Meghalayan Age Limited Tender

View complete overview of Meghalaya Meghalayan Age Limited Tender

Meghalayan Age Limited Tender

Services
Civil And Construction
Eprocure
Opening Date27 Nov 2024
Closing Date11 Dec 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Rfp For Supply And Installation Of Bio Toilets Dg Sets With Changeovers Octonorm And Bleachers On Hiring Basis For The 6th Meghalaya Games

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
NIT for Request for Proposal for Supply and Installation of Bio Toilets DG Sets with Changeovers Octonorm and Bleachers on hiring basis for the 6th Meghalaya Games
RFP for Supply and Installation of Bio Toilets DG Sets with Changeovers Octonorm and Bleachers on hiring basis for the 6th Meghalaya Games
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Reception

20

-

-

... More
Competition Venue (All Discipline except Football)

144

-

-

... More
Competition Venue (Football)

20

-

-

... More
DG SET 3 phase cabling, earthing, change over, distribution panel which is suitable for entire duration of the event, to run as per site requirement with capacity switch gear and distribution cables of adequate size and length, with all consumables, operation and maintenance for 6 days. The cost of fuel for running per hour is to be mentioned in respect of each of the DG Set. The final bills for fuel shall be verified against the running hours per day in respect of each DG Set. Cost of Genset to be consider with 8 hours of fuel.

-

-

-

... More
Accommodation Venue (All Discipline except Football)

-

-

-

... More
165 KVA

1

-

-

... More
125 KVA

5

-

-

... More
100 KVA

3

-

-

... More
75 KVA

2

-

-

... More
62.5 KVA

1

-

-

... More
45 KVA

7

-

-

... More
35 KVA

2

-

-

... More
25 KVA

2

-

-

... More
Accommodation Venue (Football)

-

-

-

... More
62.5 KVA

2

-

-

... More
Competition Venue (All Discipline except Football)

-

-

-

... More
62.5 KVA

3

-

-

... More
45 KVA

4

-

-

... More
35 KVA

3

-

-

... More
30 KVA

11

-

-

... More
25 KVA

4

-

-

... More
15 KVA

2

-

-

... More
Competition Venue (Football)

-

-

-

... More
62.5 KVA

1

-

-

... More
Cost of Deisel If the DG Set is running beyond 8 hours. Then the cost of fuel for running per hour is to be mentioned in respect of each DG Set. The final bills for fuel shall be verified against the running hours per day in respect of each DG Set.

-

-

-

... More
165 KVA

42.8

-

-

... More
125 KVA

32.1

-

-

... More
100 KVA

21.4

-

-

... More
75 KVA

16.1

-

-

... More
62.5 KVA

16.1

-

-

... More
45 KVA

10.7

-

-

... More
35 KVA

8.6

-

-

... More
30 KVA

6.4

-

-

... More
25 KVA

5.4

-

-

... More
15 KVA

3.2

-

-

... More
BLEACHER Bleachers should have a riser height of 0.45m and Tread of 1.20m. The front row should be raised by 1.20m.

-

-

-

... More
4 TIER (Football)

200

-

-

... More
4 TIER

40.8

-

-

... More
3 TIER

14.4

-

-

... More
Octonorm Panels SIZE Height -2.5 M (average size 4m x 3m / 3m x 3m) Partitions shall be made in prefabricated aluminum sections with laminated panels. And Laminated Doors with knob, lock and key for each rooms.

-

-

-

... More
Competition Venue (All Discipline except Football)

1400

-

-

... More
Competition Venue (Football)

60

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.