Design And Build Of Meghalaya Skills And Innovation Hub At New Shillong (package Cw-01)

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Skills and training facilities

2899

-

-

... More
Industry Co-locator building

995

-

-

... More
MSIH Admin

865

-

-

... More
Hostel

1073

-

-

... More
Guest House

440

-

-

... More
Engineering Services

-

-

-

... More
Electrical Substation:

-

-

-

... More
Design, supply and erection of substation, transformers, breakers, earthing, metering, changeover (with provision of solar panels), panels and all equipment (1000 KVA)

1

-

-

... More
DG Sets

-

-

-

... More
Design, supply and erection of Diesel Generator sets, necessary cabling, earthing (500 KVA)

1

-

-

... More
UPS System

-

-

-

... More
Design, supply and erection of UPS system, necessary panels cabling, earthing (3 KVA)

1

-

-

... More
External Electrification and Lighting

-

-

-

... More
External lighting, LED street lights and post top lighting for pathways and landscaped areas, external lighting of buildings, panels, cabling, earthing.

1

-

-

... More
Underground Water tank

-

-

-

... More
Design and construction of RC underground or surface water tanks for domestic and fire water supply, necessary pumps, piping, valves and associated electrical work.(100000 litres)

1

-

-

... More
Fire Detection and Suppression Including Underground and Static Tanks & Pumps

-

-

-

... More
Design, supply and construction of detection and suppression system, necessary pumps, piping, hydrants valves and associated electrical works, all complete required as per National Building Code as well as local fire authority guidelines.

1

-

-

... More
Lifts

-

-

-

... More
passenger lift with machine room, of specifications approved by Employer, including associated electrical works, excluding civil works of lift shaft and machine room

6

-

-

... More
Central air conditioning

-

-

-

... More
Central air conditioning with air/ water cooled system/ VRV as approved by Employer, including all insulation, piping , ducting , grilles, water softening, associated electrical and water supply works.

138

-

-

... More
Site Development

-

-

-

... More
Earthworks

-

-

-

... More
Surface dressing, jungle clearance, shifting of utilities as required over the entire project site

2.29

-

-

... More
Boundary Wall & Gate

-

-

-

... More
The scope of work shall include: Boundary wall at entrance of 573 m length and 1.8 m high with MS Grill.

1033

-

-

... More
Entrance Gate with RCC portal of approved size and design over entrance points spanning dual carriage way, including cladding, lighting, signage and lettering of approved design. 2 MS gates of minimum size 6m wide and 2m height and 2 Pedestrian gates at entrance, 1.5m x 2m A guard house of minimum 3.6 m x 3.6m area of approved design.

1

-

-

... More
Internal roads and Pavement

-

-

-

... More
Roads and Parking

6825

-

-

... More
Pavement

3215

-

-

... More
Rainwater collection, harvesting and recycling

-

-

-

... More
Total length of drain

1638

-

-

... More
RCC rain water tanks-underground or surface(50000 litre)

1

-

-

... More
External Sewerage and Sewage treatment

-

-

-

... More
TOTAL length of main sewerage system (upto first manhole included in building cost)

989

-

-

... More
Design and construction of Sewage Treatment plant

1

-

-

... More
External water supply including borewells and pump

-

-

-

... More
Borewell and Pumps of approved design

2

-

-

... More
TOTAL length of filtered watersupply main (riser from gate valve shall be included in building)

308

-

-

... More
TOTAL length of recycled water supply main (riser from gate valve shall be included in building)

1638

-

-

... More
Pumps, valves chambers, filteration systems and associated work (pump house civil works will be measured in building rate)

1

-

-

... More
Landscaping Work

-

-

-

... More
Landscaping

2743

-

-

... More
Peripheral and Roadside tree plantation

387

-

-

... More
Woodland plantation trees, hedges as per approved design

6696

-

-

... More
Designs and Drawings

-

-

-

... More
Complete Design and Drawings for the entire project components as described in Section 6 of the bid document

1

-

-

... More
Environmental management and monitoring

-

-

-

... More
Ambient Air quality covering parameters of SO2, NOx, PM10, PM2.5 and Carbon monoxide at one location of maximum construction activity at MSIH construction site -one sample in pre-construction phase (immediately after mobilization) and 9 samples (one season each season except monsoon-3 samples per year) during construction phase

10

-

-

... More
Ground Water quality /Drinking Water Quality at MSIH site covering parameters of Total dissolved solids, total suspended solids , pH, hardness, biochemical oxygen demand, and fecal coliform - one sample in pre-construction phase (immediately after mobilization) and 9 samples (one season each season except monsoon-3 samples per year) during construction phase

10

-

-

... More
Noise Levels covering parameters of Leq (Day), Leq (Night), Lmax and Lmin at one location of maximum construction activity at Boundary Wall construction site – one sample in preconstruction phase (immediately after mobilization) and 9 samples (one season each season except monsoon-3 samples per year) during construction phase

10

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.