National Highways And Infrastructure Development Corporation Limited Tender
View complete overview of Nagaland NHIDCL Tender
Costs
EMD
₹ 2,00,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
NHIDCL/Nagaland/ C-Z (50.00 to 115.534)/AE/2018
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2018_NHIDC_345899_1Bid Award Id
ViewTender No
NHIDCL/Nagaland/ C-Z (50.00 to 115.534)/AE/2018Tender Authority
National Highways And Infrastructure Development Corporation Limited ViewPurchaser Address
-Website
http://https://nhidcl.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Sr. Contract Specialist (1 No)
16
-
-
... More
Senior Quantity Surveyor (1 No)
40
-
-
... More
Bridge/Structural Engineer (1 No)
36
-
-
... More
Material Engineer (1 No)
40
-
-
... More
Bridge Design Specialist (1 No)
4
-
-
... More
Highway Design Specialist (1 No)
4
-
-
... More
Sub-Professional Staff
-
-
-
... More
Quantity Surveyor (3 No) (1 no each for Package-I,II,III)
126
-
-
... More
Survey Engineer (3 No) (1 no each for Package-I,II,III)
126
-
-
... More
Lab Technician (3 No) (1 no each for Package-I,II,III)
126
-
-
... More
Support Staff (inclusive of per diem allowance)
-
-
-
... More
Office Manager (2 nos for three packages during Construction period and only 1no for three packages druing Maintenance Period)
120
-
-
... More
Accountant Cum Cashier (2 nos for three packages during Construction period and only 1no for three packages druing Maintenance Period)
120
-
-
... More
Photocopy machine Operator (2 nos for three packages during Construction period and only 1no for three packages druing Maintenance Period)
120
-
-
... More
Computer operator cum steno (2 nos for three packages during Construction period and only 1no for three packages druing Maintenance Period)
120
-
-
... More
Office Boy (3 nos for three packages during Construction period and only 1no for three packages druing Maintenance Period)
156
-
-
... More
Transportation (Fixed Costs)
-
-
-
... More
Scorpio or equivalent 4x4 vehicle (not more than 3 years old) (3 nos during Construction Period and 1 nos during Maintenance Period.)
156
-
-
... More
Car- Indica or equivalent (not more than 3 years old) (nill during Construction Period and 1 nos during Maintenance Period.)
48
-
-
... More
Duty Travel to Site(Fixed Costs): Professional and Sub-Professional Staff. The employer may require the key personnel to visit the Employer's Site Offices/Regional Office. The quoted amount against remuneration should include travel fare for 20 round trip to Employer's Head Office and 20 round trip to Employer's regional office. (including Hotel Charges,travel costs etc. complete)
1
-
-
... More
Office Rent (Fixed Costs) The rent cost includes electricity and water charges, maintenance, cleaning, repairs, etc.
-
-
-
... More
Construction Period(min. 400sqm area)
36
-
-
... More
Office for 1 No’s Resident Engineer of min.150sqm area for Package- III during Construction Period
36
-
-
... More
Defect Liability Period (min. 150sqm area)
48
-
-
... More
Office Supplies, Utilities and Communication (Fixed Costs)
-
-
-
... More
Office Supplies
84
-
-
... More
Drafting Supplies
84
-
-
... More
Computer Running Costs
84
-
-
... More
Domestic and International Communication
84
-
-
... More
Office Furniture and Equipment (Rental)
-
-
-
... More
Executive Table (Godrej make, model No.T-108orequivalent) (7 Nos)
300
-
-
... More
Executive Chairs(Godrej make, model No.PCH-701orequivalent) (7 Nos)
300
-
-
... More
Tables(Godrej make, model No.T-104 or equivalent) (9 Nos)
378
-
-
... More
Ordinary Chairs Type-1(Godrej make,Model NoT-CHR–6 or equivalent) (9 Nos)
378
-
-
... More
Tables(for all other staff)(Godrej make,modelNo.T-101orequivalent) (10 Nos)
600
-
-
... More
Ordinary Chairs–Type II (for all other staff) (Godrej make,modelNo.CHR-6 or equivalent (10 Nos)
600
-
-
... More
Steel Almirah 1270mmx765mmx440mm(Godrej make, model minor plain or equivalent) (7 Nos)
300
-
-
... More
Visitors chairs/Conference room chairs (Godrej make, model No. DCH7004 or equivalent) (7 Nos)
336
-
-
... More
Tables for computers with 3 drawers, keyboard/mouse pull out trays size 1664mmx 900(Godrej make. Or equivalent as per Engineer’s design) (20 Nos)
1062
-
-
... More
Printer desks(Godrej make or equivalent) (3 Nos)
120
-
-
... More
Side tables (Godrej make or equivalent) (4 Nos)
156
-
-
... More
Conference Table(Godrej make, model No.T-12 or equivalent) (1 No)
48
-
-
... More
Revolving Chairs for Computer Room/Drawing room (3 Nos)
156
-
-
... More
Telephone with Broad Band connection (2 Nos)
120
-
-
... More
Photocopier (2 No)
120
-
-
... More
Air-Conditioner(1.5Ton) (3 Nos)
156
-
-
... More
Computer PC (state of the art) (20 Nos)
1062
-
-
... More
LaserJet Printers (2 Nos)
120
-
-
... More
Diesel Generator (20KVA)with running Cost (2 No)
120
-
-
... More
Binding Machine (2 No)
120
-
-
... More
Air Cooler(of 24” size fan with suitable Pump and shall be of either GEC, Katina or Cool Home make or equivalent) (3 Nos)
156
-
-
... More
Water Coolers (Voltas or equivalent) (2 No)
120
-
-
... More
Software
1
-
-
... More
Rental cost towards Survey Equipment(GPS/Total station /Auto Level/LIDAR) with semiskilled survey Party (4 persons) and one dedicated vehicle for Survey Party (inclusive of vehicle rental driver’s salary, fuel operationand maintenance etc complete) with rods, flags and other sundries
36
-
-
... More
Contigencies
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements