Pradhan Mantri Gram Sadak Yojana Tender

View complete overview of Meghalaya PMGSY Tender

Pradhan Mantri Gram Sadak Yojana - PMGSY Tender

Works
Eprocure
Opening Date2 Apr 2019
Closing Date3 May 2019
Tender Amount₹ 8,36,59,074 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Un-Lined Surface Drain

-

-

-

... More
(i). Surface drain in ordinary soil construction of unline surface drain of average crossection area 0.40 sqm in ordinary rock...etc. complete (B). Mechanical Means

1287.5

-

19

... More
(ii). Surface Drains in Ordinary Rock Constructionofunlinedsurfacedrainofaveragecross-sectionalarea0.4sqminordinaryrocktospecifiedlines,grades,levelsanddimensionsasperapproveddesignandTechnicalSpecificationClause307.Excavatedmaterialtobeusedinembankment at site. (B). Mechanical Means

3862.5

-

43

... More
Protection Works

-

-

-

... More
Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious…etc I.Ordinary soil (i).Upto 3 m depth

982.3

-

265

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 I. Coursed rubble masonry (1st sort) (iii). In cement mortar (1:5)

1975.14

-

4713

... More
Providing and laying Filter material with granular crushed aggregate as per specification to a thickness of less than 600mm ….etc

396

-

2064

... More
Plastering with cement mortar (1:4), 15mm thick on brickwork in substructure as per Technical specification Clause 613.4 &b1204

501.84

-

267

... More
Construction of Slab Cover Drain

-

-

-

... More
Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious…etc I.Ordinary soil (i).Upto 3 m depth

77.63

-

265

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (i) P.C.C grade M 10 (ii). Nomonal Mix 1:3:6 (hand mixing)

10.13

-

5956

... More
Stone masonry work in cement mortar I foundation complete as per drawing & technical specification Clauses 702, 704, 1202 and 1203 I. Course rubble masonry ( 1st sort ) (iii).In 1:4 cement mortar

33.75

-

5142

... More
Plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803…..etc III P.C.C grade M 20 (ii). Nomonal Mix 1:2:4 (hand mixed)

12.76

-

7089

... More
Supplying, fitting and placing HYSD bar reinforcement in foundation…etc complete as directed

2.52

-

79954

... More
Construction of Pucca/ line drain

-

-

-

... More
Excavation in Structures Earthwork in excavation for structures as per drawing and technical specification Clause 305.1including setting out ….etc I. Ordinay Soil (i). Upto 3m depth

506.56

-

256

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (i) P.C.C grade M 10 (ii). Nomonal Mix 1:3:6 (hand mixing)

236.39

-

5956

... More
Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204

1575.97

-

267

... More
NP3 HPC ( 15 Nos)

-

-

-

... More
Excavation for structures Earth work in excavation for foundation of structure upto 3m upto as per drawing and technical specification …………… etc 'By manual means. I) Ordinary Soil

1190.4

-

256

... More
Bedding for pipe Type A (Concrete Cradle)Bedding Laying concrete cradle bedding with M15 grade cement concrete as per clause 1105(i) II. P.C.C grade M15 i)Nominal mix 1:2.5:5

78.9

-

6218

... More
Providing and laying RCC pipe NP3 as per design in Single Row Providing and laying R C C pipe NP3 for culvert on 1st class bedding ….etc. B. 1000mm dia

93.75

-

8091

... More
Stone masonry work in cement mortar in foundation of head walls complete as per drawing and technical specification…. Etc A) in 1:4 Cement mortar

549

-

3782

... More
Providing and laying Filter material with granular crushed aggregate as per specification to a thickness of less than 600mm ….etc

81

-

2064

... More
Plastering with cement mortar (1:4), 15mm thick on brick wall …….etc

449.7

-

267

... More
Filling in foundation trenches as per drawing and technical specification clause 1108 II. . Earth filling (for marshy soil)

86.7

-

156

... More
8.00M Span Culvert

-

-

-

... More
Excavation for Structures: Earthwork in excavation for structures as per drawing and technical specifications Clause305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50m, dressing of side sand...etc II. Ordinary rock (not requiring blasting). Upto 3 m depth

512.26

-

321

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 I. PCC Grade M10 (i). Nominal Mix 1:3:6

60.8

-

6341

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 III. PCC Grade M20 (i). Nominal Mix 1:2:4

632.3

-

7119

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical pecifications Clauses 802, 804, 805, 806, 807, 1202 ans 1204. IV. RCC Grade M25

5.69

-

8611

... More
Providingandlayingreinforcedcementconcreteinsuperstructureasperdrawingandtechnical specifications Clauses 800, 1205.4 and 1205.5 II. R.C.C M 25

35.44

-

9236

... More
ConstructionofR.C.C.railingofM25gradeincast-in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre spacing between vertical posts not to exceed 2000 mm as per drawing and technical specifications Clauses 800, 900 and 1208.3

18

-

3081

... More
P.C.C.M15ordinarygrade(1:2.5:5) levelling course below approach slab complete as perdrawing and technical specifications Clauses 800 and 1211 (ii).Nominal mix 1:2.5:5 (Hand mixing)

5.4

-

5950

... More
ReinforcedCementConcreteM25gradeapproachslabincludingreinforcementandformwork complete as per drawing and technical specifications Clauses 800 and 1211

10.8

-

13300

... More
Providing and laying cemen tconcrete wearing course M30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3

1.35

-

14735

... More
Supplying,fitting,andplacingHYSDbarreinforcementinsuperstructurecompleteasperdrawing and technical specifications Clauses 1002, 1010 and 1202

5.458

-

81275

... More
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of notless than 600 mm with smaller size toward the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8

96.32

-

2064

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 II. Sandy material

101.28

-

1569

... More
Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wingwall, returnwall with 100mm dia AC pipe extending through the full width of the structures withslope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

100

-

491

... More
Drainage spouts complete as per drawing and technical specifications Clause 1209

8

-

1450

... More
Providing and laying of an elastomeric slab seal expansion joint complete as per approved drawing and approved specifications tobe installed by manuacturer/supplier or their authorised representative ensuring compliance to the manufacturer’s instructions for installlation and as per technical specifications Clause 1207.2.5

12

-

30596

... More
Plastering with Cement Mortar (1:4), 15mm thick on brick work in substructure as pertechnical specification

66.14

-

267

... More
Painting Two Coats on New Concrete Surfaces: Paintingtwocoatsincludingprimercoatafterfillingthesurfacewithsyntheticenamelpaintinallshadesonnew,plastered/concretesurfacesasperdrawingandTechnicalSpecification Clause 1701 Painting on Steel Surfaces

66.14

-

141

... More
Flexible Pavement

-

-

-

... More
Clearing grass and removal of rubbish up to a distance of 30 m outside the periphery of the area as per Technical Specification Clause 201.

3.591

-

11999

... More
Construction of Subgrade and earthen shoulder Construction of subgrade and earthen shoulder with appoved materials obtained from borrow pit with all lift and leads……etc

14362.46

-

320

... More
Granular Sub-base with Well Graded Material (Table 400.1) (A).By Mix in Place Method (ii).For Grading II Material Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting ...etc (A).By Manual Means

3110.37

-

1310

... More
3).WBM Grading 3 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 ….etc. (A).By Manual Means

2827.61

-

2696

... More
Prime Coat (i). Low porosity Providing and applying primer coat with bitumen emulsion ( SS-1) on prepared surface of granular base including cleaning of road surface etc

18850.73

-

33

... More
Tack Coat (iii).Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surface treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503.

18850.73

-

16

... More
20 mm thick Open Graded Premix Carpet using Bitumen Emulsion as per Technical Specification Clause. 508.2 Providing laying and rolling of open graded premix carpet of 20mm thickness composed of 13.2mm to 5.6mm agreggate ……etc,. As per technical specification clause 508

18850.73

-

199

... More
Providing and laying seal coat sealing the voids in bituminous surface laid to specified level, , using cold emulsion grade and cross fall as per technical specification Clause 510

18850.73

-

70

... More
Traffic Signs,Markings and other Road Appurtenances

-

-

-

... More
Providing and fixing Logo of PMGSY Project. Providing and fixing of typical PMGSY informatory signboard with logo per MORD specifications and drawing…etc

4

-

36368

... More
Kilometer Stone Reinforced cement concrete M 15 grade kilometer stone / local . Specification Clause 1703 i) 5th Kilometer Stone (pre-cast)

1

-

4871

... More
ii) Ordinary Kilometer Stone (Precast)

6

-

2842

... More
iii) 200 m stone (precast)

24

-

799

... More
(i).Loading of Lime, Aggregate, Stone Boulder, Brick Aggregate,…etc

-

-

-

... More
For Stone -

3796.5

-

105

... More
For GSB & Stone Metal & Chips

8759.94

-

105

... More
For Binding materials -

226.21

-

105

... More
(ii). Loading of earth sand, Moorum, manure, flyash by manual means including a lead upto 30m

-

-

-

... More
For Sand-

798.52

-

53

... More
(iii).Unloading of Lime, Aggregate, Stone Boulder, Brick Aggregate, Kankar, Building Rubbish,Crushed Slag, Stone for Masonry Work by manual means..etc

-

-

-

... More
For Stone -

3796.5

-

53

... More
For GSB & Stone Metal & Chips

8759.94

-

53

... More
For Binding materials -

226.21

-

53

... More
(iv).Unloading of earth sand, Moorum, manure, flyash by manual means including a lead upto 30m

-

-

-

... More
For Sand-

798.52

-

33

... More
Loading and Unloading of Bitumen drum by Manual Means to lead 30.00m

-

-

-

... More
(i). Loading of bitumen drum by manual means to lead 30.00m

80.68

-

169

... More
(ii). Unloading of bitumen drum by manual means to lead 30.00m

80.68

-

157

... More
Loading and Unloading of Hume Pipes (i). Loading of RCC Hume pipeby mechanical means to lead 30.00m

45

-

74

... More
(ii).Un-Loading of RCC Hume pipeby mechanical means to lead 30.00m

45

-

307

... More
Haulage excluding loading and unloading (i) Haulage of materials by tipper excluding cost of loading and unloading and stacking…....etc Case-I : Surfaced Road

-

-

-

... More
For Stone & Chips -Quarry at 5th Km of MB Road, Ave. Lead= 36.00 Km Case-I Surface Road = 36.00Km

400254.26

-

6

... More
For Sand- Quarry at 6th Km of MN Road, Ave. Lead=31.00Km Case-I Surface Road = 31.00Km

45547.52

-

6

... More
For GSB & Stone Metal - Quarry at 23rd km of Shillong Sohra Road., Ave. Lead= 49.00Km Case-I Surface Road = 49.00Km

989960.48

-

6

... More
For Binding Material-Quarry at 6th Km of MN Road, Ave. Lead= 31.00Km Case-I Surface Road = 31.00Km

12903.02

-

6

... More
For Bitumen- Factory at Guwahati, Ave. Lead= 197.00Km Case-I Surface Road = 197.00Km

15893.96

-

6

... More
C). Hume Pipe NP3 A. 1000 dia Hume pipe

-

-

-

... More
: Quarry from 6th km of Shillong jowai Road Ave. Lead = 32.00 Km

2886

-

6

... More
Maintenance

-

-

-

... More
Year - I

6

-

83100

... More
Year - II

6

-

138600

... More
Year - III

6

-

291000

... More
Year - IV

6

-

374100

... More
Year - V

6

-

498800

... More
Year - VI Renewal Plan

6

-

1918666.67



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.