State Agricultural Marketing Board Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

State Agricultural Marketing Board Tender

Eprocure
Opening Date6 Apr 2021
Closing Date12 Apr 2021
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
C.C (1:3:6) using 40mm size crusher broken granite metal including watering curing with all cost & convayance and royality etc complete.

106.94

-

4245

... More
Flyash Brick masonary in Foundation and plinth in cement mortar (1:6) using the flyash bricks including hoisting to required height placing in position scaffolding, splays cutting, circular moulding, corbelling, chamfering and similar such type of work watering and curing etc. including cost, conveyance, royalty, cess, and taxes of all other materials machineries scaffolding all labour T&P articles required for the work etc. complete in all respect as per the latest specification confirming to relevant IS Specification and direction of the Engineer-in-charge.

44.16

-

4277

... More
R C C M20 using 20mm&10mm crusher broken chips including centering shuttering watering curing with all cost & convayance and royality etc complete but excluding M S ROD etc.

-

-

-

... More
a) Column footing,Base.

6.42

-

4689.4

... More
b) Grade beam/Tie beam/Plinth band.

5.56

-

5042.2

... More
c) Column & Beam (up to 5m. )

11.47

-

10338.1

... More
Providing fixing and placing of Tor steel (HYSD FE-500 Make- (SAIL/ JINDAL/ RINL/ SHYAM/ TISCON) for RCC work in all floors of required diameter of approved quality with straightening bent up or coiled rods" Tor rods" cutting, bending, cracking, hooking, welding or jointing(if required) the "Tor steels rods" & binding wire and tying the grills hoisting laying and placing in proper position as required for RCC works for providing if an hooks including cost, conveyance and taxes of Tor steel and binding wire of 18 to 20 gauge and labour with T & P required for the work etc. complete in all respect in all floors (weight of the binding wire will not be considered for payment) complete.

36.41

-

7155.5

... More
Supplying, fabrication,fitting ,fixing & erection of M.S. angular/Tubular truss, as directed by the Engineer-in-charge .

30

-

10023.3

... More
Supplying, fabrication,fitting ,fixing & erection of M.S. purlin,runner and fender to plinth band (Angular) as directed by the Engineer-in-charge .

2

-

4954.6

... More
Supplying & fitting fixing of H D Bolt size of 60cm long with base plate od (150 x 150 x 6) mm fixing in position in C C (1:2:4) including all cost and materials etc complete.

146.4

-

63.4

... More
Supplying & fitting fixing of precotated Galvanized iron profile sheet semi gloss of 1000mm width & total coated thickness 0.45mm in roof drilling holes in wind ties including fixing of ridges valleys, wind ties with all cost of J/L Hooks/fastner bolts etc. complete as per direction Engineer- In- Charge.

259

-

688.2

... More
Supplying & fitting fixing of M S wind tie over GCI Sheet of size 50mm x 5mm including drilling holes, fixing in position & all costs etc complete.

228

-

56.79

... More
6mm thick cement plaster in C M (1:4) over RCC work including watering curing with all cost & convayance and royality etc complete.

91.2

-

133.9

... More
12 mm thick Cement Plaster (1:6) in ground floor (up to 3mt height) over brick work with curing etc as directed by the Engineer-in-charge.Upto 3 mt height.

78

-

135

... More
16 mm thick Cement Plaster (1:6) in ground floor (up to 3mt height) over brick work with curing etc as directed by the Engineer-in-charge.

88

-

192.6

... More
Providing and lying plain cement concrete of proportion (1:2:4) using approved quality cement , 20 mm.down graded size black hard crusher broken granite stone chips and screened, washed sharp sand for mortar of approved quality and from approved quarry, including hoisting, lowering, laying concrete, ramming, watering and curing etc. complete to required levels laid in layers not exceeding 15 cm. thick in each layer including cost, conveyance, loading, unloading, royalties and taxes of all materials and cost of all labours, cess, sundries, T&P & all other machineries required for the work including shoring, shuttering and dewatering if required including hire & running charges of water pump etc.complete in all respect as per latest specification & direction of the Engineer in charge.

63.2

-

5620.7

... More
Polishing/Painting 2 coats with approved synthetic enamel paint on steel/wood work over one coat of primer to give an even shade including cost of all materials,labourer,sundries,T & P etc complete as directed by the Engineer-in-charge

76.32

-

190.1

... More
Cement punning over floor base including all cost conveyance etc complete.

200

-

31.5

... More
Painting 2 coats with weather coat to exterior walls over one coat of priming on new work including cost of paint as directed by the Engineer-in-charge.Upto 3 mt height. (Ground floor).

169.2

-

153.4

... More
Filling in foundation &plinth with excavated materials including watering & ramming as directed by the Engineer-in charge .(2/3rd rate of respective item )

80.47

-

102.6

... More
Rigid & smooth centering & shuttering for RCC works including false works and dismantalling then after casting including cost of materials in ground floor complete in all respect.

224.63

-

99.82

... More
SINKING OF TUBE WELL Labour for drilling a perfectly vertical bore hole of specified dia for a specified depth below ground level through consolidated and unconsolidated rock with down the hole hammer drilling rigs or combination drilling rigs (650cfm/200psi)as required to suit the site condition with the use of own rigs with its accessories, tools and plant, and consumables etc., for lowering of dia P.V.C./ G.I. pipes for housing, fitted with socket and with or without well screen as per the necessity for soft, medium, hard and boulder formation (G.I./ P.V.C. casing pipes if required to prevent collapse of over burden is to be provided by the contractor including lowering and withdrawing after completion of the tubewell).Drilling of 125mm x 100 mm size vertical bore hole(0.00 mtr. to 60.00 metr and above).

60

-

626.58

... More
Lowering the following size GI/PVC pipes with or without slotted pipes as per the necessity from ground level upto 30 mtrs depth or more and fitted and fixed up in perfectly vertical position, including cutting and threading pipe and slotted pipe and supplying and fixing all jointing materials, tools and plant etc., complete and keeping the top of the casing pipe threaded including plugging tube wells to prevent entry of foreign materials from above.Lowering of 125dia – 0 mtr. To 30 mtr.

30

-

125.47

... More
Cleaning and developing the tubewell using their own compressor continuously worked till clear and adequate discharge is obtained from the tubewell including supply and use of all necessary equipment and labours per the direction of Engineer-in-charge.

1

-

1926

... More
Supplying all labour,tools and plant and fitting and fixing India Mark-II Deep well hand pump with cast Iron Cylinder,12 mm/16mm dia Bright steel connecting rod,32 mm dia G.I pipe of required lengths with supply of extra sockets of approved make,all complete temporarily as per the direction of Engineer- In-Charge.

1

-

860

... More
Construction of cement concrete platform supply of all labour and materials such as sand,cement,chips T&P etc.all complete as approved design and as per direction of Engineer- In-Charge.

1

-

3000

... More
Supplying of all materials,labour,tools and plant and withdrawing casing pipe from the unsuccessful bore.etc complete.With drawing of 125mm dia PVC/GI casing pipe.

30

-

173.7

... More
Supplying all materials and labour,tools and plants and providing sanitary sealing by cement grouting of grannular space around GI/PVC/MS housing pipe uoto 5mtrs below ground level to plug the bore hole excluding cost of cement all complete as per as per the direction of Engineer- In-Charge.Minimum one mtr,of casing pipe to be inserted in the bore in to the rock at the bottom to ensure sanitary sealing.

1

-

1000

... More
Provision for geological sounding survey to acess ground water status before excavation of bore well by aauthorised geologist transportation of geologist with apparatus to conduct geophysical sounding survey including survey including site clearance for approach the vecle.

1

-

4000

... More
Supplying all materials labour T&P for fitting & joining of the following PVC pipe of schedule-80 confirming to ASIM-D-1785 to use as caseing pipe with fitting, cutting, threading to pipe as per the direction of the Engineer – in – charge , cost , conveyance of all materials labours, all taxes etc all complete. 125 mm dia PVC caseing pipe of schedule -80

30

-

778

... More
Cost of ISI marked Indian Mark-II Hand Pump set with 32mm GI riser pipe 24 mtrs and B.S connecting rod-8Nos (L S.)

1

-

14426

... More
BIJMARA , BADAKUTRU PPC

-

-

-

... More
Earth work in excavation of foundation trenches in all kinds of soil including moorum, stony earth and earth mixed with boulders except sheet rock and boulders requiring blasting including dressing of sides and leveling the bed up to the required depth and depositing the excavated materials away from the work site within initial leads and lifts, including shoring, shuttering & dewatering (if required) with cost of labour,cess, hire & running charges of water pumps sundries T & P & all other machineries required for the work etc.complete in all respect as per latest specification & direction of the Engineer in charge.

179.78

-

184.6

... More
Supplying and filling in foundation and plinth with good river sand well watered and rammed in layers not exceeding 23 cm in each layer including all leads and lifts, cost of all materials, labour,cess, sundries, T&P required for the work etc.complete in all respect as per latest specification & direction of the Engineer in charge.

1197.04

-

238.8

... More
C.C (1:3:6) using 40mm size crusher broken granite metal including watering curing with all cost & convayance and royality etc complete.

213.88

-

4248.6

... More
Flyash Brick masonary in Foundation and plinth in cement mortar (1:6) using the flyash bricks including hoisting to required height placing in position scaffolding, splays cutting, circular moulding, corbelling, chamfering and similar such type of work watering and curing etc. including cost, conveyance, royalty, cess, and taxes of all other materials machineries scaffolding all labour T&P articles required for the work etc. complete in all respect as per the latest specification confirming to relevant IS Specification and direction of the Engineer-in-charge.

88.32

-

4288.7

... More
R C C M20 using 20mm&10mm crusher broken chips including centering shuttering watering curing with all cost & convayance and royality etc complete but excluding M S ROD etc.

-

-

-

... More
a) Column footing,Base.

12.84

-

4665.1

... More
b) Grade beam/Tie beam/Plinth band.

11.12

-

5018

... More
c) Column & Beam (up to 5m. )

22.94

-

10313.9

... More
Providing fixing and placing of Tor steel (HYSD FE-500 Make- (SAIL/ JINDAL/ RINL/ SHYAM/ TISCON) for RCC work in all floors of required diameter of approved quality with straightening bent up or coiled rods" Tor rods" cutting, bending, cracking, hooking, welding or jointing(if required) the "Tor steels rods" & binding wire and tying the grills hoisting laying and placing in proper position as required for RCC works for providing if an hooks including cost, conveyance and taxes of Tor steel and binding wire of 18 to 20 gauge and labour with T & P required for the work etc. complete in all respect in all floors (weight of the binding wire will not be considered for payment) complete.

72.82

-

7133.7

... More
Supplying, fabrication,fitting ,fixing & erection of M.S. angular/Tubular truss, as directed by the Engineer-in-charge .

