Meghalaya Basin Development Authority Tender
View complete overview of Meghalaya MBDA Tender
Meghalaya Basin Development Authority - MBDA Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date29 Oct 2022
Closing Date4 Nov 2022
Tender Amount₹ 43,00,000
Costs
EMD
₹ 86,000Document Cost
₹ 500Tender Fee
Refer Documents
Summary
Fdr Nc To Rongara Siju Via Akimpal Road 0 To 14th Km For The Year 2022 To 23 Under Baghmara Division
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_MIDFC_1315_1Bid Award Id
ViewTender No
PW/EE/Bagh/Com-355/R-4/1060Tender Authority
Meghalaya Basin Development Authority ViewPurchaser Address
-Website
http://https://mbda.gov.in/roads
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Tack Coat: Providing and applying tack coat with Bitumen emulsion using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503
2700
-
-
... More
20mm thick Open-Graded Premix Carpet Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static rollar capacity, finished to requir level and grades to be followed by seal coat
2700
-
-
... More
Seal Coat: Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510
2700
-
-
... More
Loading and unloading of stone boulder/ stone aggregates / sand / kankar / moorum. ( Placing tripper at loading point, loading with front end loader,dumping,tuming for return trip,excluding time for houlage and return trip)
332.1
-
-
... More
Bitumin: Loading and unloading of Cement or Steel or Bitumin by Manual Means and stacking.
8.68
-
-
... More
Haulage excluding Loading & Unloading
-
-
-
... More
Surface Road: Stone & Aggregates
40250.52
-
-
... More
Surface Road: Bitumin
2630.04
-
-
... More
Construction of Breast Wall, L=41.7m, Ht= 2.0m
Retaining Wall, L= 24.10m, Ht= 2.50m
-
-
-
... More
Construction of retaining walls/breast walls in cement mortar 1:5 as per drawing and technical specifications
-
-
-
... More
i Earthwork in excavation for structures.
111.42
-
-
... More
ii Plain Cement Concrete M-10
15.44
-
-
... More
iii Stone masonry in cement mortar 1:5
217.59
-
-
... More
v PCC Coping M-20 on top of B/wall
65.8
-
-
... More
vi Filter material behind retaining wall as per specification in a width of 600mm
43.1
-
-
... More
Pointing with cement mortar 1:3 as per technical specification
197.01
-
-
... More
Providing weep holes in brick masonry/ plain/ reinforced concrete abutment, wingwall/ return wall with 100mm dia AC pipe, extending through the full width of the structure with slope of 1V:20H towards drawing foce complete as per drawing and technical specification.
53
-
-
... More
Loading and unloading of stone boulder/ stoneaggregates / sand / kankar / moorum. ( Placing tripperat loading point, loading with front end loader, dumping, tuming for return trip,excluding time for haulage and return trip)
434.08
-
-
... More
Haulage of materials by tipper excluding cost of loading, unloading and stacking.
-
-
-
... More
Stone : Case-I Surface road
38736.24
-
-
... More
Case-III Kutcha road
3922.08
-
-
... More
Sand : Case-I Surface road
514.06
-
-
... More
Sand : Case-III Kutcha road
1372.01
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements