Get tender documents at just ₹200 per tenderKnow More
Search made simple for latest tendersNo hidden charges. No keyword restrictionsExplore Our Plansor Pay Per Tender

Bid Number: GEM/2019/B/319357 Dated: 12-08-2019 Bid Document Bid Details Bid End Date/Time 19-08-2019 16:00:00 Bid Life Cycle (From Publish Date) 90 (Days) Bid Offer Validity (From End Date) 60 (Days) Ministry/State Name Ministry Of Home Affairs Department Name Central Armed Police Forces Organisation Name Border Security Force (bsf) Office Name Ftr Hq Bsf Shillong Total Quantity 2 Item Category Online UPS Experience with Government Required 20 Year (s) MSE Exemption For Years Of Experience And Turnover Yes Startup Exemption For Years Of Experience And Turnover Yes Document required from seller Experience with Government,Annual Turnover,Certificate (Requested in ATC),OEM Authorization Certificate,OEM Annual Turnover Bid to RA enabled No Online UPS ( 2 pieces ) Technical Specifications * As per GeM Category Specification Specification Specification Name Values Bid Requirement (Allowed Values) GENERIC Rating in KVA (KVA) 2.0 KVA 2.0 KVA Technology IGBT-PWM without inbuilt isolation transformer IGBT-PWM without inbuilt isolation transformer Input Power single phase 160V - 260V sinewave,50Hz single phase 160V - 260V sinewave,50Hz Output power Single phase 230V +/-1% sinewave 50 Hz Single phase 230V +/-1% sinewave 50 Hz 1 / 4 Backup time (Minutes) 60 60 Minimum VAH (VAH) 3204 3200, 3204 Warranty for UPS (Years) 2 2 Movable trolly for Batteries Without trollery but with rack Without trollery but with rack Warranty for battery 2 2 Degree of Protection IP20 IP20 Cabling 5 meters for input and out put With With Paralleling kit for synchronising Without Without Installation and Commissioning Yes * CONSTRUCTIONAL Minimum thickness of M.S.Sheet Enclosure duly painted (mm) 1.2 * Type of Battery SMF-VRLA conforming to JISC:8702(Pt.I,II&III) * FUNCTIONAL Maximum overshoot and Under shoot of output rated voltage 4 * Voltage Regulation from no load to full load (%) < / = 3% * 20% Overload limit for minimum 10 minutes Yes Yes Overall Efficiency (%) >/=90% >/=90% Total Harmonic Distortion(THD) (%) Maximum 3% * 50% Overload limit for minimum 1 minutes Yes Yes PROTECTION Protection for under voltage at battery terminal at 10.5V per 12 V battery. Yes * Protection of Over voltage,Short Circuit & over load at UPS output terminal Yes * METERING AND INDICATIONS Digital Metering in UPS for AC Input Voltage,Output AC Volt Yes * 2 / 4 age,Current,Frequency, Battery Voltage and Current Indicators for mains presence,Battery charging and discharging,Output Over Load, Low Battery Voltage Yes * REPORTS AND CERTIFICATION Damp Heat : in accordance with IS:9000(part 5/sec.2)1981 at Temperature of 40 degree C,two cycles of (12+12) hours each 2007) Yes * Dry Heat Test : in accordance with IS:9000 (part 3/sec.5)1977 (reaffirmed 2007) at 55 degree C for 16 hrs Yes * Cold Test : in accordance with IS:9000 (Part 2/Sec.4)1977 (Reaffirmed 2007) at -10 degree C for 4 hrs. Yes * Availability of the Type Test Report from Central Govt. /NABL/ILAC Accredited lab covering all technical requirements. Yes * Type Test Certificate No. - * Type Test Certificate date - * Name of Lab - * Address of Lab - * As per Meity (Government of India) guidelines UPS shall have valid BIS CRS certifications as applicable Yes * * Bold specifications are the golden parameters. * Bidders may note that In respect of non-golden Parameters, the specifications 'Values' chosen by Buyer will generally be preferred over 'Bid requirement ( allowed Values) by the Buyer. Consignees/Reporting Officer and Quantity 3 / 4 S.No. Consignee/Reporti ng Officer Address Quantity Delivery Days 1 Anil Kumar 793006,FTR HQ BSF,SHILLONG,UMPLING, EAST KHASI HILLS, SHILLONG 2 30 EMD Detail Required No ePBG Detail Required No Splitting Bid splitting not applied. Buyer Specific Additional Terms and Conditions 1.Office of the Service Provider is required to be located at a place near to the consignee(use

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.