Meghalaya Basin Development Authority Tender
View complete overview of Meghalaya MBDA Tender
Meghalaya Basin Development Authority - MBDA Tender
Civil And Construction
Road Construction
Eprocure
Opening Date12 Oct 2022
Closing Date19 Oct 2022
Tender Amount₹ 20,79,700
Costs
EMD
₹ 41,594Document Cost
₹ 500Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_MIDFC_629_1Bid Award Id
ViewTender No
RKD/TB/WB/CERC/14/2022/03Tender Authority
Meghalaya Basin Development Authority ViewPurchaser Address
-Website
http://https://mbda.gov.in/roads
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
(iii) Stone masonry work in cement mortar 1:5 including loading, unloading and haulage
112.68
-
-
Boulders filling with stones/boulders of 150 - 200 mm size, 60 cm wide behind the abutments, wing walls, retaining walls etc. (supply and carriage of boulders within 200 m is also included) complete as per Technical Specifications. including loading, unloading and haulage
49.5
-
-
Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per Technical Specification Clause including loading, unloading and haulage
14.4
-
-
Construction of Hume Pipe Culverts
-
-
-
Earthwork in excavation of foundation of structure up to 3 m depth as per drawing and technical Specification including setting out, construction of shoring and bracing removal of stumps and other deleterious material and disposal up to lead of 50 m including dressing the side and bottom and backfilling in trenches etc as directed.
. BY MECHANICAL MEANS : II. Ordinary rock (not requiring blasting)
200.04
-
-
Bedding of Pipe (i) TYPE-A (Concrete Cradle) Bedding (ii) Nominal Mix 1:2:4 (Hand Mixing)
2.25
-
-
Providing and laying reinforced cement concrete pipe NP3 for culvert on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapet as per Technical Specification Clause 1106 including loading, unloading and haulage
12.5
-
-
Stone Masonry Work in cement mortar in foundation of head walls complete as per drawing and Technical Specification Clause 1109. (ii) In cement mortar 1 : 4 including loading, unloading and haulage
89.15
-
-
Plain Cement Concrete M10 (1:3:6 nominal size) in leveling course below open foundation of head walls as per drawings and Technical Specification Clause1109. including loading, unloading and haulage
6.9
-
-
Boulders filling with stones/boulders of 150 - 200 mm size, 60 cm wide behind the abutments, wing walls, retaining walls etc. (supply and carriage of boulders within 200 m is also included) complete as per Technical Specifications. including loading, unloading and haulage
18.88
-
-
Back fillling in foundation trenches as per drawing and technical specification Clause 305.3.9 II. Earth filling (For Marshy Soil). including loading, unloading and haulage
14.77
-
-
Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204 including loading, unloading and haulage
42.37
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements