Meghalaya Basin Development Authority Tender

View complete overview of Meghalaya MBDA Tender

Meghalaya Basin Development Authority - MBDA Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date29 Oct 2022
Closing Date4 Nov 2022
Tender Amount₹ 43,00,000 
Notes
Download

Costs

Summary

Fdr Nc To Rongara Siju Via Akimpal Road 0 To 14th Km For The Year 2022 To 23 Under Baghmara Division

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Tack Coat: Providing and applying tack coat with Bitumen emulsion using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503

2700

-

-

... More
20mm thick Open-Graded Premix Carpet Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static rollar capacity, finished to requir level and grades to be followed by seal coat

2700

-

-

... More
Seal Coat: Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510

2700

-

-

... More
Loading and unloading of stone boulder/ stone aggregates / sand / kankar / moorum. ( Placing tripper at loading point, loading with front end loader,dumping,tuming for return trip,excluding time for houlage and return trip)

332.1

-

-

... More
Bitumin: Loading and unloading of Cement or Steel or Bitumin by Manual Means and stacking.

8.68

-

-

... More
Haulage excluding Loading & Unloading

-

-

-

... More
Surface Road: Stone & Aggregates

40250.52

-

-

... More
Surface Road: Bitumin

2630.04

-

-

... More
Construction of Breast Wall, L=41.7m, Ht= 2.0m Retaining Wall, L= 24.10m, Ht= 2.50m

-

-

-

... More
Construction of retaining walls/breast walls in cement mortar 1:5 as per drawing and technical specifications

-

-

-

... More
i Earthwork in excavation for structures.

111.42

-

-

... More
ii Plain Cement Concrete M-10

15.44

-

-

... More
iii Stone masonry in cement mortar 1:5

217.59

-

-

... More
v PCC Coping M-20 on top of B/wall

65.8

-

-

... More
vi Filter material behind retaining wall as per specification in a width of 600mm

43.1

-

-

... More
Pointing with cement mortar 1:3 as per technical specification

197.01

-

-

... More
Providing weep holes in brick masonry/ plain/ reinforced concrete abutment, wingwall/ return wall with 100mm dia AC pipe, extending through the full width of the structure with slope of 1V:20H towards drawing foce complete as per drawing and technical specification.

53

-

-

... More
Loading and unloading of stone boulder/ stoneaggregates / sand / kankar / moorum. ( Placing tripperat loading point, loading with front end loader, dumping, tuming for return trip,excluding time for haulage and return trip)

434.08

-

-

... More
Haulage of materials by tipper excluding cost of loading, unloading and stacking.

-

-

-

... More
Stone : Case-I Surface road

38736.24

-

-

... More
Case-III Kutcha road

3922.08

-

-

... More
Sand : Case-I Surface road

514.06

-

-

... More
Sand : Case-III Kutcha road

1372.01

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.