Pradhan Mantri Gram Sadak Yojana Tender

View complete overview of Meghalaya PMGSY Tender

Pradhan Mantri Gram Sadak Yojana - PMGSY Tender

Works
Eprocure
Opening Date2 Apr 2019
Closing Date3 May 2019
Tender Amount₹ 3,65,74,511 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Setting Out with: (i) Reference Benchmark 1 no. (ii) Working Benchmark 4 nos. per km. and near all drainage structure and bridges (iii) Reference Pillars / Burjees @ 50m interval on both sides of the formation width (iv) The marking of center line, setting out curves and recording of levels, etc. by the surveyor will be incidental to the work and no extra payment shall be made for the same.

3.2

-

107944.14

... More
Earthwork

-

-

-

... More
Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections.

6338

-

58

... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (used 60% of total cutting material)

5584.5

-

69

... More
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification clause-303.1 (a) Subgrade in CC & Flexible Pavement

1183.5

-

320

... More
(b) Earthen Shoulder in Flexible Pavement

2909.3

-

320

... More
Sub Base and Base Courses (Non-Bituminous)

-

-

-

... More
Granular Sub-base with Well Graded Material (Table 400.1) A. By Mix in Place Method Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. i) For Grading II material

1320

-

2920.52

... More
Add for Extra Widening for .6m width

65.65

-

2920.52

... More
Add for Extra Widening for .9m width

9.96

-

2920.52

... More
Add for Vehicular Passing

90

-

2920.52

... More
Water Bound Macadam Sub-base/base with Crushable Screenings

-

-

-

... More
WBM Grading II , By Manual Means Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405.

720

-

4133.6

... More
Add for Extra Widening for .6m width

39.39

-

4133.6

... More
Add for Extra Widening for .9m width

5.98

-

4133.6

... More
Add for Vehicular Passing

54

-

4133.6

... More
WBM Grading III, By Manual Means Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.

720

-

4339.6

... More
Add for Extra Widening for .6m width

39.39

-

4339.6

... More
Add for Extra Widening for .9m width

5.98

-

4339.6

... More
Add for Vehicular Passing

54

-

4339.6

... More
Bituminous Surface Courses

-

-

-

... More
Prime Coat (i) High porosity Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 1.2-1.5 kg/sqm using mechanical means as per Technical Specification Clause 502.

9600

-

73.2

... More
Add for Extra Widening for .6m width

525.16

-

73.2

... More
Add for Extra Widening for .9m width

79.67

-

73.2

... More
Add for Vehicular Passing

720

-

73.2

... More
Tack Coat with Bitumen Emulsion (iii) Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503.

9600

-

16.54

... More
Add for Extra Widening for .6m width

525.16

-

16.54

... More
Add for Extra Widening for .9m width

79.67

-

16.54

... More
Add for Vehicular Passing

720

-

16.54

... More
20 mm thick Open Graded Premix Carpet using Bituminous emulsion as per Technical Specification Clause 508.2 (cold mix)

9600

-

239.69

... More
Add for Extra Widening for .6m width

525.16

-

239.69

... More
Add for Extra Widening for .9m width

79.67

-

239.69

... More
Add for Vehicular Passing

720

-

239.69

... More
Seal Coat Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510 of Specification of Rural Roads. Type C

9600

-

75.64

... More
Add for Extra Widening for .6m width

525.16

-

75.64

... More
Add for Extra Widening for .9m width

79.67

-

75.64

... More
Add for Vehicular Passing

720

-

75.64

... More
Providing and laying pitching on slopes as per drawing and technical specifications Clause 1302

-

-

-

... More
Stone pitching

496.1

-

2015.14

... More
Traffic sign

-

-

-

... More
B. Semi Reflective Traffic Signs Providing and fixing of semi reflective cautionary, mandatory and informatory sign board as per IRC:67 made of 1.5 mm thick MS Sheet duly stove white colour in front and gray colour on back with red reflective border of 65 mm width and required letters and figures with reflective tape engineerring grade as per clause 1701.3.9 of MORD for Rural Roads of required shade andcolour supported and welded on 47 mm x 47 mm x 12 SWG sheet tube firmly fixed to the ground by means of properly designed foundations with M15 grade cement concrete 450 x 450 x 600 mm , 600 mm below ground level as per approved drawing cl. 1701.2.2 I) 900 mm equilateral triangle

34

-

3794.97

... More
III) 600 mm circular

8

-

3606.97

... More
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 of Specification of Rural Roads.

-

-

-

... More
ii) Ordinary Kilometer Stone (Precast)

5

-

3337.07

... More
iii) 200 m stone (precast)

13

-

888.95

... More
(I) Providing and Fixing 'Logo' of PMGSY Project Providing and fixing of typical PMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube. All M.S. will be stove enameled on both sides. Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1

1

-

36909.54

... More
(II) Providing and fixing of Citizen's Information Board Providing and fixing of typical Citizens' Information Board with Logo as per MORD specifications and drawing. Two nos. 1.6 mm thick MS sheet duly welded with 5mm thick steel plate on back on edges. The 4 nos. steel plate will be welded horizontally with 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 600mm x 600mm x 750mm, 750mm below ground level. The 2 nos. steel plate will be welded vertically to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly welded to vertical tubes. All M.S. will be stove enameled on both sides. Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1

1

-

36909.54

... More
Erosion Control

-

-

-

... More
Turfing with Sods Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or as directed by the Engineer including preparation of ground, fetching of sods and watering as per Technical Specification Clause 309.

7842.07

-

85

... More
a. Guide Post

-

-

-

... More
Earth work in Excavation for structures

10.45

-

256

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 lI)Plain cement concrete M 20 grade

8.55

-

8052.89

... More
RCC M15 Grade

3.59

-

8052.89

... More
b.Gabion Wall

-

-

-

... More
Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

385

-

537.6

... More
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301

1050

-

4553.92

... More
Providing and laying non woven geo textile as filter media etc

870

-

84

... More
Loading and Unloading of Lime, Aggregate, Stone Boulder, Brick Aggregate, Kankar, Building Rubbish, Crushed Slag, Stone for Masonry Work by Manual Means

-

-

-

... More
(i).Loading of Lime, Aggregate, Stone Boulder, Brick Aggregate, Kankar, Building Rubbish, Crushed Slag, Stone for Masonry Work by manual means including a lead upto 30 m

1050

-

117.6

... More
(iii).Unloading of Lime, Aggregate, Stone Boulder, Brick Aggregate, Kankar, Building Rubbish, Crushed Slag, Stone for Masonry Work by manual means including a lead upto 30 m

1050

-

59.36

... More
Haulage of materials by tipper excluding cost of loading, unloading and stacking.

-

-

-

... More
Case-I: Surfaced Road

86625

-

6.72

... More
Case-III: Katcha Road

1575

-

16.8

... More
CD Work

-

-

-

... More
Foundation

-

-

-

... More
Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. I. Ordinary Soil (i) Upto 3 m depth

198.48

-

256

... More
Providing concrete for plain/ reinforced concrete in open foundation complete as per drawing and technical specification clause 802,803,1202,1203. I) PCC grade M 10 (i) Nominal Mix 1:3:6

10.08

-

8346.75

... More
Substructure

-

-

-

... More
Plain/reinforced cement concrete in substructure for Abutment/Pier Cap & Durtwall complete as per drawings and technical specification Clauses 802,804,805,806,807,1202 and 1204 - upto 5m height (I) PCC Grade M 15

100.68

-

8411.89

... More
Pointing with cement mortar (1:3) on brickwork as per drawing and technical specification Clauses 613.3 and 1204

9.48

-

129.27

... More
Bedding for Pipe (iii) Type A (First Class)conc Bedding laying conc bedding with M15 grade cement conc as per clause 1105(i)

28.38

-

8175.89

... More
Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106. (B) 1000 mm dia

60

-

9379.76

... More
Protection Works

-

-

-

... More
Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 (I) Stone / Boulder

44.58

-

2015.14

... More
Providing and laying filter material underneath pitching in alopes complete as per drawing and technical specification

10.86

-

4077.84

... More
Maintenance

-

-

-

... More
1st year

3.2

-

96468.75

... More
2nd year

3.2

-

144703.13

... More
3rd year

3.2

-

192937.5

... More
4th year

3.2

-

241171.88

... More
5th year

3.2

-

289406.25

... More
6th year Renewal Plan

3.2

-

1736562.5



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.