Meghalaya Basin Development Authority Tender
View complete overview of Meghalaya MBDA Tender
Meghalaya Basin Development Authority - MBDA Tender
Civil And Construction
Road Construction
Eprocure
Opening Date26 Oct 2022
Closing Date1 Nov 2022
Tender Amount₹ 37,80,015
Costs
EMD
₹ 75,600Document Cost
₹ 1,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_MIDFC_1304_1Bid Award Id
ViewTender No
PW/EE/AMT/WB/CERC/2022/1775CTender Authority
Meghalaya Basin Development Authority ViewPurchaser Address
-Website
http://https://mbda.gov.in/roads
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
PCC 1:3:6 in Foundation
4.13
-
-
... More
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications
86.11
-
-
... More
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and technical specification.
30.38
-
-
... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe
18
-
-
... More
Haulage excluding Loading & Unloading
-
-
-
... More
A. Carriage of Stone,Chips etc.(As per analysis)
135.11
-
-
... More
B. Carriage of sand (As per analysis)
107.78
-
-
... More
R Wall
-
-
-
... More
Excavation for Structures
25.66
-
-
... More
PCC 1:3:6 in Foundation
5
-
-
... More
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications
87.34
-
-
... More
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and technical specification.
40
-
-
... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe
28
-
-
... More
Haulage excluding Loading & Unloading
-
-
-
... More
A. Carriage of Stone,Chips etc.(As per analysis)
138.21
-
-
... More
B. Carriage of sand (As per analysis)
128.48
-
-
... More
GAROBADHA BETASING RANGSAKONA ROAD
-
-
-
... More
R Wall
-
-
-
... More
Excavation for Structures
23.79
-
-
... More
PCC 1:3:6 in Foundation
5.3
-
-
... More
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications
44.05
-
-
... More
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and technical specification.
27.62
-
-
... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe
21.66
-
-
... More
Haulage excluding Loading & Unloading
-
-
-
... More
A. Carriage of Stone,Chips etc.(As per analysis)
73.71
-
-
... More
B. Carriage of sand (As per analysis)
82.34
-
-
... More
R Wall
-
-
-
... More
Excavation for Structures
23.79
-
-
... More
PCC 1:3:6 in Foundation
5.38
-
-
... More
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications
49.25
-
-
... More
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and technical specification.
28.05
-
-
... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe
19.63
-
-
... More
Haulage excluding Loading & Unloading
-
-
-
... More
A. Carriage of Stone,Chips etc.(As per analysis)
81.62
-
-
... More
B. Carriage of sand (As per analysis)
85.88
-
-
... More
GAROBADHA AMPATI ROAD, CHAINAGE- 5570 Mts
-
-
-
... More
Breast Wall
-
-
-
... More
Excavation for Structures
23
-
-
... More
PCC 1:3:6 in Foundation
5.18
-
-
... More
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications
69.14
-
-
... More
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and technical specification.
27.02
-
-
... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe
19
-
-
... More
Haulage excluding Loading & Unloading
-
-
-
... More
A. Carriage of Stone,Chips etc.(As per analysis)
111.17
-
-
... More
B. Carriage of sand (As per analysis)
93.6
-
-
... More
BETASING MELLIM ROAD, CHAINAGE- 5980 Mts, 6205 mts, 6790 mts, 7860 mts, 18110 mts
-
-
-
... More
Breast Wall
-
-
-
... More
Excavation for Structures
75.55
-
-
... More
PCC 1:3:6 in Foundation
11.7
-
-
... More
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications
188.93
-
-
... More
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and technical specification.
82.11
-
-
... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe
32
-
-
... More
Haulage excluding Loading & Unloading
-
-
-
... More
A. Carriage of Stone,Chips etc.(As per analysis)
300.24
-
-
... More
B. Carriage of sand (As per analysis)
269.92
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements