Regional Institute Of Paramedical And Nursing Sciences Tender

View complete overview of Mizoram RIPANS Tender

Regional Institute Of Paramedical And Nursing Sciences - RIPANS Tender

Works
Civil Works Others
Eprocure
Opening Date2 Nov 2021
Closing Date11 Nov 2021
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Centering and shuttering including strutting, propping etc. and removal of form for all heights : c) Columns, pillars, piers, abutments, posts and struts.

95.28

-

-

... More
(d) Lintels, beams, plinth beams, girders, bressumers and cantilevers, etc.

166.24

-

-

... More
(e) Suspended floors, roofs, landings, shelves and their support, balconies and chajjaj,etc.

279.62

-

-

... More
Steel reinforcement for RCC work including straighthening, cutting, bending, placing in position and binding all complete. (b) Thermo-Mechanically Treated bars of grade Fe-500 or more.

8908.07

-

-

... More
Half brick masonry with first class brick in superstructure above plinth level upto floor V level. a) in cement mortar 1: 3 ( 1 cement : 3 coarse sand )

113.49

-

-

... More
15mm cement plaster 1 : 4 (1 cement : 4 fine sand).

768.12

-

-

... More
Providing 2nd class local wood work dressed in frames of sill, upright, batten, post, beams, etc. as structural members fixed in position complete.

2.16

-

-

... More
Providing and fixing anodised aluminium work for doors, windows, ventilators and partitions with extruded built up standard sections/ other sections of approved make conforming to IS : 733 and IS : 1285 fixing with dash fasteners of required dia and size, including necessary filling up of gaps at junctions, at top, bottom and sides with required PVC/ neoprene gaskets etc. Aluminium sections shall be smooth, rust free, straight, mitred and jointed mechanically wherever required including cleat angle, aluminium snap beading for glazing /panelling, CP brass /stainless steel screws all complete including fixing of glasses but excluding cost of glasses. a) Natural colour i) 2 - track sliding windows/ventilators.

4.86

-

-

... More
Supplying of glass panes at site. b) 5mm thick plate sheet glass.

4.86

-

-

... More
Steel work in built up tubular (round, square or rectangular hollow tubes etc.)trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.

266.47

-

-

... More
Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface :

768.12

-

-

... More
Finishing walls with water proofing cement paint of approved brand and manufacture and of required shade to give an even shade. New work (two or more coats)

1536.24

-

-

... More
Providing and placing on terrace (at all floor levels) polyethylene water storage tank, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank. a) Sintex or quivalent

2000

-

-

... More
Earthwork in excavation in foundation trenches etc. not exceeding 2 meters depth including dressing of bottom and sides of trenches and subsequent filling and compaction in 15cm layers as in column foundations, fence posts, etc. and disposal of all surplus soil as directed within a lead of 30 metres. c) Very Hard Soil ( jumper work )

2.5

-

-

... More
Regular coursed rubble masonry with hard stone in foundation upto one storey above and below ground level including curing, etc. complete. a) in cement mortar 1 : 3 ( 1cement : 3 fine sand)

9

-

-

... More
15mm cement plaster 1 : 4 (1 cement : 4 fine sand).

10

-

-

... More
Earthwork in excavation in foundation trenches etc. not exceeding 2 meters depth including dressing of bottom and sides of trenches and subsequent filling and compaction in 15cm layers as in column foundations, fence posts, etc. and disposal of all surplus soil as directed within a lead of 30 metres. c) Very Hard Soil ( jumper work )

17.5

-

-

... More
Reinforced cement concrete work in walls including attached pillasters, columns, pillers, posts, piers, abutments, return walls, retaining walls, struts, buttresses, string or lacing courses, fillets etc. upto floor five level excluding cost of centering shuttering etc complete. a) 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size)

4.98

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for all heights : (e) Suspended floors, roofs, landings, shelves and their support, balconies and chajjaj,etc.

41.5

-

-

... More
Steel reinforcement for RCC work including straighthening, cutting, bending, placing in position and binding all complete. (b) Thermo-Mechanically Treated bars of grade Fe-500 or more.

498

-

-

... More
15mm cement plaster 1 : 4 (1 cement : 4 fine sand).

41.5

-

-

... More
Providing and mixing water proofing chemical (PIDI PROOF POWDER chemical) in plain and reinforced cement concrete work 1 : 1.5 : 3 , @ 1.0 % by weight of cement.

4.98

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.