the Architect’s approval. Provision of Opening ( openable ) min 4 nos( for maintenance purpose ) in ceiling as per site conditions are to be done with necessary timber frame work tied with perimeter channel properly such as to match the remaining area of ceiling by leveling perfectly complete in all respect. This rate includes cost of all materials, labours, royalty,taxes, lead & lift to the place of work& also the cost of all fittings, (Measurements shall be taken for flat surface).
795
-
-
False celing ( modular )
-
-
-
Providing & fixing in position false ceiling in Armstrong 600 x 600 mm x 15/16 mm Dune Supreme RH 90 Prima tile with sheihard gride Tegular edge framework as specified by Armstrong Co. with suspenders wherever required. Making necessary framework for A. C. ducting, if any, and necessary cutouts for diffusers and light fittings, taping and finishing to proper line & level, including making grooves and trap doors for A. C. unit in 18 mm thick M. R. Grade Plywood with Stainless Steel hinges & locks with moulding 1” x 1” for edges including finishing with White Plastic Emulsion Paint etc. complete in all respects.(Note :- Only the plan area will be measured for payment. No extra payment will be made for cutouts, grooves, mouldings etc.)
588
-
-
OTHER WORK
-
-
-
Panelling ( Mica finished )
-
-
-
Encasing to columns , banking hall entrance where ever shown in drawings by fixing 6mm ply to the frames made out of 40mm x20mm. 2nd class treated hard wood like Kasi/Giringa by means of nailing or screwing over with 1 mm tk laminate fixed by means of adhesive having grooves & necessary white beach beading as directed by the Architect finished with melamine finished WB wood moulding & cornice lining . At places niches shall be created to accommodate 12 mm tk soft board & fabric of approved quality fixed with necessary frame work of wood . Nitches shall be leaped with WB wood which is also melamine polished. The O H planter box as specified in other items at certain height projected from the column / walls / partitions etc fixed as per Architect’s drawing/ direction. The cost includes all the materials, labour, trasportation taxes etc., complete for the work.
118
-
-
Notice Board
-
-
-
Providing soft board covered with approved fabric with wooden frame work and decorative beading for display drawings and documents,with locking arrangementof the sliding shutter made up of 8mm th. flot glass. The work should be done including all labour and material.
12
-
-
Wall Putty work.
-
-
-
Providing and applying wall puttyputty work punning in order to make the total plastered wall surface perfectly leveled , including cost of all materials, labour, conveyance, taxes, royalties, scaffolding, watering, curing, sundries, T&P, etc., as per direction of Engineer-in-charge.
1468
-
-
Wall plastic paint.
-
-
-
Providing & applying 2 coats of plastic emulsion paint of royale ICI dulux & approved shade on wall, columns, beams, ceiling, etc. of back office hall including locker room, including preparation of surface, sand papering the intermediate coats, including cost of all materials, labour, conveyance, taxes, royalties, scaffolding, watering, curing, sundries, T&P, etc., as per direction of Engineer-in-charge.
4200
-
-
Electrical panel board cover
-
-
-
Providing and fixing of electrical panel board cover made up of 19mm ply with two shutter at the front having T.W luvers as per drawing and design, it allso have furnished with locking arrangement. The exposed surface is finished with 1mm. Th. Laminates and inner surface is finished with two cote of plastic emulsion paint over one coate of primer . The work should be completed including all hardware, material and labour.
28
-
-
Façade of front entrance door.
-
-
-
Providing and fixing in position Aluminium composite panel boxing with PVDF coating & LDPE core laminated Eurobond / Altobond/ Alukbond Exterior Grade 4 mm thick with composite of (0.5 mm – 3 mm – 0.5 mm) including fabrication for the same with aluminium sections, required hardware, silicon sealant (Dow corning 789) masking tape, necessary scaffolding etc. as detailed in drawing complete in all respects.
100
-
-
Vertical blinds
-
-
-
Supplying, fitting & fixing in position coloured 0.33mm thickness acrylic coated cleanable/ washable vertical blinds (Marvel or its equivalent, as approved) inclusive of all recommended accessories colour pattern etc., as per Architect’s approval. The cost includes all the materials, labour, trasportation taxes etc., complete for the work.
28
-
-
Dustbin
-
-
-
Providing cylindrical type SS dustbin of 9" dia & 18" height (refer attached photograph).
3
-
-
Dismentalling
-
-
-
Removing and demolishing existing partition,counter, glass etc as per direction in phase manner to not affecting the working condition of the branch. Complete the job in all respect i.e clening, removing the deamaged material out side the premises as per instruction, including all labour.
-
-
-
TOTAL
-
-
-
G.S.T@18%
-
-
-
G.TOTAL ( A)
-
-
-
Buy back value
-
-
-
Salvage Value of Old Furniture items ( list to be provided by the Bank) (Buy Back amount - Rs. 71000.00 )
-
-
-
G.TOTAL ( AFTER BUY BACK ) ( A - 71000.00 )
-
-
-
Total Amount in Words :-
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements