Meghalayan Age Limited Tender
View complete overview of Meghalaya Meghalayan Age Limited Tender
Meghalayan Age Limited Tender
Civil And Construction
Building Construction
Eprocure
Opening Date10 Oct 2024
Closing Date11 Nov 2024
Tender AmountRefer Documents
Costs
EMD
₹ 80,00,000Document Cost
₹ 10,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_MANDB_1597_1Bid Award Id
ViewTender No
SSCM/CE/TB-11/2024-25/64Tender Authority
Meghalayan Age Limited ViewPurchaser Address
-Website
http://meghalayatenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Initial Environmental Examination
BOQ Items
Skills and training facilities
2899
-
-
Industry Co-locator building
995
-
-
MSIH Admin
865
-
-
Hostel
1073
-
-
Guest House
440
-
-
Engineering Services
-
-
-
Electrical Substation:
-
-
-
Design, supply and erection of substation, transformers, breakers, earthing, metering, changeover (with provision of solar panels), panels and all equipment (1000 KVA)
1
-
-
DG Sets
-
-
-
Design, supply and erection of Diesel Generator sets, necessary cabling, earthing (500 KVA)
1
-
-
UPS System
-
-
-
Design, supply and erection of UPS system, necessary panels cabling, earthing (3 KVA)
1
-
-
External Electrification and Lighting
-
-
-
External lighting, LED street lights and post top lighting for pathways and landscaped areas, external lighting of buildings, panels, cabling, earthing.
1
-
-
Underground Water tank
-
-
-
Design and construction of RC underground or surface water tanks for domestic and fire water supply, necessary pumps, piping, valves and associated electrical work.(100000 litres)
1
-
-
Fire Detection and Suppression Including Underground and Static Tanks & Pumps
-
-
-
Design, supply and construction of detection and suppression system, necessary pumps, piping, hydrants valves and associated electrical works, all complete required as per National Building Code as well as local fire authority guidelines.
1
-
-
Lifts
-
-
-
passenger lift with machine room, of specifications approved by Employer, including associated electrical works, excluding civil works of lift shaft and machine room
6
-
-
Central air conditioning
-
-
-
Central air conditioning with air/ water cooled system/ VRV as approved by Employer, including all insulation, piping , ducting , grilles, water softening, associated electrical and water supply works.
138
-
-
Site Development
-
-
-
Earthworks
-
-
-
Surface dressing, jungle clearance, shifting of utilities as required over the entire project site
2.29
-
-
Boundary Wall & Gate
-
-
-
The scope of work shall include:
Boundary wall at entrance of 573 m length and 1.8 m high with MS Grill.
1033
-
-
Entrance Gate with RCC portal of approved size and design over entrance points spanning dual carriage way, including cladding, lighting, signage and lettering of approved design.
2 MS gates of minimum size 6m wide and 2m height and 2 Pedestrian gates at entrance, 1.5m x 2m A guard house of minimum 3.6 m x 3.6m area of approved design.
1
-
-
Internal roads and Pavement
-
-
-
Roads and Parking
6825
-
-
Pavement
3215
-
-
Rainwater collection, harvesting and recycling
-
-
-
Total length of drain
1638
-
-
RCC rain water tanks-underground or surface(50000 litre)
1
-
-
External Sewerage and Sewage treatment
-
-
-
TOTAL length of main sewerage
system (upto first manhole
included in building cost)
989
-
-
Design and construction of
Sewage Treatment plant
1
-
-
External water supply including borewells and pump
-
-
-
Borewell and Pumps of approved design
2
-
-
TOTAL length of filtered watersupply main (riser from gate valve shall be included in building)
308
-
-
TOTAL length of recycled
water supply main (riser from gate valve shall be included in building)
1638
-
-
Pumps, valves chambers, filteration systems and associated work (pump house civil works will be measured in building rate)
1
-
-
Landscaping Work
-
-
-
Landscaping
2743
-
-
Peripheral and Roadside tree plantation
387
-
-
Woodland plantation trees,
hedges as per approved design
6696
-
-
Designs and Drawings
-
-
-
Complete Design and Drawings
for the entire project components
as described in
Section 6 of the bid document
1
-
-
Environmental management and monitoring
-
-
-
Ambient Air quality covering parameters of SO2, NOx, PM10, PM2.5 and Carbon monoxide at one location of maximum construction activity at MSIH construction site -one sample in pre-construction phase (immediately after mobilization) and 9 samples (one season each season except monsoon-3 samples per year) during construction phase
10
-
-
Ground Water quality /Drinking Water Quality at MSIH site covering parameters of Total dissolved solids, total suspended solids , pH, hardness, biochemical oxygen demand, and fecal coliform - one sample in pre-construction phase (immediately after mobilization) and 9 samples (one season each season except monsoon-3 samples per year) during construction phase
10
-
-
Noise Levels covering parameters of Leq (Day), Leq (Night), Lmax and Lmin at one location of maximum construction activity at Boundary Wall construction site – one sample in preconstruction phase (immediately after mobilization) and 9 samples (one season each season except monsoon-3 samples per year) during construction phase
10
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements