Pradhan Mantri Gram Sadak Yojana Tender

View complete overview of Meghalaya PMGSY Tender

Pradhan Mantri Gram Sadak Yojana - PMGSY Tender

Works
Civil And Construction
Bridge Construction
Eprocure
Opening Date23 Jul 2024
Closing Date2 Aug 2024
Tender Amount₹ 5,50,22,459 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
I)PCC

2.01

-

589.5

... More
II)RCC

25.27

-

1301.63

... More
Excavation in Hilly Areas in Soil by mechanical means Excavation in soil in Hilly Area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with a lift upto 1.5 m and a lead upto 20 m as per Technical Specification Clause 1603.1 (A) All types of ordinary soil

3.34

-

139.5

... More
Construction of Embankment with Materials Obtained from Roadway Cutting Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5

6060.4

-

77.63

... More
Construction of Subgrade and Shoulder with Materials obtained from Borrow pits. Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.

2729.17

-

360

... More
Compacting Original Ground Supproting Subgrade Loosening of the Ground upto a level of 300mm below the Subgrade level, watered, graded and compacted in Layers to meet requirement of Table 300.1 and 300.2 for subgrade construction as per technical Specification Clause 300.5.2

1732.5

-

82.13

... More
Preparation of Foundation for Embankment Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. For Existing Road Portion

14835

-

18

... More
Construction of GSB Construction of granular sub-base with locally available graded material, spreading in uniform layers with motor grader on prepared surface, watering to OMC and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification/ direction of EE.

1139.39

-

1819.35

... More
Water Bound Macadam Base

-

-

-

... More
Water Bound Macadam Base : WBM Grading 2 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405.

540.49

-

3225.82

... More
Water Bound Macadam Base : WBM Grading 3 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.

1051.19

-

3348.36

... More
Bituminous work

-

-

-

... More
Prime coat Providing and applying primer coat with bitumen emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.6-0.9 kg/sqm using mechanical means as per Technical Specification

14045.63

-

38.82

... More
Tack coat Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.

14219.88

-

18.46

... More
20 mm thick Open Graded Premix Carpet using Bitumen Emulsion 20 mm thick Open Graded Premix Carpet using Bitumen Emulsion as per Technical Specification Clause 508.2

14219.88

-

235.29

... More
Seal Coat (Type C) Bitumen Emulsion

14219.88

-

89.79

... More
Guid Post Construction of RCC guide posts 250 mm dia M15 grade cast-in situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical RCC posts not to exceed 1 in 500 as per drawing and technical Specification Clause 1608.2.

3

-

3227.9

... More
Traffic Signs Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801. (ii)600 mm equilateral triangle.

34

-

3323.79

... More
PMGSY Informatory Sign Board with Logo Providing and fixing of typical PMGSY Informatory Sign Board with Logo as per MORD Specifications and Drawing. Three MS Plates of 1.6mm thick, top and middle plate duly welded with MS flat iron 25mm x 5mm size on back on edges. (i) Logo Board at starting point.

1

-

10000

... More
PMGSY Informatory Sign Board with Logo Providing and fixing of typical PMGSY Informatory Sign Board with Logo as per MORD Specifications and Drawing. Three MS Plates of 1.6mm thick, top and middle plate duly welded with MS flat iron 25mm x 5mm size on back on edges. (ii) Logo Board.

11

-

12000

... More
Maintainace Board for PMGSY Project

1

-

30839.37

... More
Kilometre Stone

-

-

-

... More
Construction of 5th Kilometre Stone (Precast) : Reinforced cement concrete M 15 grade 5th Kilometre stone with local stone of standard design as per IRC : 8 fixingin position including painting and printing etc. as per drawing and Technical Specification Clause 1703.

1

-

5644.01

... More
Construction of Ordinary Kilometre Stone (Precast) : Reinforced cement concrete M 15 grade ordinary Kilometre stone with local stone of standard design as per IRC : 8 fixingin in position including painting and printing etc. as per drawing and Technical Specification Clause 1703.

6

-

3286.85

... More
Construction of 200 Metre Stone (Precast) : Reinforced cement concrete M 15 grade 200 metre stone with local stone of standard design as per IRC : 8 fixingin in position including painting and printing etc. as per drawing and technical specification Clause 1703.

20

-

921.5

... More
Construction of reference pillars as per Fig. 1600.1 (b) as per drawing and Technical Specification Clause 1602.1.

6

-

102.25

... More
Construction of unlined surface drain Construction of unlined surface drain of average cross-sectional area 0.4 sqm in Soil to specified lines, grades, levels and dimensions as per approved design and Technical Specification Clause 307. Excavated material to be used in embankment at site. (A) Manual Means.

2537

-

67.5

... More
Protection works

-

-

-

... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) Ordinary soil I. Manual Means A. upto 3 m depth

1087.07

-

288

... More
Retaining Wall / Breast Wall Construction of Gabion Wall of 1.0m Height

30

-

8066

... More
Retaining Wall / Breast Wall Construction of Gabion Wall of 2.0m Height

399.4

-

12981

... More
Backfilling behind abutment, wing Wall, and return wall complete as per drawing & technical specification Clause 1204.3.8 I. Granullar material.

93.52

-

1664.4

... More
Providing Concrete (M-15) for Plain Concrete in open foundations complete as per drawing and Technical specification clause 802, 803, 1202,& 1203.

82.25

-

7397.14

... More
Providing Concrete (M-25) for Plain/Reinforced Concrete in Superstructure complete for height upto 5 m as per drawing and Technical specification clause 802, 804, 805, 1202,& 1204 of specifiaction of Rural Roads including curing complete.

25.18

-

10850.85

... More
Supplying, Fitting and Placing HYSD Bar Reinforcement in Superstructure including cost of Steel Material and carriage etc. complete as per Drawing and Technical Specification Clause 1002, 1005, 1010, and 1202 of Specification of Rural Roads.

0.7

-

93186.83

... More
Providing weephole in brick, stone masonary, plain/reinforced concrete abutment, wing wall, return wall with 100mm dia. AC pipe extending through full length of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification clauses 614, 709, 1204.3.7.

44

-

552.97

... More
(ii) Dorangre (Dorrangre) to Nangalbibra (L= 5.00Km)

-

-

-

... More
Turfing with Sods Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or as directed by the Engineer including preparation of ground, fetching of sods and watering as per Technical Specification Clause 309.

1936

-

19.04

... More
Granular Sub Base

-

-

-

... More
(A) By mix in Place Method Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. (II) For Grading Material (Gr - II )

1791

-

2358.8

... More
Cement Treated Sub Base/Base: Providing, laying and spreading of soil including sand and gravel, laterite, kankar, brick aggregate, crushed rock or slag or any combbination of these on a prepared sub grade pulverising adding the designed quantity of cement to hte spread soil mixing in palce with rotavator, grading ith the motor grader and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of subbase/base as per Technical Specification as per Clause 404

1500

-

3119.5

... More
Bituminous Work

-

-

-

... More
PRIME COAT: Low porosity; providing and applying primer coat with bitumen enulsion (SS-I) on prepared surface of granular base including cleaning of road surface and spraying primer at hte rate of 0.70-1.0 Kg/sqm using mechanical means as per technical Clause 502

13740

-

52.35

... More
TACK COAT: (III) providing and applying tack coat with bitumen emulsion (RS-I) using emulsing distributor at the rate of 0.25-.030 Kg/sgm (0.30 to 0.35 Kg/Sqm on Cement Concrete Pavement) on the prepared granular surface treated with primeer & cleaned with hydraulic broom as per technical clause 503.

13740

-

16.62

... More
20mm thick Open Graded Premix Carpet using Bitminous Emuslion as per Technical Specification Clause 508.2 Providing , laying and rolling of open graded premix carpet of 20mm thickness composed of 13.2mm to 5.6mm aggregrates either using penetration grade bitumen or emulsing to required line, grade and leel to serve as wearing course on a previoiusly prepared base including mixing in a suitable palnt, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clasue 508 Case II By Mechanical Means (i) Bitumen (S-90)

13740

-

224.6

... More
SEAL COAT; Providing and laying seal coat sealing the voids in a bitumenious surface laid to the specified levels, using cold emulsion grade and cross fall using Type A, Typr B and Type C as per Technical Specification Clause 5.10 B) By Mechanical Means Case II Type B (i) Bitumen (S-90)

13740

-

90.22

... More
Trafic - Signs B. Semi Reflective Traffic Signs (1) Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5mm thick supported on a mild steel angle Iron post 75mm x 75mm x 6mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450mm x 450mm x600mm, 600mm below ground level as per drawings and Technical Specification clause 801

-

-

-

... More
(i) 60 cm equilateral triangle

17

-

3257.38

... More
(iii) 60cm circular

2

-

3615.38

... More
(iv) 80cm x 60cm rectangular. (Informatory)

2

-

6437.29

... More
Kilometer Stone Reinforce cement concreter M15 grade kilometer stone of standard design as per IRC:8 fixing in position including painting and printing etc. as per drawing and technical specification clause 1703

-

-

-

... More
(ii)Ordinary Kilometer Stone (precast)

5

-

3140.66

... More
(ii) 5 Kilometer Stone (Precast)

1

-

3371

... More
(iii) 200 m Stone (precast)

20

-

883.33

... More
Referance Pillar Reinforced cement concrete M15 grade boundary pillars/local stone of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting as per drawing and Technical Specification Clause 1704

118

-

116.6

... More
Pucca Drain in Stone Masonry 1:4 length of 87.22m

-

-

-

... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides complete (I) Ordinary Soil (II) 3.0m depth

50.59

-

286.72

... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.) Levelling course below wall and Wearing layer inside drain

7.85

-

8092.69

... More
Stone Masonary Work in cement mortar Substructure complete as per drawing and technical specification Clause 702,704,1202, and 1204. Stone Masonry in 1:4 Cement Mortar Drain

18.32

-

5329.54

... More
Plastering with cement mortar (1:3) on brick work in sub structure as per technical specification

130.83

-

530.84

... More
Surface Drain in soil

-

-

-

... More
Construction of unlined surface drains of average cross-sectional area 0.40 sqm in soil to specified lines, grades, levels and dimensions. etc as per Technical Specification Clause 307. (i) By Manual Means

2796

-

60

... More
SINGLE HUME PIPE CULVERTS (WITH CATCHPITS) : 10 Nos

-

-

-

... More
Earthwork in excavation for structures Excavation of Structures (Earth Work in excavation of foundatio of structures as per drawing and technical specifications, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling in trenches with excavated suitable materials

792.56

-

286.72

... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.) Levelling course below wall

34.5

-

8092.69

... More
Back filling in foundation trenches as per drawing and technical specifications Cl 1108

29.23

-

2347.28

... More
Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row. Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106. (B) 1000mm dia

43.75

-

10697.22

... More
Stone Masonry Work in cement mortar in Head walls Sub Structure complete as per drawing and technical specification Clasue 1109. Stone Masonry in 1:5 cement mortar

262.5

-

6689.54

... More
Plastering with cement mortar (1:3) on brickwork in substructure as per technical specification.

417.17

-

530.84

... More
Providing and laying filter media with granular crushed aggregates behind abutments complete as per drawing and technical specifications

60.48

-

2856.24

... More
DOUBLE OPENING HUME PIPE CULVERT : 1 Nos

-

-

-

... More
Earthwork in excavation for structures Excavation of Structures (Earth Work in excavation of foundatio of structures as per drawing and technical specifications, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling in trenches with excavated suitable materials

58.14

-

286.72

... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.) Levelling course below wall

3.51

-

8092.69

... More
Bedding for Pipe i. Type A (Concrete Cradle) Bedding Laying concrete cradle bedding with M15 Grade Cement Concrete as per Clause 1105 (ii) Nominal mix 1:3.6 (Hand mixing)

6.41

-

1204.8

... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106.

6.25

-

21284.76

... More
Stone Masonry Work in cement mortar in foundation of Head walls complete as per drawing and technical specification Clasue 1109 In 1:4 cement mortar

45.43

-

6689.54

... More
Providing and laying boulders apron for bed protection with stone boulders of minimum size and weight as per table 1300.1, no frafment weighing less than 25kg laid dry complete as per drawing and technical specifications clause 1301

12.08

-

1599.8

... More
Plastering with cement mortar (1:3), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204

55.41

-

530.84

... More
Providing Weep Holes in Brick masonry/ Stone masonry, Plain/ Reinforced concrete abument, wing wall, return wall with 100mm dia AC pipe extending through the full width of the structures with slope of 1(V): 20 (H) towards drawing face complete as per drawings

24

-

494.8

... More
(1.5m Span) SLAB CULVERT-2nos

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

72.73

-

286.72

... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.) Levelling course below wall

8.13

-

8092.69

... More
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8

13.73

-

2856.24

... More
Providing Concrete (M-15) for Plain Concrete in foundation complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203

27.55

-

7761.79

... More
Plain/Reinforced Concrete inin open foundations complete as per drawing and Technical specification .Nominal mix (1:2.5:5)

14.58

-

7985.64

... More
Supplying, Fitting and Placing TMT Bar Reinforcement in Superstructure including cost of Steel Material and carriage etc. complete as per Drawing and Technical Specification Clause 1002, 1005, 1010, and 1202 of Specification of Rural Roads

1.44

-

83600.75

... More
Stone Masonry Work in cement mortar in foundation of Head walls complete as per drawing and technical specification Clasue 1109 In 1:4 cement mortar In Abutments

13.26

-

5329.54

... More
Stone Masonry Work in cement mortar in foundation of Head walls complete as per drawing and technical specification Clasue 1109 In 1:4 cement mortar Return Walls

10.51

-

5329.54

... More
Providing Weep Holes in Brick masonry/ Stone masonry, Plain/ Reinforced concrete abument, wing wall, return wall with 100mm dia AC pipe extending through the full width of the structures with slope of 1(V): 20 (H) towards drawing face complete as per drawing

24

-

494.8

... More
20mm thick Open Graded Premix Carpet using Bitminous Emuslion as per Clause 508.2 Providing , laying and rolling of open graded premix carpet of 20mm thickness composed of 13.2mm to 5.6mm aggregrates either using penetration grade bitumen or emulsing to required line, grade and leel to serve as wearing course on a previoiusly prepared base including mixing in a suitable palnt, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clasue 508

21.84

-

224.6

... More
SEAL COAT: Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, using cold emulsion grade and cross fall as per Technical Specification Clause 510

21.84

-

90.22

... More
Providing Concrete (M-25) for Plain/Reinforced Concrete in Superstructure complete for height upto 5 m as per drawing and Technical specification clause 802, 804, 805, 1202,& 1204 of specifiaction of Rural Roads including curing complete

20.44

-

10538.23

... More
Drainage Spouts complete as per drawing and technical specification Clause 1209

4

-

1458.86

... More
SLAB CULVERT(3.00m Span) -1nos

-

-

-

... More
Providing Concrete (M-25) for Plain/Reinforced Concrete in Superstructure complete for height upto 5 m as per drawing and Technical specification clause 802, 804, 805, 1202,& 1204 of specifiaction of Rural Roads including curing complete

0.03

-

10538.23

... More
PCC M15 levelling Course below approach slab

3.38

-

7975.73

... More
RCC M25 approach slab including reinforcement

9.66

-

15341.15

... More
Construction of RCC railing in M25 grade in cast in Situ

7

-

4703.49

... More
Providing CC wearing Coat

2.78

-

18363.34

... More
4.00m Span) SLAB CULVERT(-1nos

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

238.69

-

286.72

... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.) Levelling course below wall

13.2

-

8092.69

... More
Plain/Reinforced Concrete in substructure complete as per drawing & technical specification. Nominal mix (1:2.5:5)

163.34

-

8937.64

... More
Supplying, Fitting and Placing TMT Bar Reinforcement in Superstructure including cost of Steel Material and carriage etc. complete as per Drawing and Technical Specification Clause 1002, 1005, 1010, and 1202 of Specification of Rural Roads

1.65

-

83600.75

... More
Providing Weep Holes in Brick masonry/ Stone masonry, Plain/ Reinforced concrete abument, wing wall, return wall with 100mm dia AC pipe extending through the full width of the structures with slope of 1(V): 20 (H) towards drawing face complete as per drawings

74

-

494.8

... More
Providing Concrete (M-25) for Plain/Reinforced Concrete in Superstructure complete for height upto 5 m as per drawing and Technical specification clause 802, 804, 805, 1202,& 1204 of specifiaction of Rural Roads including curing complete

16.31

-

10538.23

... More
Drainage Spouts complete as per drawing and technical specification Clause 1209

4

-

1458.86

... More
20mm Joint filler

10.3

-

5212.86

... More
PCC M15 levelling Course below approach slab

3.38

-

7975.73

... More
RCC M25 approach slab including reinforcement

9.66

-

15341.15

... More
Construction of RCC railing in M25 grade in cast in Situ

9

-

4703.49

... More
Providing CC wearing Coat

3.56

-

18363.34

... More
PROTECTION WORKS: Construction of SM Rwall - 3.8m high 24m

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, etc.

64.8

-

286.72

... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.) Levelling course below wall

12.9

-

8092.69

... More
Stone manasory work in cement morter 1:5 in Retaining wall

98.04

-

5329.54

... More
Stone manasory work in cement morter 1:5 in Guard walls

8.64

-

5329.54

... More
Plastering with cement mortar (1:3), in substructure as per technical specifications

74.4

-

530.84

... More
Providing Weep Holes in Brick masonry/ Stone masonry, Plain/ Reinforced concrete abument, wing wall, return wall with 100mm dia AC pipe extending through the full width of the structures with slope of 1(V): 20 (H) towards drawing face complete as per draw

1187

-

494.8

... More
Providing and laying filter media with granular crushed aggregates behind abutments complete as per drawing and technical specification

43.2

-

2856.24

... More
PROTECTION WORKS: Construction of SM Rwall - 4.6m high 54m

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, etc.

155.52

-

286.72

... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.) Levelling course below wall

29.16

-

8092.69

... More
Stone manasory work in cement morter 1:5 in Retaining wall

267.03

-

5329.54

... More
Stone manasory work in cement morter 1:5 in Guard walls

19.44

-

5329.54

... More
Plastering with cement mortar (1:3), in substructure as per technical specifications

167.4

-

530.84

... More
Providing Weep Holes in Brick masonry/ Stone masonry, Plain/ Reinforced concrete abument, wing wall, return wall with 100mm dia AC pipe extending through the full width of the structures with slope of 1(V): 20 (H) towards drawing face complete as per drawing

2671

-

494.8

... More
Providing and laying filter media with granular crushed aggregates behind abutments complete as per drawing and technical specification

97.2

-

2856.24

... More
LS Bridge 25.84m span at Ch.1925m SUPERSTRUCTURE

-

-

-

... More
PCC M15 levelling Course

4.07

-

7975.73

... More
RCC M25 approach slab including reinforcement

8.51

-

15341.15

... More
PROTECTION WORKS

-

-

-

... More
Providing and laying boulder pitching on slopes laid obver prepared filter media as per drawing and technical specifications .Clause 1302

376.51

-

551

... More
Providing and laying filter media underneath stone pitching in slope as per drawing and technical specifications .Clause 1302

187.72

-

2598

... More
Maintanance Cost for (i) NH-127(B) Road (Nongchram) to Rongdu Dabitgittim (L= 5.10Km)

-

-

-

... More
1st year Maintanance Cost

5.1

-

112733.88

... More
2nd Year Maintanance Cost

5.1

-

123732.31

... More
3rd Year Maintanance Cost

5.1

-

136105.54

... More
4th Year Maintanance Cost

5.1

-

149853.58

... More
5th Year Maintanance Cost

5.1

-

164976.41

... More
Maintenance Cost for (ii) Dorangre (Dorrangre) to Nangalbibra (L= 5.00Km)

-

-

-

... More
1st Year

5

-

33140

... More
2nd Year

5

-

49710

... More
3rd Year

5

-

66280

... More
4th Year

5

-

82850

... More
5th Year

5

-

99420



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.