Ministry Of Road Transport And Highways Tender

View complete overview of Nagaland MORTH Tender

Ministry Of Road Transport And Highways - MORTH Tender

Works
Civil And Construction
Bridge Construction
Eprocure
Opening Date28 Aug 2024
Closing Date18 Sep 2024
Tender Amount₹ 3,58,21,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Wingwall u/s & d/s

360

-

-

... More
Random Rubble Masonry: Stone Masonry Work in Cement Mortar 1:3 in Foundation complete as per drawing and specifications. (Soling)

-

-

-

... More
Abutment

18.74

-

-

... More
Wing wall u/s & d/s

21.61

-

-

... More
Approach Slab

4.95

-

-

... More
PCC 1:3:6 in Foundation: Plain Cement Concrete 1:3:6 nominal mixed in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curring for 14 days.

-

-

-

... More
Abutment

30.1

-

-

... More
Wing wall u/s & d/s

27.3

-

-

... More
Approach Slab

4.56

-

-

... More
RCC Grade M25 using batching plant and manual placing: Plain/Reinforced cement concrete, in open foundation complete as per drawing and technical specification.

-

-

-

... More
Abutment

133.92

-

-

... More
Wing wall u/s & d/s

111.15

-

-

... More
Supply, fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing & Technical specifications.

-

-

-

... More
Abutment

2.47

-

-

... More
Abutment

4.34

-

-

... More
Wing wall

8.88

-

-

... More
Wing wall

10.39

-

-

... More
Total

26.08

-

-

... More
Add 5% wastage and lap joint

1.3

-

-

... More
Sub-structure

-

-

-

... More
PCC 1:3:6 in Foundation: Plain Cement Concrete 1:3:6 nominal mixed in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curring for 14 days.

-

-

-

... More
Parapet on Approach slab

2.3

-

-

... More
RCC Grade M20: Plain/Reinforced cement concrete in substructure complete as per drawing & technical specification. RCC M30 grade using batching plant transit mixer and concrete pump height upto 5m to 10m.

-

-

-

... More
Abutment Left & right

189.72

-

-

... More
Wing wall u/s & d/s

218.88

-

-

... More
Dirt wall

2.05

-

-

... More
Abutment cap

5.58

-

-

... More
Supply, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing & specifications.

-

-

-

... More
Abutment

5.4

-

-

... More
Abutment

3.45

-

-

... More
Abutment

6.32

-

-

... More
Abutment cap

2.21

-

-

... More
Abutment cap

1.92

-

-

... More
Dirt wall

2.84

-

-

... More
Wing wall

4.82

-

-

... More
Wing wall

5.92

-

-

... More
Wing wall

4.97

-

-

... More
Add 5% wastage and lap joint

1.89

-

-

... More
Providing weep holes in brick masonry / plain / reinforced concrete abutment wing wall/ return wall with 100mm dia AC pipe. Extending through the full width of the structure withslope of 1V:20H towards drawing force. Complete as per drawing and technical specification.

-

-

-

... More
Abutment

56

-

-

... More
Wing wall

176

-

-

... More
Back filling behind Abutment, wing wall and return wall complete as per drawing and technical specification: A - Granular material.

-

-

-

... More
Abutment

130.2

-

-

... More
Superstructure

-

-

-

... More
Furnishing and placing Reinforced cement concrete in superstructure as per drawing and technical specification. Height 5m to 10m: RCC M20 Grade.

-

-

-

... More
Approach Slab

9.3

-

-

... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing & Technical specifications.

-

-

-

... More
Approach Slab

1.56

-

-

... More
Formwork

-

-

-

... More
Centering and Shuttering including strutting, Propping etc. and removal of form using steel sections: Columns, pillars, piers, abutments, posts & struts.

-

-

-

... More
Abutment footings

57.6

-

-

... More
Abutment footings

49.6

-

-

... More
Abutment Shaft (including Abutment cap)

223.2

-

-

... More
Abutment Shaft (including Abutment cap)

72

-

-

... More
Wing wall footing

78

-

-

... More
Wing wall footing

36

-

-

... More
Wing wall Stem

288

-

-

... More
Wing wall Stem

72.96

-

-

... More
Approach Slab

4.5

-

-

... More
Approach Slab

9.3

-

-

... More
Extra for additional height in centering, shuttering where ever required with adequate bracing, propping etc. including cost of de-shuttering and decentering at all levels, over a height of 3.5m, for every additional height of 1 metre or part thereof (Plan area to be measured).

891.16

-

-

... More
River Training & Protection Works

-

-

-

... More
Providing and laying flooring complete as per drawing and Technical specification laid over cement concrete bedding. A- Rubble stone laid in cement mortar 1:3.

-

-

-

... More
River bed

34.45

-

-

... More
Granular Sub-base with graded material: (Construction of granular sub-base by providing granular material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory power roller to achieve the desired density, complete as per clause 401)

-

-

-

... More
Grading - II

168.75

-

-

... More
Surface Drains in Ordinary Rock: (Construction of unlined surface drain of average cross sectional area 0.4 sqm in ordinary rock to specified lines, grades, levels and dimensions to the requirement of clause 301 to 309. Excavated material to be used in embankment within a lead of 1000m),

-

-

-

... More
By Mechanical means.

300

-

-

... More
Supply of 25m long DS Standard width Bailey Bridge loading class 40R from the manufacturer to Dimapur. Incl. launching & erection, carriage to Bridge location.

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.