60

-

10023.3

... More
Supplying, fabrication,fitting ,fixing & erection of M.S. purlin,runner and fender to plinth band (Angular) as directed by the Engineer-in-charge .

4

-

4954.6

... More
Supplying & fitting fixing of H D Bolt size of 60cm long with base plate od (150 x 150 x 6) mm fixing in position in C C (1:2:4) including all cost and materials etc complete.

292.8

-

63.4

... More
Supplying & fitting fixing of precotated Galvanized iron profile sheet semi gloss of 1000mm width & total coated thickness 0.45mm in roof drilling holes in wind ties including fixing of ridges valleys, wind ties with all cost of J/L Hooks/fastner bolts etc. complete as per direction Engineer- In- Charge.

518

-

688.2

... More
Supplying & fitting fixing of M S wind tie over GCI Sheet of size 50mm x 5mm including drilling holes, fixing in position & all costs etc complete.

456

-

56.79

... More
6mm thick cement plaster in C M (1:4) over RCC work including watering curing with all cost & convayance and royality etc complete.

182.4

-

133.2

... More
12 mm thick Cement Plaster (1:6) in ground floor (up to 3mt height) over brick work with curing etc as directed by the Engineer-in-charge.Upto 3 mt height.

156

-

134.2

... More
16 mm thick Cement Plaster (1:6) in ground floor (up to 3mt height) over brick work with curing etc as directed by the Engineer-in-charge.

176

-

191.8

... More
Providing and lying plain cement concrete of proportion (1:2:4) using approved quality cement , 20 mm.down graded size black hard crusher broken granite stone chips and screened, washed sharp sand for mortar of approved quality and from approved quarry, including hoisting, lowering, laying concrete, ramming, watering and curing etc. complete to required levels laid in layers not exceeding 15 cm. thick in each layer including cost, conveyance, loading, unloading, royalties and taxes of all materials and cost of all labours, cess, sundries, T&P & all other machineries required for the work including shoring, shuttering and dewatering if required including hire & running charges of water pump etc.complete in all respect as per latest specification & direction of the Engineer in charge.

126.4

-

5601.6

... More
Polishing/Painting 2 coats with approved synthetic enamel paint on steel/wood work over one coat of primer to give an even shade including cost of all materials,labourer,sundries,T & P etc complete as directed by the Engineer-in-charge

152.64

-

190.1

... More
Cement punning over floor base including all cost conveyance etc complete.

400

-

31.3

... More
Painting 2 coats with weather coat to exterior walls over one coat of priming on new work including cost of paint as directed by the Engineer-in-charge.Upto 3 mt height. (Ground floor).

338.4

-

153.4

... More
Filling in foundation &plinth with excavated materials including watering & ramming as directed by the Engineer-in charge .(2/3rd rate of respective item )

160.94

-

102.6

... More
Rigid & smooth centering & shuttering for RCC works including false works and dismantalling then after casting including cost of materials in ground floor complete in all respect.

449.26

-

99.82

... More
SINKING OF TUBE WELL Labour for drilling a perfectly vertical bore hole of specified dia for a specified depth below ground level through consolidated and unconsolidated rock with down the hole hammer drilling rigs or combination drilling rigs (650cfm/200psi)as required to suit the site condition with the use of own rigs with its accessories, tools and plant, and consumables etc., for lowering of dia P.V.C./ G.I. pipes for housing, fitted with socket and with or without well screen as per the necessity for soft, medium, hard and boulder formation (G.I./ P.V.C. casing pipes if required to prevent collapse of over burden is to be provided by the contractor including lowering and withdrawing after completion of the tubewell).Drilling of 125mm x 100 mm size vertical bore hole(0.00 mtr. to 60.00 metr and above).

120

-

626.58

... More
Lowering the following size GI/PVC pipes with or without slotted pipes as per the necessity from ground level upto 30 mtrs depth or more and fitted and fixed up in perfectly vertical position, including cutting and threading pipe and slotted pipe and supplying and fixing all jointing materials, tools and plant etc., complete and keeping the top of the casing pipe threaded including plugging tube wells to prevent entry of foreign materials from above.Lowering of 125dia – 0 mtr. To 30 mtr.

60

-

125.47

... More
Cleaning and developing the tubewell using their own compressor continuously worked till clear and adequate discharge is obtained from the tubewell including supply and use of all necessary equipment and labours per the direction of Engineer-in-charge.

2

-

1926

... More
Supplying all labour,tools and plant and fitting and fixing India Mark-II Deep well hand pump with cast Iron Cylinder,12 mm/16mm dia Bright steel connecting rod,32 mm dia G.I pipe of required lengths with supply of extra sockets of approved make,all complete temporarily as per the direction of Engineer- In-Charge.

2

-

860

... More
Construction of cement concrete platform supply of all labour and materials such as sand,cement,chips T&P etc.all complete as approved design and as per direction of Engineer- In-Charge.

2

-

3000

... More
Supplying of all materials,labour,tools and plant and withdrawing casing pipe from the unsuccessful bore.etc complete.With drawing of 125mm dia PVC/GI casing pipe.

60

-

173.7

... More
Supplying all materials and labour,tools and plants and providing sanitary sealing by cement grouting of grannular space around GI/PVC/MS housing pipe uoto 5mtrs below ground level to plug the bore hole excluding cost of cement all complete as per as per the direction of Engineer- In-Charge.Minimum one mtr,of casing pipe to be inserted in the bore in to the rock at the bottom to ensure sanitary sealing.

2

-

1000

... More
Provision for geological sounding survey to acess ground water status before excavation of bore well by aauthorised geologist transportation of geologist with apparatus to conduct geophysical sounding survey including survey including site clearance for approach the vecle.

2

-

4000

... More
Supplying all materials labour T&P for fitting & joining of the following PVC pipe of schedule-80 confirming to ASIM-D-1785 to use as caseing pipe with fitting, cutting, threading to pipe as per the direction of the Engineer – in – charge , cost , conveyance of all materials labours, all taxes etc all complete. 125 mm dia PVC caseing pipe of schedule -80

60

-

778

... More
Cost of ISI marked Indian Mark-II Hand Pump set with 32mm GI riser pipe 24 mtrs and B.S connecting rod-8Nos (L S.)

2

-

14426

... More
DULKIBANDH PPC

-

-

-

... More
Earth work in excavation of foundation trenches in all kinds of soil including moorum, stony earth and earth mixed with boulders except sheet rock and boulders requiring blasting including dressing of sides and leveling the bed up to the required depth and depositing the excavated materials away from the work site within initial leads and lifts, including shoring, shuttering & dewatering (if required) with cost of labour,cess, hire & running charges of water pumps sundries T & P & all other machineries required for the work etc.complete in all respect as per latest specification & direction of the Engineer in charge.

89.89

-

184.6

... More
Supplying and filling in foundation and plinth with good river sand well watered and rammed in layers not exceeding 23 cm in each layer including all leads and lifts, cost of all materials, labour,cess, sundries, T&P required for the work etc.complete in all respect as per latest specification & direction of the Engineer in charge.

598.52

-

238.8

... More
C.C (1:3:6) using 40mm size crusher broken granite metal including watering curing with all cost & convayance and royality etc complete.

106.94

-

4261.9

... More
Flyash Brick masonary in Foundation and plinth in cement mortar (1:6) using the flyash bricks including hoisting to required height placing in position scaffolding, splays cutting, circular moulding, corbelling, chamfering and similar such type of work watering and curing etc. including cost, conveyance, royalty, cess, and taxes of all other materials machineries scaffolding all labour T&P articles required for the work etc. complete in all respect as per the latest specification confirming to relevant IS Specification and direction of the Engineer-in-charge.

44.16

-

4249.1

... More
R C C M20 using 20mm&10mm crusher broken chips including centering shuttering watering curing with all cost & convayance and royality etc complete but excluding M S ROD etc.

-

-

-

... More
a) Column footing,Base.

6.42

-

4675.4

... More
b) Grade beam/Tie beam/Plinth band.

5.56

-

5028.3

... More
c) Column & Beam (up to 5m. )

11.47

-

10324.2

... More
Providing fixing and placing of Tor steel (HYSD FE-500 Make- (SAIL/ JINDAL/ RINL/ SHYAM/ TISCON) for RCC work in all floors of required diameter of approved quality with straightening bent up or coiled rods" Tor rods" cutting, bending, cracking, hooking, welding or jointing(if required) the "Tor steels rods" & binding wire and tying the grills hoisting laying and placing in proper position as required for RCC works for providing if an hooks including cost, conveyance and taxes of Tor steel and binding wire of 18 to 20 gauge and labour with T & P required for the work etc. complete in all respect in all floors (weight of the binding wire will not be considered for payment) complete.

36.41

-

7132

... More
Supplying, fabrication,fitting ,fixing & erection of M.S. angular/Tubular truss, as directed by the Engineer-in-charge .

30

-

10023.3

... More
Supplying, fabrication,fitting ,fixing & erection of M.S. purlin,runner and fender to plinth band (Angular) as directed by the Engineer-in-charge .

2

-

4954.6

... More
Supplying & fitting fixing of H D Bolt size of 60cm long with base plate od (150 x 150 x 6) mm fixing in position in C C (1:2:4) including all cost and materials etc complete.

146.4

-

63.4

... More
Supplying & fitting fixing of precotated Galvanized iron profile sheet semi gloss of 1000mm width & total coated thickness 0.45mm in roof drilling holes in wind ties including fixing of ridges valleys, wind ties with all cost of J/L Hooks/fastner bolts etc. complete as per direction Engineer- In- Charge.

259

-

688.2

... More
Supplying & fitting fixing of M S wind tie over GCI Sheet of size 50mm x 5mm including drilling holes, fixing in position & all costs etc complete.

228

-

56.79

... More
6mm thick cement plaster in C M (1:4) over RCC work including watering curing with all cost & convayance and royality etc complete.

91.2

-

133.1

... More
12 mm thick Cement Plaster (1:6) in ground floor (up to 3mt height) over brick work with curing etc as directed by the Engineer-in-charge.Upto 3 mt height.

78

-

134.2

... More
16 mm thick Cement Plaster (1:6) in ground floor (up to 3mt height) over brick work with curing etc as directed by the Engineer-in-charge.

88

-

191.7

... More
Providing and lying plain cement concrete of proportion (1:2:4) using approved quality cement , 20 mm.down graded size black hard crusher broken granite stone chips and screened, washed sharp sand for mortar of approved quality and from approved quarry, including hoisting, lowering, laying concrete, ramming, watering and curing etc. complete to required levels laid in layers not exceeding 15 cm. thick in each layer including cost, conveyance, loading, unloading, royalties and taxes of all materials and cost of all labours, cess, sundries, T&P & all other machineries required for the work including shoring, shuttering and dewatering if required including hire & running charges of water pump etc.complete in all respect as per latest specification & direction of the Engineer in charge.

63.2

-

5612.2

... More
Polishing/Painting 2 coats with approved synthetic enamel paint on steel/wood work over one coat of primer to give an even shade including cost of all materials,labourer,sundries,T & P etc complete as directed by the Engineer-in-charge

76.32

-

190.1

... More
Cement punning over floor base including all cost conveyance etc complete.

200

-

31.3

... More
Painting 2 coats with weather coat to exterior walls over one coat of priming on new work including cost of paint as directed by the Engineer-in-charge.Upto 3 mt height. (Ground floor).

169.2

-

153.4

... More
Filling in foundation &plinth with excavated materials including watering & ramming as directed by the Engineer-in charge .(2/3rd rate of respective item )

80.47

-

102.6

... More
Rigid & smooth centering & shuttering for RCC works including false works and dismantalling then after casting including cost of materials in ground floor complete in all respect.

224.63

-

99.82

... More
SINKING OF TUBE WELL Labour for drilling a perfectly vertical bore hole of specified dia for a specified depth below ground level through consolidated and unconsolidated rock with down the hole hammer drilling rigs or combination drilling rigs (650cfm/200psi)as required to suit the site condition with the use of own rigs with its accessories, tools and plant, and consumables etc., for lowering of dia P.V.C./ G.I. pipes for housing, fitted with socket and with or without well screen as per the necessity for soft, medium, hard and boulder formation (G.I./ P.V.C. casing pipes if required to prevent collapse of over burden is to be provided by the contractor including lowering and withdrawing after completion of the tubewell).Drilling of 125mm x 100 mm size vertical bore hole(0.00 mtr. to 60.00 metr and above).

60

-

626.58

... More
Lowering the following size GI/PVC pipes with or without slotted pipes as per the necessity from ground level upto 30 mtrs depth or more and fitted and fixed up in perfectly vertical position, including cutting and threading pipe and slotted pipe and supplying and fixing all jointing materials, tools and plant etc., complete and keeping the top of the casing pipe threaded including plugging tube wells to prevent entry of foreign materials from above.Lowering of 125dia – 0 mtr. To 30 mtr.

30

-

125.47

... More
Cleaning and developing the tubewell using their own compressor continuously worked till clear and adequate discharge is obtained from the tubewell including supply and use of all necessary equipment and labours per the direction of Engineer-in-charge.

1

-

1926

... More
Supplying all labour,tools and plant and fitting and fixing India Mark-II Deep well hand pump with cast Iron Cylinder,12 mm/16mm dia Bright steel connecting rod,32 mm dia G.I pipe of required lengths with supply of extra sockets of approved make,all complete temporarily as per the direction of Engineer- In-Charge.

1

-

860

... More
Construction of cement concrete platform supply of all labour and materials such as sand,cement,chips T&P etc.all complete as approved design and as per direction of Engineer- In-Charge.

1

-

3000

... More
Supplying of all materials,labour,tools and plant and withdrawing casing pipe from the unsuccessful bore.etc complete.With drawing of 125mm dia PVC/GI casing pipe.

30

-

173.7

... More
Supplying all materials and labour,tools and plants and providing sanitary sealing by cement grouting of grannular space around GI/PVC/MS housing pipe uoto 5mtrs below ground level to plug the bore hole excluding cost of cement all complete as per as per the direction of Engineer- In-Charge.Minimum one mtr,of casing pipe to be inserted in the bore in to the rock at the bottom to ensure sanitary sealing.

1

-

1000

... More
Provision for geological sounding survey to acess ground water status before excavation of bore well by aauthorised geologist transportation of geologist with apparatus to conduct geophysical sounding survey including survey including site clearance for approach the vecle.

1

-

4000

... More
Supplying all materials labour T&P for fitting & joining of the following PVC pipe of schedule-80 confirming to ASIM-D-1785 to use as caseing pipe with fitting, cutting, threading to pipe as per the direction of the Engineer – in – charge , cost , conveyance of all materials labours, all taxes etc all complete. 125 mm dia PVC caseing pipe of schedule -80

30

-

778

... More
Cost of ISI marked Indian Mark-II Hand Pump set with 32mm GI riser pipe 24 mtrs and B.S connecting rod-8Nos (L S.)

1

-

14426

... More
MINGUR PPC

-

-

-

... More
Earth work in excavation of foundation trenches in all kinds of soil including moorum, stony earth and earth mixed with boulders except sheet rock and boulders requiring blasting including dressing of sides and leveling the bed up to the required depth and depositing the excavated materials away from the work site within initial leads and lifts, including shoring, shuttering & dewatering (if required) with cost of labour,cess, hire & running charges of water pumps sundries T & P & all other machineries required for the work etc.complete in all respect as per latest specification & direction of the Engineer in charge.

89.89

-

184.6

... More
Supplying and filling in foundation and plinth with good river sand well watered and rammed in layers not exceeding 23 cm in each layer including all leads and lifts, cost of all materials, labour,cess, sundries, T&P required for the work etc.complete in all respect as per latest specification & direction of the Engineer in charge.

598.52

-

238.8

... More
C.C (1:3:6) using 40mm size crusher broken granite metal including watering curing with all cost & convayance and royality etc complete.

106.94

-

4398.6

... More
Flyash Brick masonary in Foundation and plinth in cement mortar (1:6) using the flyash bricks including hoisting to required height placing in position scaffolding, splays cutting, circular moulding, corbelling, chamfering and similar such type of work watering and curing etc. including cost, conveyance, royalty, cess, and taxes of all other materials machineries scaffolding all labour T&P articles required for the work etc. complete in all respect as per the latest specification confirming to relevant IS Specification and direction of the Engineer-in-charge.

44.16

-

4181

... More
R C C M20 using 20mm&10mm crusher broken chips including centering shuttering watering curing with all cost & convayance and royality etc complete but excluding M S ROD etc.

-

-

-

... More
a) Column footing,Base.

6.42

-

4833.3

... More
b) Grade beam/Tie beam/Plinth band.

5.56

-

5186.1

... More
c) Column & Beam (up to 5m. )

11.47

-

10482.1

... More
Providing fixing and placing of Tor steel (HYSD FE-500 Make- (SAIL/ JINDAL/ RINL/ SHYAM/ TISCON) for RCC work in all floors of required diameter of approved quality with straightening bent up or coiled rods" Tor rods" cutting, bending, cracking, hooking, welding or jointing(if required) the "Tor steels rods" & binding wire and tying the grills hoisting laying and placing in proper position as required for RCC works for providing if an hooks including cost, conveyance and taxes of Tor steel and binding wire of 18 to 20 gauge and labour with T & P required for the work etc. complete in all respect in all floors (weight of the binding wire will not be considered for payment) complete.

36.41

-

7155.5

... More
Supplying, fabrication,fitting ,fixing & erection of M.S. angular/Tubular truss, as directed by the Engineer-in-charge .

30

-

10023.3

... More
Supplying, fabrication,fitting ,fixing & erection of M.S. purlin,runner and fender to plinth band (Angular) as directed by the Engineer-in-charge .

2

-

4954.6

... More
Supplying & fitting fixing of H D Bolt size of 60cm long with base plate od (150 x 150 x 6) mm fixing in position in C C (1:2:4) including all cost and materials etc complete.

146.4

-

63.4

... More
Supplying & fitting fixing of precotated Galvanized iron profile sheet semi gloss of 1000mm width & total coated thickness 0.45mm in roof drilling holes in wind ties including fixing of ridges valleys, wind ties with all cost of J/L Hooks/fastner bolts etc. complete as per direction Engineer- In- Charge.

259

-

688.2

... More
Supplying & fitting fixing of M S wind tie over GCI Sheet of size 50mm x 5mm including drilling holes, fixing in position & all costs etc complete.

228

-

56.79

... More
6mm thick cement plaster in C M (1:4) over RCC work including watering curing with all cost & convayance and royality etc complete.

91.2

-

133.9

... More
12 mm thick Cement Plaster (1:6) in ground floor (up to 3mt height) over brick work with curing etc as directed by the Engineer-in-charge.Upto 3 mt height.

78

-

135

... More
16 mm thick Cement Plaster (1:6) in ground floor (up to 3mt height) over brick work with curing etc as directed by the Engineer-in-charge.

88

-

192.6

... More
Providing and lying plain cement concrete of proportion (1:2:4) using approved quality cement , 20 mm.down graded size black hard crusher broken granite stone chips and screened, washed sharp sand for mortar of approved quality and from approved quarry, including hoisting, lowering, laying concrete, ramming, watering and curing etc. complete to required levels laid in layers not exceeding 15 cm. thick in each layer including cost, conveyance, loading, unloading, royalties and taxes of all materials and cost of all labours, cess, sundries, T&P & all other machineries required for the work including shoring, shuttering and dewatering if required including hire & running charges of water pump etc.complete in all respect as per latest specification & direction of the Engineer in charge.

63.2

-

5764.7

... More
Polishing/Painting 2 coats with approved synthetic enamel paint on steel/wood work over one coat of primer to give an even shade including cost of all materials,labourer,sundries,T & P etc complete as directed by the Engineer-in-charge

76.32

-

190.1

... More
Cement punning over floor base including all cost conveyance etc complete.

200

-

31.5

... More
Painting 2 coats with weather coat to exterior walls over one coat of priming on new work including cost of paint as directed by the Engineer-in-charge.Upto 3 mt height. (Ground floor).

169.2

-

153.4

... More
Filling in foundation &plinth with excavated materials including watering & ramming as directed by the Engineer-in charge .(2/3rd rate of respective item )

80.47

-

102.6

... More
Rigid & smooth centering & shuttering for RCC works including false works and dismantalling then after casting including cost of materials in ground floor complete in all respect.

224.63

-

99.82

... More
SINKING OF TUBE WELL Labour for drilling a perfectly vertical bore hole of specified dia for a specified depth below ground level through consolidated and unconsolidated rock with down the hole hammer drilling rigs or combination drilling rigs (650cfm/200psi)as required to suit the site condition with the use of own rigs with its accessories, tools and plant, and consumables etc., for lowering of dia P.V.C./ G.I. pipes for housing, fitted with socket and with or without well screen as per the necessity for soft, medium, hard and boulder formation (G.I./ P.V.C. casing pipes if required to prevent collapse of over burden is to be provided by the contractor including lowering and withdrawing after completion of the tubewell).Drilling of 125mm x 100 mm size vertical bore hole(0.00 mtr. to 60.00 metr and above).

60

-

626.58

... More
Lowering the following size GI/PVC pipes with or without slotted pipes as per the necessity from ground level upto 30 mtrs depth or more and fitted and fixed up in perfectly vertical position, including cutting and threading pipe and slotted pipe and supplying and fixing all jointing materials, tools and plant etc., complete and keeping the top of the casing pipe threaded including plugging tube wells to prevent entry of foreign materials from above.Lowering of 125dia – 0 mtr. To 30 mtr.

30

-

125.47

... More
Cleaning and developing the tubewell using their own compressor continuously worked till clear and adequate discharge is obtained from the tubewell including supply and use of all necessary equipment and labours per the direction of Engineer-in-charge.

1

-

1926

... More
Supplying all labour,tools and plant and fitting and fixing India Mark-II Deep well hand pump with cast Iron Cylinder,12 mm/16mm dia Bright steel connecting rod,32 mm dia G.I pipe of required lengths with supply of extra sockets of approved make,all complete temporarily as per the direction of Engineer- In-Charge.

1

-

860

... More
Construction of cement concrete platform supply of all labour and materials such as sand,cement,chips T&P etc.all complete as approved design and as per direction of Engineer- In-Charge.

1

-

3000

... More
Supplying of all materials,labour,tools and plant and withdrawing casing pipe from the unsuccessful bore.etc complete.With drawing of 125mm dia PVC/GI casing pipe.

30

-

173.7

... More
Supplying all materials and labour,tools and plants and providing sanitary sealing by cement grouting of grannular space around GI/PVC/MS housing pipe uoto 5mtrs below ground level to plug the bore hole excluding cost of cement all complete as per as per the direction of Engineer- In-Charge.Minimum one mtr,of casing pipe to be inserted in the bore in to the rock at the bottom to ensure sanitary sealing.

1

-

1000

... More
Provision for geological sounding survey to acess ground water status before excavation of bore well by aauthorised geologist transportation of geologist with apparatus to conduct geophysical sounding survey including survey including site clearance for approach the vecle.

1

-

4000

... More
Supplying all materials labour T&P for fitting & joining of the following PVC pipe of schedule-80 confirming to ASIM-D-1785 to use as caseing pipe with fitting, cutting, threading to pipe as per the direction of the Engineer – in – charge , cost , conveyance of all materials labours, all taxes etc all complete. 125 mm dia PVC caseing pipe of schedule -80

30

-

778

... More
Cost of ISI marked Indian Mark-II Hand Pump set with 32mm GI riser pipe 24 mtrs and B.S connecting rod-8Nos (L S.)

1

-

14426

... More
ICHHAPUR PPC

-

-

-

... More
Earth work in excavation of foundation trenches in all kinds of soil including moorum, stony earth and earth mixed with boulders except sheet rock and boulders requiring blasting including dressing of sides and leveling the bed up to the required depth and depositing the excavated materials away from the work site within initial leads and lifts, including shoring, shuttering & dewatering (if required) with cost of labour,cess, hire & running charges of water pumps sundries T & P & all other machineries required for the work etc.complete in all respect as per latest specification & direction of the Engineer in charge.

89.89

-

184.6

... More
Supplying and filling in foundation and plinth with good river sand well watered and rammed in layers not exceeding 23 cm in each layer including all leads and lifts, cost of all materials, labour,cess, sundries, T&P required for the work etc.complete in all respect as per latest specification & direction of the Engineer in charge.

598.52

-

238.8

... More
C.C (1:3:6) using 40mm size crusher broken granite metal including watering curing with all cost & convayance and royality etc complete.

106.94

-

4270.6

... More
Flyash Brick masonary in Foundation and plinth in cement mortar (1:6) using the flyash bricks including hoisting to required height placing in position scaffolding, splays cutting, circular moulding, corbelling, chamfering and similar such type of work watering and curing etc. including cost, conveyance, royalty, cess, and taxes of all other materials machineries scaffolding all labour T&P articles required for the work etc. complete in all respect as per the latest specification confirming to relevant IS Specification and direction of the Engineer-in-charge.

44.16

-

4277

... More
R C C M20 using 20mm&10mm crusher broken chips including centering shuttering watering curing with all cost & convayance and royality etc complete but excluding M S ROD etc.

-

-

-

... More
a) Column footing,Base.

6.42

-

4713.3

... More
b) Grade beam/Tie beam/Plinth band.

5.56

-

5066.1

... More
c) Column & Beam (up to 5m. )

11.47

-

10362.1

... More
Providing fixing and placing of Tor steel (HYSD FE-500 Make- (SAIL/ JINDAL/ RINL/ SHYAM/ TISCON) for RCC work in all floors of required diameter of approved quality with straightening bent up or coiled rods" Tor rods" cutting, bending, cracking, hooking, welding or jointing(if required) the "Tor steels rods" & binding wire and tying the grills hoisting laying and placing in proper position as required for RCC works for providing if an hooks including cost, conveyance and taxes of Tor steel and binding wire of 18 to 20 gauge and labour with T & P required for the work etc. complete in all respect in all floors (weight of the binding wire will not be considered for payment) complete.

36.41

-

7155.5

... More
Supplying, fabrication,fitting ,fixing & erection of M.S. angular/Tubular truss, as directed by the Engineer-in-charge .

30

-

10023.3

... More
Supplying, fabrication,fitting ,fixing & erection of M.S. purlin,runner and fender to plinth band (Angular) as directed by the Engineer-in-charge .

2

-

4954.6

... More
Supplying & fitting fixing of H D Bolt size of 60cm long with base plate od (150 x 150 x 6) mm fixing in position in C C (1:2:4) including all cost and materials etc complete.

146.4

-

63.4

... More
Supplying & fitting fixing of precotated Galvanized iron profile sheet semi gloss of 1000mm width & total coated thickness 0.45mm in roof drilling holes in wind ties including fixing of ridges valleys, wind ties with all cost of J/L Hooks/fastner bolts etc. complete as per direction Engineer- In- Charge.

259

-

688.2

... More
Supplying & fitting fixing of M S wind tie over GCI Sheet of size 50mm x 5mm including drilling holes, fixing in position & all costs etc complete.

228

-

56.79

... More
6mm thick cement plaster in C M (1:4) over RCC work including watering curing with all cost & convayance and royality etc complete.

91.2

-

133.9

... More
12 mm thick Cement Plaster (1:6) in ground floor (up to 3mt height) over brick work with curing etc as directed by the Engineer-in-charge.Upto 3 mt height.

78

-

135

... More
16 mm thick Cement Plaster (1:6) in ground floor (up to 3mt height) over brick work with curing etc as directed by the Engineer-in-charge.

88

-

192.6

... More
Providing and lying plain cement concrete of proportion (1:2:4) using approved quality cement , 20 mm.down graded size black hard crusher broken granite stone chips and screened, washed sharp sand for mortar of approved quality and from approved quarry, including hoisting, lowering, laying concrete, ramming, watering and curing etc. complete to required levels laid in layers not exceeding 15 cm. thick in each layer including cost, conveyance, loading, unloading, royalties and taxes of all materials and cost of all labours, cess, sundries, T&P & all other machineries required for the work including shoring, shuttering and dewatering if required including hire & running charges of water pump etc.complete in all respect as per latest specification & direction of the Engineer in charge.

63.2

-

5644.7

... More
Polishing/Painting 2 coats with approved synthetic enamel paint on steel/wood work over one coat of primer to give an even shade including cost of all materials,labourer,sundries,T & P etc complete as directed by the Engineer-in-charge

76.32

-

190.1

... More
Cement punning over floor base including all cost conveyance etc complete.

200

-

31.5

... More
Painting 2 coats with weather coat to exterior walls over one coat of priming on new work including cost of paint as directed by the Engineer-in-charge.Upto 3 mt height. (Ground floor).

169.2

-

153.4

... More
Filling in foundation &plinth with excavated materials including watering & ramming as directed by the Engineer-in charge .(2/3rd rate of respective item )

80.47

-

102.6

... More
Rigid & smooth centering & shuttering for RCC works including false works and dismantalling then after casting including cost of materials in ground floor complete in all respect.

224.63

-

99.82

... More
SINKING OF TUBE WELL Labour for drilling a perfectly vertical bore hole of specified dia for a specified depth below ground level through consolidated and unconsolidated rock with down the hole hammer drilling rigs or combination drilling rigs (650cfm/200psi)as required to suit the site condition with the use of own rigs with its accessories, tools and plant, and consumables etc., for lowering of dia P.V.C./ G.I. pipes for housing, fitted with socket and with or without well screen as per the necessity for soft, medium, hard and boulder formation (G.I./ P.V.C. casing pipes if required to prevent collapse of over burden is to be provided by the contractor including lowering and withdrawing after completion of the tubewell).Drilling of 125mm x 100 mm size vertical bore hole(0.00 mtr. to 60.00 metr and above).

60

-

626.58

... More
Lowering the following size GI/PVC pipes with or without slotted pipes as per the necessity from ground level upto 30 mtrs depth or more and fitted and fixed up in perfectly vertical position, including cutting and threading pipe and slotted pipe and supplying and fixing all jointing materials, tools and plant etc., complete and keeping the top of the casing pipe threaded including plugging tube wells to prevent entry of foreign materials from above.Lowering of 125dia – 0 mtr. To 30 mtr.

30

-

125.47

... More
Cleaning and developing the tubewell using their own compressor continuously worked till clear and adequate discharge is obtained from the tubewell including supply and use of all necessary equipment and labours per the direction of Engineer-in-charge.

1

-

1926

... More
Supplying all labour,tools and plant and fitting and fixing India Mark-II Deep well hand pump with cast Iron Cylinder,12 mm/16mm dia Bright steel connecting rod,32 mm dia G.I pipe of required lengths with supply of extra sockets of approved make,all complete temporarily as per the direction of Engineer- In-Charge.

1

-

860

... More
Construction of cement concrete platform supply of all labour and materials such as sand,cement,chips T&P etc.all complete as approved design and as per direction of Engineer- In-Charge.

1

-

3000

... More
Supplying of all materials,labour,tools and plant and withdrawing casing pipe from the unsuccessful bore.etc complete.With drawing of 125mm dia PVC/GI casing pipe.

30

-

173.7

... More
Supplying all materials and labour,tools and plants and providing sanitary sealing by cement grouting of grannular space around GI/PVC/MS housing pipe uoto 5mtrs below ground level to plug the bore hole excluding cost of cement all complete as per as per the direction of Engineer- In-Charge.Minimum one mtr,of casing pipe to be inserted in the bore in to the rock at the bottom to ensure sanitary sealing.

1

-

1000

... More
Provision for geological sounding survey to acess ground water status before excavation of bore well by aauthorised geologist transportation of geologist with apparatus to conduct geophysical sounding survey including survey including site clearance for approach the vecle.

1

-

4000

... More
Supplying all materials labour T&P for fitting & joining of the following PVC pipe of schedule-80 confirming to ASIM-D-1785 to use as caseing pipe with fitting, cutting, threading to pipe as per the direction of the Engineer – in – charge , cost , conveyance of all materials labours, all taxes etc all complete. 125 mm dia PVC caseing pipe of schedule -80

30

-

778

... More
Cost of ISI marked Indian Mark-II Hand Pump set with 32mm GI riser pipe 24 mtrs and B.S connecting rod-8Nos (L S.)

1

-

14426



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.