Opening Date25 Apr 2025
Closing Date22 May 2025
Tender Amount₹ 7,28,59,000 
Notes
Download

AI Insights

Technical Capacity
... View More
The required prior work experience for the bidder includes having successfully completed and commissioned Solar Power Plants with specific capacity requirements. The experience should be in Government Department/PSU during the last seven years, with the following requirements: - One work of capacity not less than 80% of capacity, i.e., 60 KW - Or, two works of capacity not less than 50% of capacity, i.e., 37.50 KW - Or, three works of capacity not less than 40% of capacity, i.e., 30 KW For bidders one class below the eligible class, they must have previously completed similar works satisfactorily. The criteria for upgradation include past experience of completed works and financial soundness. However, no specific percentage of similar works completed is mentioned. A value range of Rs. 2 lakhs to Rs. 7.5 lakhs is mentioned for works, and a retention amount of 1% of the contract amount is also mentioned. The capacity percentages mentioned are 80%, 50%, and 40%, with corresponding values of 60 KW, 37.50 KW, and 30 KW, respectively.

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Design, Supply, Installation, Testing and commissioning including comprehensive maint for 5 years of Roof Top Solar Power Generation Plant of capacity 30 Kw (Minimum 36 KWp) (AC) at output Voltage 415 Volt, 50Hz, on grid connected complete with structure and foundation comprises Design and construction of foundation, civil supporting structure, modules, inverters, DC junction, Distribution & combiner boxes, AC junction & combiner boxes, lighting arrester, weather station, SCADA system, earthing, connecting wires / cables with all accessories required for SPV complete all as per MNRE/SECI specifications and technical specifications complete all as specified and directed. Note: Contractor shall also ensure the following:- (i) Annual maintenance contract for 5 Years complete all as specified and directed. (ii) Arrangement of all required work, access permissions shall be made available to work force of the contractor by the GE through Security Officer. (iii) Repairing of all installation if required will be carried out on site or at service centre. Quoted rates shall be inclusive and includes for required spares, services, labour, handling and transportation charges etc.. (iv) The Engineer/Electrician shall submit reports in soft copy format as required by the Engineer in Charge. (v) Security of all SPV equipment’s shall be complete responsibilities of Station Authorities.

4

-

-

... More
Design, Supply, Installation, Testing and commissioning including comprehensive maint for 5 years of Roof Top Solar Power Generation Plant of capacity 35 Kw (Minimum 46 KWp) (AC) at output Voltage 415 Volt, 50Hz, on grid connected complete with structure and foundation comprises Design and construction of foundation, civil supporting structure, modules, inverters, DC junction, Distribution & combiner boxes, AC junction & combiner boxes, lighting arrester, weather station, SCADA system, earthing, connecting wires / cables with all accessories required for SPV complete all as per MNRE/SECI specifications and technical specifications complete all as specified and directed. Note: Contractor shall also ensure the following:- (i) Annual maintenance contract for 5 Years complete all as specified and directed. (ii) Arrangement of all required work, access permissions shall be made available to work force of the contractor by the GE through Security Officer. (iii) Repairing of all installation if required will be carried out on site or at service centre. Quoted rates shall be inclusive and includes for required spares, services, labour, handling and transportation charges etc.. (iv) The Engineer/Electrician shall submit reports in soft copy format as required by the Engineer in Charge. (v) Security of all SPV equipment’s shall be complete responsibilities of Station Authorities.

2

-

-

... More
Design, Supply, Installation, Testing and commissioning including comprehensive maint for 5 years of Roof Top Solar Power Generation Plant of capacity 40 Kw (Minimum 48 KWp) (AC) at output Voltage 415 Volt, 50Hz, on grid connected complete with structure and foundation comprises Design and construction of foundation, civil supporting structure, modules, inverters, DC junction, Distribution & combiner boxes, AC junction & combiner boxes, lighting arrester, weather station, SCADA system, earthing, connecting wires / cables with all accessories required for SPV complete all as per MNRE/SECI specifications and technical specifications complete all as specified and directed. Note: Contractor shall also ensure the following:- (i) Annual maintenance contract for 5 Years complete all as specified and directed. (ii) Arrangement of all required work, access permissions shall be made available to work force of the contractor by the GE through Security Officer. (iii) Repairing of all installation if required will be carried out on site or at service centre. Quoted rates shall be inclusive and includes for required spares, services, labour, handling and transportation charges etc.. (iv) The Engineer/Electrician shall submit reports in soft copy format as required by the Engineer in Charge. (v) Security of all SPV equipment’s shall be complete responsibilities of Station Authorities.

5

-

-

... More
Design, Supply, Installation, Testing and commissioning including comprehensive maint for 5 years of Roof Top Solar Power Generation Plant of capacity 45 Kw (Minimum 54 KWp) (AC) at output Voltage 415 Volt, 50Hz, on grid connected complete with structure and foundation comprises Design and construction of foundation, civil supporting structure, modules, inverters, DC junction, Distribution & combiner boxes, AC junction & combiner boxes, lighting arrester, weather station, SCADA system, earthing, connecting wires / cables with all accessories required for SPV complete all as per MNRE/SECI specifications and technical specifications complete all as specified and directed. Note: Contractor shall also ensure the following:- (i) Annual maintenance contract for 5 Years complete all as specified and directed. (ii) Arrangement of all required work, access permissions shall be made available to work force of the contractor by the GE through Security Officer. (iii) Repairing of all installation if required will be carried out on site or at service centre. Quoted rates shall be inclusive and includes for required spares, services, labour, handling and transportation charges etc.. (iv) The Engineer/Electrician shall submit reports in soft copy format as required by the Engineer in Charge. (v) Security of all SPV equipment’s shall be complete responsibilities of Station Authorities.

2

-

-

... More
Design, Supply, Installation, Testing and commissioning including comprehensive maint for 5 years of Roof Top Solar Power Generation Plant of capacity 50 Kw (Minimum 60 KWp) (AC) at output Voltage 415 Volt, 50Hz, on grid connected complete with structure and foundation comprises Design and construction of foundation, civil supporting structure, modules, inverters, DC junction, Distribution & combiner boxes, AC junction & combiner boxes, lighting arrester, weather station, SCADA system, earthing, connecting wires / cables with all accessories required for SPV complete all as per MNRE/SECI specifications and technical specifications complete all as specified and directed. Note: Contractor shall also ensure the following:- (i) Annual maintenance contract for 5 Years complete all as specified and directed. (ii) Arrangement of all required work, access permissions shall be made available to work force of the contractor by the GE through Security Officer. (iii) Repairing of all installation if required will be carried out on site or at service centre. Quoted rates shall be inclusive and includes for required spares, services, labour, handling and transportation charges etc.. (iv) The Engineer/Electrician shall submit reports in soft copy format as required by the Engineer in Charge. (v) Security of all SPV equipment’s shall be complete responsibilities of Station Authorities.

1

-

-

... More
Design, Supply, Installation, Testing and commissioning including comprehensive maint for 5 years of Roof Top Solar Power Generation Plant of capacity 70 Kw (Minimum 84 KWp) (AC) at output Voltage 415 Volt, 50Hz, on grid connected complete with structure and foundation comprises Design and construction of foundation, civil supporting structure, modules, inverters, DC junction, Distribution & combiner boxes, AC junction & combiner boxes, lighting arrester, weather station, SCADA system, earthing, connecting wires / cables with all accessories required for SPV complete all as per MNRE/SECI specifications and technical specifications complete all as specified and directed. Note: Contractor shall also ensure the following:- (i) Annual maintenance contract for 5 Years complete all as specified and directed. (ii) Arrangement of all required work, access permissions shall be made available to work force of the contractor by the GE through Security Officer. (iii) Repairing of all installation if required will be carried out on site or at service centre. Quoted rates shall be inclusive and includes for required spares, services, labour, handling and transportation charges etc.. (iv) The Engineer/Electrician shall submit reports in soft copy format as required by the Engineer in Charge. (v) Security of all SPV equipment’s shall be complete responsibilities of Station Authorities.

6

-

-

... More
Design, Supply, Installation, Testing and commissioning including comprehensive maint for 5 years of Roof Top Solar Power Generation Plant of capacity 75 Kw (Minimum 90 KWp) (AC) at output Voltage 415 Volt, 50Hz, on grid connected complete with structure and foundation comprises Design and construction of foundation, civil supporting structure, modules, inverters, DC junction, Distribution & combiner boxes, AC junction & combiner boxes, lighting arrester, weather station, SCADA system, earthing, connecting wires / cables with all accessories required for SPV complete all as per MNRE/SECI specifications and technical specifications complete all as specified and directed. Note: Contractor shall also ensure the following:- (i) Annual maintenance contract for 5 Years complete all as specified and directed. (ii) Arrangement of all required work, access permissions shall be made available to work force of the contractor by the GE through Security Officer. (iii) Repairing of all installation if required will be carried out on site or at service centre. Quoted rates shall be inclusive and includes for required spares, services, labour, handling and transportation charges etc.. (iv) The Engineer/Electrician shall submit reports in soft copy format as required by the Engineer in Charge. (v) Security of all SPV equipment’s shall be complete responsibilities of Station Authorities.

1

-

-

... More
Supply , Installation, testing and comissioning of grid solar photovoltaic roof top 15 KW conforming to MNRE specification as amended, consisting of Mono/poly crystalline silicon solar cells, net metering facility, necesaary protections earthing mounted on Aluminium/GI structure of suitable strength with following components complete as required:- a) Solar photovoltaic Module of capacity 530Wp manufactured in India coforming to IS 14286/IEC 61215, IS/IEC 61730 Part-1 IS/IEC 61730 Paert-2. Solar Photovoltaic Module coversion efficiency shall not be less than 90 % at the end of 10 years and 80% at the end of 25 years. b) Power Conditioning Unit (PUC) of 350-800 V DC iput voltage range and 400 V AC three phase, 4 wire, 50 HZ +/- 2.5 Hz out put voltage suitable to generate AC power with efficieny not less than 97%, total harmonic distortion less than 3% and suitable for ambient temperature from 0 to 50 degree C. The PCY hall adjust the voltage and frequency level to suit the Grid voltage frequency. c. Data Monitoring system complete with acessoreis. d) Fixing of Array junction box & Main junction box with IP 65 protection and termination arrangement for incoming and outgoing cable along with glands, lugs and other acessories etc. as required. e) Lightning and surge voltage protection. f) Connections & Interconnections by supplying & fixing required size XLPE insulated copper conductor 1.1 KV grade armoured power and control cables between solar modules, main power cable to grid supply PCY unit along with supplying & fixing of necessary channel/conduit lugs and other acessories etc. as required.

1

-

-

... More
Supply , Installation, testing and comissioning of grid solar photovoltaic roof top 20 KW conforming to MNRE specification as amended, consisting of Mono/poly crystalline silicon solar cells, net metering facility, necesaary protections earthing mounted on Aluminium/GI structure of suitable strength with following components complete as required:- a) Solar photovoltaic Module of capacity 530Wp manufactured in India coforming to IS 14286/IEC 61215, IS/IEC 61730 Part-1 IS/IEC 61730 Paert-2. Solar Photovoltaic Module coversion efficiency shall not be less than 90 % at the end of 10 years and 80% at the end of 25 years. b) Power Conditioning Unit (PUC) of 350-800 V DC iput voltage range and 400 V AC three phase, 4 wire, 50 HZ +/- 2.5 Hz out put voltage suitable to generate AC power with efficieny not less than 97%, total harmonic distortion less than 3% and suitable for ambient temperature from 0 to 50 degree C. The PCY hall adjust the voltage and frequency level to suit the Grid voltage frequency. c. Data Monitoring system complete with acessoreis. d) Fixing of Array junction box & Main junction box with IP 65 protection and termination arrangement for incoming and outgoing cable along with glands, lugs and other acessories etc. as required. e) Lightning and surge voltage protection. f) Connections & Interconnections by supplying & fixing required size XLPE insulated copper conductor 1.1 KV grade armoured power and control cables between solar modules, main power cable to grid supply PCY unit along with supplying & fixing of necessary channel/conduit lugs and other acessories etc. as required.

1

-

-

... More
Supply , Installation, testing and comissioning of grid solar photovoltaic roof top 30 KW conforming to MNRE specification as amended, consisting of Mono/poly crystalline silicon solar cells, net metering facility, necesaary protections earthing mounted on Aluminium/GI structure of suitable strength with following components complete as required:- a) Solar photovoltaic Module of capacity 530Wp manufactured in India coforming to IS 14286/IEC 61215, IS/IEC 61730 Part-1 IS/IEC 61730 Paert-2. Solar Photovoltaic Module coversion efficiency shall not be less than 90 % at the end of 10 years and 80% at the end of 25 years. b) Power Conditioning Unit (PUC) of 350-800 V DC iput voltage range and 400 V AC three phase, 4 wire, 50 HZ +/- 2.5 Hz out put voltage suitable to generate AC power with efficieny not less than 97%, total harmonic distortion less than 3% and suitable for ambient temperature from 0 to 50 degree C. The PCY hall adjust the voltage and frequency level to suit the Grid voltage frequency. c. Data Monitoring system complete with acessoreis. d) Fixing of Array junction box & Main junction box with IP 65 protection and termination arrangement for incoming and outgoing cable along with glands, lugs and other acessories etc. as required. e) Lightning and surge voltage protection. f) Connections & Interconnections by supplying & fixing required size XLPE insulated copper conductor 1.1 KV grade armoured power and control cables between solar modules, main power cable to grid supply PCY unit along with supplying & fixing of necessary channel/conduit lugs and other acessories etc. as required.

