Agriculture And Farmers Empowerment Department Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Agriculture And Farmers Empowerment Department Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date11 Jul 2024
Closing Date25 Jul 2024
Tender Amount₹ 12,15,786 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Pillar on 1st floor

0.06

1143

18292.74

... More
Staircase Landing Slab

1.03

14675

14304.04

... More
Staircase Steps

0.32

5066

15832.84

... More
Lintel for staircase 1st floor

0.18

2727

15151.36

... More
Columns and Beams on 2nd floor

1.54

32619

21181.8

... More
Sunshade Chajja for staircase door on 2nd Floor

0.45

678

1506.66

... More
Staircase roof on 2nd floor

1.87

30435

16275.7

... More
Supplying,fitting and placing uncoated HYSD bar reinforcement complete as per drawing and techenical specification

-

-

-

... More
1st floor

1.68

14611

8703.31

... More
2nd floor

5.28

46063

8730.84

... More
Brick Work in C.M. (1:6) with F.A. Bricks

-

-

-

... More
1st floor

3.44

18011

5235.86

... More
2nd floor

16.65

92721

5568.88

... More
12mm thick cement plaster in C.M(1:6)over brick work

-

-

-

... More
Ground floor (Inside)

189.12

27577

145.82

... More
1st floor (Inside)

208.76

31144

149.19

... More
1st floor (outside)

43.92

6651

151.44

... More
2nd floor (Inside)

34.44

5258

152.68

... More
2nd floor (outside)

109.46

17223

157.35

... More
6mm thick cement plaster in C.M(1:4)RCC surfaces finished smooth including closed deep chiping and slury treatment

-

-

-

... More
1st floor (Inside)

27.9

4686

167.98

... More
2nd floor (Inside)

24.96

4295

172.09

... More
2nd floor (outside)

8.95

1589

177.62

... More
Iron work wrought and put up in grated doors, windows and cage latrines

63

6349

100.78

... More
Removing old lime or cement plaster from walls including raking out joints 12mm deep and removing the debris within 50m lead

-

-

-

... More
Ground Floor (Inside)

189.12

8313

43.96

... More
Ground floor (Outside)

100.87

4434

43.96

... More
First Floor (Inside)

171.47

7915

46.16

... More
First Floor (Outside)

90.38

4171

46.16

... More
Dismantling and removing R.C.C. chajja, fins and parapet including stacking the useful materials for reuse and removing the debris within 50m lead

-

-

-

... More
Ground Floor

3.15

484

153.87

... More
First Floor

2.52

407

161.56

... More
Dismantling and removing doors, windows and ventilators including removal of frame, hinges, fastening and stacking the same for reuse and removing the debris within 50m lead

8.06

2823

350.33

... More
Dismantling and removing 2.5cm thick artificial stone flooring including stacking the useful materials for reuse and removing the debris within 50m lead

-

-

-

... More
Ground Floor

105.55

9279

87.92

... More
First Floor

111.27

10272

92.32

... More
Fixing Ceramic Glazed wall tiles in dados skirting and risers of steps on 12 mm thick cement plaster(1:3) jointed with neat cement slurry mixed with pigments to matche shade of the tiles including rubbing and polishing complete.

-

-

-

... More
Ground Floor

25.62

32415

1265.23

... More
First Floor

25.62

33271

1298.64

... More
Fixing Vitrified tiles in dados (Printed Series) skirting and risers of stepson 12 mm thick cement plaster(1:3) jointed with neat cement slurry mixed with pigments to matche shade of the tiles including rubbing and polishing complete

-

-

-

... More
Ground Floor

14.4

23340

1620.87

... More
First Floor

14.56

24086

1654.28

... More
Fixing colour Vitrified tiles in floors (Printed Series) of size 600mm x600 mm of approved make conforming IS:13755 laid on 20 mm thick cement mortar (1:4)and filling joints with white cement of approved quality including cost of all materials, labour T&P etc required for the work all complete.

-

-

-

... More
Ground Floor

105.55

120135

1138.19

... More
First Floor

111.27

127838

1148.9

... More
Fixing Granite tiles of size above 0.4 Sqm. (20mm. thick) in floors,treads or steps and landings on 25 mm thick CM (1:1) jointed with neat cement slurry mixed with pigments to match the shades includind cost for rubbing, polishing & cost of marbel tiles etc. complete

-

-

-

... More
Ground Floor

3.75

11730

3128.07

... More
First Floor

11.12

35042

3151.3

... More
Fixing granite tiles of 0.10 Sqm. & upto 0.4 Sqm. (10mm. thick) in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shades includind cost for rubbing, poloshing complete including cost of tiles etc. complete

-

-

-

... More
Ground Floor

2.25

5259

2337.38

... More
First Floor

0.73

1730

2370.79

... More
Supplying Fitting and Fixing of 32mm thick flush door shutter with approved quality of 30mm thick BWR block board pasted with 1mm thick sunmica on both side of approved design and quality including cost of all door fittings and fixtures etc. complete

-

-

-

... More
Door of PD Chamber

2.21

27114

12268.9

... More
30 mm thick Fiberglass Reinforced Plastic (F.R.P.) flush door shutter in different plain and wood finish made with fire retardant grade unsaturated polyester resin, moulded to 3 mm thick FRP laminate all around, with suitable wooden blocks inside at required places for fixing of fittings and polyurethane foam (PUF) / Polystyrene foam to be used as filler material throughout the hollow panel, casted monolithically with testing parameters of F.R.P. laminate conforming to table - 3 of IS: 14856, complete including Providing and fixing factory made door frame (single rebate) made out of single piece extruded solid PVC foam profile with homogenous fine cellular structure having smooth outer integral skin having 62 mm width & 32 mm thickness, frame will be mitred & Jointed with self driven self tapping screws of size 38 mm x 4 mm & PVC solvent cement , including fixing the frame to wall with suitable dia & length anchor fastener as per manufacturer’s specification

3.16

27301

8639.74

... More
Providing & fixing false ceiling of Alm anodised T section no 3215 with 2'-0" center to centre,L section no 1705 up to 15 micron on 4 walls to be fixed by means of steel screw and PVC plug and the Alm grid 2'-0"x2'-0" with 12mm Gypsum board

18.6

17326

931.52

... More
Supplying and fixing of wall paneling made of aluminium anodised section framing confirming to standard Aluminium sections as horizontal and vertical members with atleast 600mm c/c and fixing of 9 mm thick BWR block ply and 4mm thick veneer pasting finished with melamine polishing complete

9.6

25231

2628.33

... More
16mm. thick cement plaster in c.m. 1:6 over brick masonry including cost conveyance and royality of materials curing etc. complete

-

-

-

... More
Ground floor (Outside)

100.87

21246

210.63

... More
First Floor (Outside)

90.38

19809

219.18

... More
Finishing wall surface of walls with Acrylic wall putty (Water based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials taxes, labour T & P etc. complete

-

-

-

... More
Ground Floor (Inside)

283.68

20975

73.94

... More
First Floor (Inside)

294.49

22175

75.3

... More
Second Floor (Inside)

34.44

2641

76.71

... More
Wall Priming one coats on new work with wall water bound primer of approved shade

-

-

-

... More
Ground Floor (Inside)

283.68

18470

65.11

... More
First Floor (Inside)

294.49

19607

66.58

... More
Second Floor (Inside)

34.44

2345

68.1

... More
Wall painting two coats with Plastic emulsion paint of approved shade

-

-

-

... More
Ground Floor (Inside)

283.68

26617

93.83

... More
First Floor (Inside)

294.49

28412

96.48

... More
Second Floor (Inside)

34.44

3383

98.25

... More
Wall painting two coats on new work with Weather coat paint of approved shade

-

-

-

... More
Ground Floor (Outside)

151.31

12702

83.95

... More
First Floor (Outside)

135.57

11754

86.71

... More
Second Floor (Outside)

109.46

9809

89.62

... More
Cutting grooves in pucca floors and walls for taking GI/PVC pipes and making good the damagesas per specification complete

2.3

396

172.34

... More
Providing and fixing on wall face Rigid PVC soil, waste and rain water pipes Type B including jointing with adhesive conforming to IS: 5382, leaving 10 mm gap for thermal expansion

-

-

-

... More
110mm OD P.V.C. SWR S/S Pipe (ISI Type B)

5

2503

500.64

... More
75mm OD P.V.C. SWR S/S Pipe (ISI Type B)

2.3

796

346.18

... More
Fixing Rotational moulded polyethylene cylindrical vertical water storage tanks conforming to IS : 12701--1996 including cutting holes through the tank and fixing mild steel tubes and fittings and providing extra sockets and jam nuts, fixing ball valve etc, including hoisting upto a height of 5 metres above ground level and placing the tank to the required position etc all complete

-

-

-

... More
2000 liter capacity Three layer white Cyllindrical vertical water storage tanks (ISI Marked)

1

26625

26625.76

... More
Supply & Fixing of 6Watt circular recessed fitting (Make-Bajaj/Philips /Crompton/ Havells/Wipro/Halonix/Panasonic/PAC/Orient)

20

19500

975

... More
Supply and fixing of Modular switch ,Socket , T.V Socket and Telephone socket etc. (Anchor/Cona/Havess, Great White/Benlo)

-

-

-

... More
6A Modular Switches

80

7520

94

... More
6A Modular Socket

20

2020

101

... More
16A Modular Switches

3

444

148

... More
16A Modular Socket

3

612

204

... More
Replacing old phenolic laminated board with modular board and G.I. box

-

-

-

... More
6 Module

10

3882

388.24

... More
8 Module

6

2590

431.74

... More
12 Module

4

2195

548.96



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.