Border Roads Organisation Tender
View complete overview of Mizoram BRO Tender
Costs
EMD
₹ 5,83,200Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_BRO_575575_1Bid Award Id
ViewTender No
NIT-15 OF 2022-23Tender Authority
Border Roads Organisation ViewPurchaser Address
-Website
http://defproc.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Providing and applying prime coat with bitumen emulsion of specified grade on prepared surface of WMM including cleaning of road surface with mechanical broom and spraying primer with bitumen emulsion SS1 grade @ 7.50 Kg per 10 sqm. (using BPD ) conforming to clause 502 of MORT&H Specification for road and bridge works (5th Revision), complete in all respect as specified and directed by Engg-In-Charge
26214.4
-
-
Providing and applying tack coat either with bitumen VG-10 or Bitumen emulsion using bitumen pressure distributor @ 2.5 Kg/10 Sqm on prepared WMM and DBM surface cleaned with mechanical broom, all complete as per clause 503 of MoRT&H specifications for road and bridge works (5th Revision) complete in all respect as specified and directed by Engg-In-Charge.
26214.4
-
-
Earthwork in embankment by filling with earth free from roots etc. spreading in layers not exceeding 30 cm including watering and finishing to required slope & level not exceeding 1.5 m high above the base in ordinary soil in hill roads where cut & fill method is adopted.
1069.55
-
-
Road marking with thermoplastic paint (2.5 mm thick) conforming to MoRT&H: 803.4 including preparation of surface and application.
1398.1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements