Border Security Force Tender

View complete overview of Mizoram BSF Tender

Border Security Force - BSF Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date17 Oct 2024
Closing Date23 Oct 2024
Tender Amount₹ 38,38,075 
Notes
Download

Costs

Summary

Reconstruction Extension Of Retaining Wall Damaged Stone Measonary Retaining Wall

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and laying in position excluding cement concrete of level: specified grade the cost of centering and shuttering - All work up to plinth 1:4:8 (1 Cement : 4 coarse sand (zone-Ill) derived from natural sources: 8 graded stone aggregate 40 mm nominal size derived from natural sources)

8

6812

54496

... More
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-Ill) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)

4.49

8583

38539.47

... More
Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete

9.1

392

3568.57

... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.

819

107

88329.15

... More
Coursed rubble masonry (second sort) with hard stone in foundation & plinth with : Cement mortar 1:6(1 cement : 6 coarse sand)

35.84

8198

293836.03

... More
Coursed rubble masonry with hard stone (first or second sort) in superstructure above plinth level and upto floor five level. Masonry work (second sort), in cement mortar 1:6(1 cement: 6 coarse sand)

125.15

10128

1267531.72

... More
Pointing on stone work with cement mortar 1:3 (1 cement: 3 fine sand) : Raised and cut pointing

136.5

701

95693.33

... More
Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge : In cement mortar

81.54

2458

200502.78

... More
Add Cost Index @ 66.09% on SR&DR from sr 1 to 11

1

1765008

1765008.75



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.