Meghalaya Basin Development Authority Tender
View complete overview of Meghalaya MBDA Tender
Meghalaya Basin Development Authority - MBDA Tender
Civil And Construction
Road Construction
Eprocure
Opening Date12 Oct 2022
Closing Date19 Oct 2022
Tender Amount₹ 99,98,000
Costs
EMD
₹ 1,99,960Document Cost
₹ 2,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_MIDFC_676_1Bid Award Id
ViewTender No
PW/EE/KH/WB/CERC/1/2022/3Tender Authority
Meghalaya Basin Development Authority ViewPurchaser Address
-Website
http://https://mbda.gov.in/roads
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
5.3 (i) Providing and applying tack coat with penetration grade bitumen (S-90) using bitument pressure distributor at the specific rate of 0.50 kg/sqm on the prepared WBM …..asper technical specification clause 503.
594
-
-
... More
5.11) Providing, laying and rolling of open-graded premix surfacing material of 20mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitument or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheeled roller 80 - 100 kn static roller capacity, finished to required level and grade. ( Including Loading , Unloading & Cost of Haulage) Case I-By manual means.
594
-
-
... More
5.14) Providing and laying seal coat sealling the voids in a bituminous surface laid to the specified level, grade and cross fall using type-A,Type-B, and type-C asper technical specification clause 510.
( Including Loading , Unloading & Cost of Haulage) By manual means.
594
-
-
... More
Construction of Retaining Wall at 24th DSSMH Road ( Ch:23415.00-23445.00m)
-
-
-
... More
8.4 i) Earthwork in excavation of foundation …complete.
85.31
-
-
... More
8.4 (iii) Stone masonry work in cement mortar 1:5 …complete( Including Loading, Unloading & Cost of haulage)
246.29
-
-
... More
8.4(vii) (I) Back filling behind R/wall, B/wall…….complete( Including Loading, Unloading & Cost of haulage).
84.6
-
-
... More
12.20). Providing 12mm thick cement plastering in cement mortar 1:3 ..complete( Including Loading, Unloading & Cost of haulage).
36.72
-
-
... More
Construction of Retaining Wall at 24th DSSMH Road ( Ch:23910.00-23941.00m)
-
-
-
... More
8.4 i) Earthwork in excavation of foundation …complete.
86.96
-
-
... More
8.4 (iii) Stone masonry work in cement mortar 1:5 …complete( Including Loading, Unloading & Cost of haulage)
248.74
-
-
... More
8.4(vii) (I) Back filling behind R/wall, B/wall…….complete( Including Loading, Unloading & Cost of haulage).
85.56
-
-
... More
12.20). Providing 12mm thick cement plastering in cement mortar 1:3 ..complete( Including Loading, Unloading & Cost of haulage).
42.84
-
-
... More
Construction of Retaining Wall at 37th Km DSSMH Road.
-
-
-
... More
8.4 i) Earthwork in excavation of foundation …complete.
69.69
-
-
... More
8.4 (ii) Plain cement concrete M10 grade( Including Loading, Unloading & Cost of haulage)
8.71
-
-
... More
8.4 (iii) Stone masonry work in cement mortar 1:5 …complete( Including Loading, Unloading & Cost of haulage)
209.93
-
-
... More
8.4(iv) Filter materials behind R/wall ( Including Loading, Unloading & Cost of haulage).
70.45
-
-
... More
9.13). Plastering with cement mortar (1:4) 15mm thick( Including Loading, Unloading & Cost of haulage).
20.16
-
-
... More
Construction of Retaining Wall at 43rd Km DSSMH Road ( Ch: 380.00 m)
-
-
-
... More
8.4 i) Earthwork in excavation of foundation …complete.
39.6
-
-
... More
8.4 (ii) Plain cement concrete M10 grade( Including Loading, Unloading & Cost of haulage)
5.4
-
-
... More
8.4 (iii) Stone masonry work in cement mortar 1:5 …complete( Including Loading, Unloading & Cost of haulage)
130.41
-
-
... More
8.4(iv) Filter materials behind R/wall ( Including Loading, Unloading & Cost of haulage).
32.4
-
-
... More
9.13). Plastering with cement mortar (1:4) 15mm thick( Including Loading, Unloading & Cost of haulage).
10.08
-
-
... More
Construction of Breast Wall at 37th Km DSSMH Road
-
-
-
... More
8.4 i) Earthwork in excavation of foundation …complete.
52.65
-
-
... More
8.4 (ii) Plain cement concrete M10 grade( Including Loading, Unloading & Cost of haulage)
5.4
-
-
... More
8.4 (iii) Stone masonry work in cement mortar 1:5 …complete( Including Loading, Unloading & Cost of haulage)
63
-
-
... More
8.4(iv) Filter materials behind R/wall ( Including Loading, Unloading & Cost of haulage).
27
-
-
... More
Construction of damaged HPC at 43rd km (Ch:-350.00m)
-
-
-
... More
9.1(i) Earthwork in excavation for foundation upto 3.00m depth as per drawing and technical specification.
45.86
-
-
... More
9.2) Bedding for pipes 1. Type A (Concrete Cradle) Bedding
2.81
-
-
... More
9.3) Providing and laying Reinforced cement concrete pipesNP3 for culvert on first class bedding of granular material in single row.--etc
( Including Loading, Unloading & Cost of haulage)
7.5
-
-
... More
9.9) Plain cement concrete M10 (1:3:6) (Nomonal size in levelling course---etc( Including Loading, Unloading & Cost of haulage)
1.87
-
-
... More
9.11)Stone masonry work in cement mortar in foundation as per drawing and technical specification----etc. ( Including Loading, Unloading & Cost of haulage)
34.36
-
-
... More
9.14) Back filling in foundation trenches as per drawing and technical specification( Including Loading, Unloading & Cost of haulage)
18.36
-
-
... More
Boulder filling with stone /boulder of 150to200 mm size 60 cm wide behind abutment wing wall retaing wall etc ( Including Loading, Unloading & Cost of haulage).
3.24
-
-
... More
9.13). Plastering with cement mortar (1:4) 15mm thick( Including Loading, Unloading & Cost of haulage).