1

-

-

... More
Supply , Installation, testing and comissioning of grid solar photovoltaic roof top 35 KW conforming to MNRE specification as amended, consisting of Mono/poly crystalline silicon solar cells, net metering facility, necesaary protections earthing mounted on Aluminium/GI structure of suitable strength with following components complete as required:- a) Solar photovoltaic Module of capacity 530Wp manufactured in India coforming to IS 14286/IEC 61215, IS/IEC 61730 Part-1 IS/IEC 61730 Paert-2. Solar Photovoltaic Module coversion efficiency shall not be less than 90 % at the end of 10 years and 80% at the end of 25 years. b) Power Conditioning Unit (PUC) of 350-800 V DC iput voltage range and 400 V AC three phase, 4 wire, 50 HZ +/- 2.5 Hz out put voltage suitable to generate AC power with efficieny not less than 97%, total harmonic distortion less than 3% and suitable for ambient temperature from 0 to 50 degree C. The PCY hall adjust the voltage and frequency level to suit the Grid voltage frequency. c. Data Monitoring system complete with acessoreis. d) Fixing of Array junction box & Main junction box with IP 65 protection and termination arrangement for incoming and outgoing cable along with glands, lugs and other acessories etc. as required. e) Lightning and surge voltage protection. f) Connections & Interconnections by supplying & fixing required size XLPE insulated copper conductor 1.1 KV grade armoured power and control cables between solar modules, main power cable to grid supply PCY unit along with supplying & fixing of necessary channel/conduit lugs and other acessories etc. as required.

1

-

-

... More
Supply , Installation, testing and comissioning of grid solar photovoltaic roof top 40 KW conforming to MNRE specification as amended, consisting of Mono/poly crystalline silicon solar cells, net metering facility, necesaary protections earthing mounted on Aluminium/GI structure of suitable strength with following components complete as required:- a) Solar photovoltaic Module of capacity 530Wp manufactured in India coforming to IS 14286/IEC 61215, IS/IEC 61730 Part-1 IS/IEC 61730 Paert-2. Solar Photovoltaic Module coversion efficiency shall not be less than 90 % at the end of 10 years and 80% at the end of 25 years. b) Power Conditioning Unit (PUC) of 350-800 V DC iput voltage range and 400 V AC three phase, 4 wire, 50 HZ +/- 2.5 Hz out put voltage suitable to generate AC power with efficieny not less than 97%, total harmonic distortion less than 3% and suitable for ambient temperature from 0 to 50 degree C. The PCY hall adjust the voltage and frequency level to suit the Grid voltage frequency. c. Data Monitoring system complete with acessoreis. d) Fixing of Array junction box & Main junction box with IP 65 protection and termination arrangement for incoming and outgoing cable along with glands, lugs and other acessories etc. as required. e) Lightning and surge voltage protection. f) Connections & Interconnections by supplying & fixing required size XLPE insulated copper conductor 1.1 KV grade armoured power and control cables between solar modules, main power cable to grid supply PCY unit along with supplying & fixing of necessary channel/conduit lugs and other acessories etc. as required.

1

-

-

... More
Supply , Installation, testing and comissioning of grid solar photovoltaic roof top 45 KW conforming to MNRE specification as amended, consisting of Mono/poly crystalline silicon solar cells, net metering facility, necesaary protections earthing mounted on Aluminium/GI structure of suitable strength with following components complete as required:- a) Solar photovoltaic Module of capacity 530Wp manufactured in India coforming to IS 14286/IEC 61215, IS/IEC 61730 Part-1 IS/IEC 61730 Paert-2. Solar Photovoltaic Module coversion efficiency shall not be less than 90 % at the end of 10 years and 80% at the end of 25 years. b) Power Conditioning Unit (PUC) of 350-800 V DC iput voltage range and 400 V AC three phase, 4 wire, 50 HZ +/- 2.5 Hz out put voltage suitable to generate AC power with efficieny not less than 97%, total harmonic distortion less than 3% and suitable for ambient temperature from 0 to 50 degree C. The PCY hall adjust the voltage and frequency level to suit the Grid voltage frequency. c. Data Monitoring system complete with acessoreis. d) Fixing of Array junction box & Main junction box with IP 65 protection and termination arrangement for incoming and outgoing cable along with glands, lugs and other acessories etc. as required. e) Lightning and surge voltage protection. f) Connections & Interconnections by supplying & fixing required size XLPE insulated copper conductor 1.1 KV grade armoured power and control cables between solar modules, main power cable to grid supply PCY unit along with supplying & fixing of necessary channel/conduit lugs and other acessories etc. as required.

1

-

-

... More
Supply , Installation, testing and comissioning of grid solar photovoltaic roof top 50 KW conforming to MNRE specification as amended, consisting of Mono/poly crystalline silicon solar cells, net metering facility, necesaary protections earthing mounted on Aluminium/GI structure of suitable strength with following components complete as required:- a) Solar photovoltaic Module of capacity 530Wp manufactured in India coforming to IS 14286/IEC 61215, IS/IEC 61730 Part-1 IS/IEC 61730 Paert-2. Solar Photovoltaic Module coversion efficiency shall not be less than 90 % at the end of 10 years and 80% at the end of 25 years. b) Power Conditioning Unit (PUC) of 350-800 V DC iput voltage range and 400 V AC three phase, 4 wire, 50 HZ +/- 2.5 Hz out put voltage suitable to generate AC power with efficieny not less than 97%, total harmonic distortion less than 3% and suitable for ambient temperature from 0 to 50 degree C. The PCY hall adjust the voltage and frequency level to suit the Grid voltage frequency. c. Data Monitoring system complete with acessoreis. d) Fixing of Array junction box & Main junction box with IP 65 protection and termination arrangement for incoming and outgoing cable along with glands, lugs and other acessories etc. as required. e) Lightning and surge voltage protection. f) Connections & Interconnections by supplying & fixing required size XLPE insulated copper conductor 1.1 KV grade armoured power and control cables between solar modules, main power cable to grid supply PCY unit along with supplying & fixing of necessary channel/conduit lugs and other acessories etc. as required.

1

-

-

... More
Supply , Installation, testing and comissioning of grid solar photovoltaic roof top 70 KW conforming to MNRE specification as amended, consisting of Mono/poly crystalline silicon solar cells, net metering facility, necesaary protections earthing mounted on Aluminium/GI structure of suitable strength with following components complete as required:- a) Solar photovoltaic Module of capacity 530Wp manufactured in India coforming to IS 14286/IEC 61215, IS/IEC 61730 Part-1 IS/IEC 61730 Paert-2. Solar Photovoltaic Module coversion efficiency shall not be less than 90 % at the end of 10 years and 80% at the end of 25 years. b) Power Conditioning Unit (PUC) of 350-800 V DC iput voltage range and 400 V AC three phase, 4 wire, 50 HZ +/- 2.5 Hz out put voltage suitable to generate AC power with efficieny not less than 97%, total harmonic distortion less than 3% and suitable for ambient temperature from 0 to 50 degree C. The PCY hall adjust the voltage and frequency level to suit the Grid voltage frequency. c. Data Monitoring system complete with acessoreis. d) Fixing of Array junction box & Main junction box with IP 65 protection and termination arrangement for incoming and outgoing cable along with glands, lugs and other acessories etc. as required. e) Lightning and surge voltage protection. f) Connections & Interconnections by supplying & fixing required size XLPE insulated copper conductor 1.1 KV grade armoured power and control cables between solar modules, main power cable to grid supply PCY unit along with supplying & fixing of necessary channel/conduit lugs and other acessories etc. as required.

1

-

-

... More
Supply , Installation, testing and comissioning of grid solar photovoltaic roof top 75 KW conforming to MNRE specification as amended, consisting of Mono/poly crystalline silicon solar cells, net metering facility, necesaary protections earthing mounted on Aluminium/GI structure of suitable strength with following components complete as required:- a) Solar photovoltaic Module of capacity 530Wp manufactured in India coforming to IS 14286/IEC 61215, IS/IEC 61730 Part-1 IS/IEC 61730 Paert-2. Solar Photovoltaic Module coversion efficiency shall not be less than 90 % at the end of 10 years and 80% at the end of 25 years. b) Power Conditioning Unit (PUC) of 350-800 V DC iput voltage range and 400 V AC three phase, 4 wire, 50 HZ +/- 2.5 Hz out put voltage suitable to generate AC power with efficieny not less than 97%, total harmonic distortion less than 3% and suitable for ambient temperature from 0 to 50 degree C. The PCY hall adjust the voltage and frequency level to suit the Grid voltage frequency. c. Data Monitoring system complete with acessoreis. d) Fixing of Array junction box & Main junction box with IP 65 protection and termination arrangement for incoming and outgoing cable along with glands, lugs and other acessories etc. as required. e) Lightning and surge voltage protection. f) Connections & Interconnections by supplying & fixing required size XLPE insulated copper conductor 1.1 KV grade armoured power and control cables between solar modules, main power cable to grid supply PCY unit along with supplying & fixing of necessary channel/conduit lugs and other acessories etc. as required.

1

-

-

... More
Supply, laying/fixing GI tubing medium grade with all fitting in trenches or fixed to walls, ceilings or laid in floors complete all as specified and directed for 20mm bore.

277

-

-

... More
Supply, laying/fixing GI tubing medium grade with all fitting in trenches or fixed to walls, ceilings or laid in floors complete all as specified and directed for 25mm bore.

210

-

-

... More
Supply, laying/fixing GI tubing medium grade with all fitting in trenches or fixed to walls, ceilings or laid in floors complete all as specified and directed for 40mm bore.

220

-

-

... More
S & F rotational moulded poly-ethylene water storage tanks of cap 1000 Ltrs (cylindrical vertical with closed top) hoisted and fixed in position complete specified in SSR Part I complete all as specified .

1

-

-

... More
S & F rotational moulded poly-ethylene water storage tanks of cap 500 Ltrs (cylindrical vertical with closed top) hoisted and fixed in position complete specified in SSR Part I complete all as specified .

36

-

-

... More
S & F Ball valves 20mm high pressure of PTMT with epoxy coated Aluminium rod & highdensity plastic ball screwed for iron pipe and fixed. (Minimum weight 15mm-142gms/ 2 0mm-210gms./ 25mm-455gms/ 40mm - 690 gms) all as specified and directed.

37

-

-

... More
S & F Gun-metal, 20mm globe or gate valves, with iron wheel head, screwed both ends for iron pipe and fixed complete all as specified and directed.

38

-

-

... More
S & F Gun-metal, 40mm globe or gate valves, with iron wheel head, screwed both ends for iron pipe and fixed complete all as specified and directed.

5

-

-

... More
M & L Bib tap standard of PTMT any colour high pressure screwed for iron pipe and fixed. (Minimum weight 15mm-90gms/20mm 125gms).

37

-

-

... More
M&L for cutting of existing road/cement concrete/bituminous road of size not less than 0.6m for laying of GI/CI/DI pipe & making good to the disturbed surface by providing PCC or Same material after laying of pipe line and returning filling of soil complete all as specified and directed.

36

-

-

... More
M& L for Cutting existing steel 20mm tubing for alterations or additions (Each cut measured) all specified and directed.

28

-

-

... More
M& L for Cutting existing steel 40/50 mm tubing for alterations or additions (Each cut measured) all specified and directed.

4

-

-

... More
Excavation in trenches n exc 1.5 mtr wide and n exc 1.5m in depth for laying of water supply pipe line etc n exc 10 Sqm on plan and getting out soft/loose soil. Note :- Excavation to be done through manual only due to site condition all as specified and directed.

555.67

-

-

... More
Returning filling in includinguding spreading, levelling, watering and well ramming in layers not exc 25 cm in soft/loose soil complete all as specified and directed.

250.25

-

-

... More
Removing excavated material n exc 50 m and depositing where directed at a level n exc 1.5 m above the starting point complete all as specified and directed.

304.42

-

-

... More
Supply, laying and testing cable XLPE Insulated, screened, PVC bedded, galvanized steel strip or wire armoured, electric power cables (heavy duty) 1100 Volts grade with stranded aluminium conductor of size 10q mm 4core all as specified and directed

635

-

-

... More
Supply, laying and testing cable XLPE Insulated, screened, PVC bedded, galvanized steel strip or wire armoured, electric power cables (heavy duty) 1100 Volts grade with stranded aluminium conductor of size 16 sq mm 4core all as specified and directed

210

-

-

... More
Supply, laying and testing cable XLPE Insulated, screened, PVC bedded, galvanized steel strip or wire armoured, electric power cables (heavy duty) 1100 Volts grade with stranded aluminium conductor of size 25 sq mm 4core all as specified and directed.

430

-

-

... More
Supply, laying and testing cable XLPE Insulated, screened, PVC bedded, galvanized steel strip or wire armoured, electric power cables (heavy duty) 1100 Volts grade with stranded aluminium conductor of size 35 sq mm 3.5 core all as specified and directed.

410

-

-

... More
Supply, laying and testing cable XLPE Insulated, screened, PVC bedded, galvanized steel strip or wire armoured, electric power cables (heavy duty) 1100 Volts grade with stranded aluminium conductor of size 50 sq mm 3.5 core all as specified and directed.

344

-

-

... More
Supply, laying and testing cable XLPE Insulated, screened, PVC bedded, galvanized steel strip or wire armoured, electric power cables (heavy duty) 1100 Volts grade with stranded aluminium conductor of size 70 sq mm 3.5 core all as specified and directed.

200

-

-

... More
Supply, laying and testing cable XLPE Insulated, screened, PVC bedded, galvanized steel strip or wire armoured, electric power cables (heavy duty) 1100 Volts grade with stranded aluminium conductor of size 95 sq mm 3.5 core all as specified and directed.

690

-

-

... More
Supply, laying and testing cable XLPE Insulated, screened, PVC bedded, galvanized steel strip or wire armoured, electric power cables (heavy duty) 1100 Volts grade with stranded aluminium conductor of size 300 sq mm 3.5 core all as specified and directed.

450

-

-

... More
Supply and spread sand for sand cushioning of cables in trenches all as specified in MES Schedule Part-I and all as directed. Note: Punned thickness only will be measured and paid.

204.67

-

-

... More
Supply and lay in trenches, old burnt sub class 'B' bricks as specified and all as directed.

21.97

-

-

... More
Trimming up of tree branches all around Bldg removing cut branches from site as directed, Note :- (i) clear from all trees branches all around the bldg. (ii) Quoted rates shall deemed to be included use of T&P. One span comprises of distance between one pole to another including all trees in its vicinity including switch off/on, electric cable connection or disconnection. Necessary permission will be obtained from department by contractor one day prior to trimming in particular area and shut down of that area will be arranged by the department.

2

-

-

... More
M&L for earthing with steel earth plate electrode of size 60cmx60cmx6mm thick buried directly in ground to a depth not less than 2.25 mtr deep below normal ground level with top edge of the earth plate not less than 1.5 mtr deep below normal ground level connected to galvanized iron strip of size 32x6mm as earthing lead by means of nuts, bolts and washers of steel after welding of GI strip to earth electrode to the full length of earth plate,40mm dia GI tubing light grade protection pipe upto test point, 20mm dia GI watering pipe with funnel and wire mesh, PCC pit 1:3:6 with pit cover of size 30X30cm made of RCC 1:3:6 with suitable handle,angle iron frame made of angle iron of size 40x40x4mm, adequate qty of charcoal dust and salt layers all around the earth plate, removal of surplus soil and returning filling in all as required at site including test point made out of steel plate of size 75x75x6mm fixed to wall all as specified in plate No 3 of SSR Part-I and directed by Engr-In-Charge.

28

-

-

... More
Earth continuity conductor or main earthing strip fixed to wall on batten or recess or chases or buried in ground or drawn in conduit/pipe or fixed to poles or any other indicated situation for loop earthing etc. as required 32X6mm dia galvanised iron strip complete all as specified and directed.

100

-

-

... More
M&L for cutting of existing road/cement concrete/bituminous road of size not less than 0.6m for laying of GI/CI/DI pipe & making good to the disturbed surface by providing PCC or Same material after laying of pipe line and returning filling of soil complete all as specified and directed.

216

-

-

... More
Supply and lay GI tubing 50 mm bore, light grade, galvanised, ISI marked with all specials for cable protection on road crossing/floor etc duly sealed at both ends after all as specified and directed.

180

-

-

... More
Supply and lay GI tubing 100 mm bore, light grade, galvanised, ISI marked with all specials for cable protection on road crossing/floor etc duly sealed at both ends after all as specified and directed.

36

-

-

... More
Supplying and fixing smart three phase four wire dual source prepaid energy meters BIS 15884 marked in existing meter board/ floor panels with pre payment capcity touch keybpad based digital having current range 10-100 Amp 415 volt accuracy class 1.0 alongwith parallel home display split unit with inbuilt load control switch containing provision for TOD and RTC in built feature to sense the DG mode through PLSI, dual source registration wrt grid as well as DG supply and dynamic load allocation facility from grid and DG capable to define for tariff slabs, happy hours and holiday definition.

37

-

-

... More
Supply, install test and commission of out door type bus bar feeder pillar having tapered roof outer shell made out of 3.0mm thisck MS sheet and inner shell made out of 2mm thick MS sheet aand MS angle 50x50x6 mm mounted on PCC 1:2: 4 type B-1 platform 90 cm above and 45 cm below the ground level, frame factory fabricated with front and back open door syste. 4 Nos copper bus bar 100 Amp and size of panel (600x600x450mm) cap fixed over epoxy insulator duly insulated with different sleeves R Y B phase and neutral and necessary holes of suitable dia in busbar strip with locking arrangement, U type gasket shall be used to make the outer shell completely vermin proof suitable for 3 phase 4 wire 415 volt 50 Hz tested at factory approved from CPRI having thickness with suitabale with gasket to make it dust/vermin proof, complete all as specified and as directed. (a) Voltmeter digital type 0-500Amps with in built selector switch-01 No (b) Ammeter digital type 0-400 Amps with suitable size of CTs and inbuilt selector switch -01 No (c) Phase indicator lamp neon type RYB (set of three)-01 set Note. (i) The quoted rate shall includes minor items such as lugs, nuts & bolts, washers, top insulators, sleeves, provision of extra holes in bus bar etc. (ii) All internal wiring shall be done with suitable size of PVC insulated solid copper conductor FRLSH cable conforming to IS-694.

10

-

-

... More
Supply, installation, testing and commissioning of outdoor type bus bar feeder pillar having tapered roof outer shell made out of 3.0mm thisck MS sheet and inner shell made out of 2mm thick MS sheet aand MS angle 50x50x6 mm mounted on PCC 1:2: 4 type B-1 platform 90 cm above and 45 cm below the ground level, frame factory fabricated with front and back open door syste. 4 Nos copper bus bar 150 Amp and size of panel (600x600x450mm) cap fixed over epoxy insulator duly insulated with different sleeves R Y B phase and neutral and necessary holes of suitable dia in busbar strip with locking arrangement, U type gasket shall be used to make the outer shell completely vermin proof suitable for 3 phase 4 wire 415 volt 50 Hz tested at factory approved from CPRI having thickness with suitabale with gasket to make it dust/vermin proof complete all as specified and as directed (a) Voltmeter digital type 0-500 Amps with in built selector switch-01 No (b) Ammeter digital type 0-400 Amps with suitable size of CTs and inbuilt selector switch -01 No (c) Phase indicator lamp neon type RYB (set of three)-01 set Note. (i) The quoted rate shall includes minor items such as lugs, nuts & bolts, washers, top insulators, sleeves, provision of extra holes in bus bar etc. (ii) All internal wiring shall be done with suitable size of PVC insulated solid copper conductor FRLSH cable conforming to IS-694.

10

-

-

... More
Supply ,install test and commission of out door type bus bar feeder pillar having tapered roof outer shell made out of 3.0mm thisck MS sheet and inner shell made out of 2mm thick MS sheet aand MS angle 50x50x6 mm mounted on PCC 1:2: 4 type B-1 platform 90 cm above and 45 cm below the ground level, frame factory fabricated with front and back open door system. 4 Nos copper bus bar 300 Amp and size of panel (600x600x450mm) cap fixed over epoxy insulator duly insulated with different sleeves R Y B phase and neutral and necessary holes of suitable dia in busbar strip with locking arrangement, U type gasket shall be used to make the outer shell completely vermin proof suitable for 3 phase 4 wire 415 volt 50 HZ tested at factory approved from CPRI having thickness with suitabale with gasket to make it dust/vermin proof complete all as specified and as directed (a) Voltmeter digital type 0-500 Amps with in built selector switch-01 No (b) Ammeter digital type 0-400 Amps with suitable size of CTs and inbuilt selector switch -01 No (c) Phase indicator lamp neon type RYB (set of three)-01 set Note. (i) The quoted rate shall includes minor items such as lugs, nuts & bolts, washers, top insulators, sleeves, provision of extra holes in bus bar etc. (ii) All internal wiring shall be done with suitable size of PVC insulated solid copper conductor FRLSH cable conforming to IS-694.

10

-

-

... More
Supply ,install test and commission of out door type bus bar feeder pillar having tapered roof outer shell made out of 3.0mm thisck MS sheet and inner shell made out of 2mm thick MS sheet aand MS angle 50x50x6 mm mounted on PCC 1:2: 4 type B-1 platform 90 cm above and 45 cm below the ground level, frame factory fabricated with front and back open door system. 4 Nos copper bus bar 200 Amp and size of panel (600x600x450mm) cap fixed over epoxy insulator duly insulated with different sleeves R Y B phase and neutral and necessary holes of suitable dia in busbar strip with locking arrangement, U type gasket shall be used to make the outer shell completely vermin proof suitable for 3 phase 4 wire 415 volt 50 HZ tested at factory approved from CPRI having thickness with suitabale with gasket to make it dust/vermin proof complete all as specified and as directed (a) Voltmeter digital type 0-500 Amps with in built selector switch-01 No (b) Ammeter digital type 0-400 Amps with suitable size of CTs and inbuilt selector switch -01 No (c) Phase indicator lamp neon type RYB (set of three)-01 set Note. (i) The quoted rate shall includes minor items such as lugs, nuts & bolts, washers, top insulators, sleeves, provision of extra holes in bus bar etc. (ii) All internal wiring shall be done with suitable size of PVC insulated solid copper conductor FRLSH cable conforming to IS-694.

10

-

-

... More
Addition / alteration of existing LT panels with bus bar with suitable size / capacity matching with the existing busbar of LT panel board for positioning the new LT cables for roof top solar along with complete glands, lugs and nut and bolts suitable size of cable all as specified and directed.

16

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.