Meghalaya Basin Development Authority Tender

View complete overview of Meghalaya MBDA Tender

Meghalaya Basin Development Authority - MBDA Tender

Works
Civil And Construction
Bridge Construction
Eprocure
Opening Date12 Oct 2022
Closing Date18 Oct 2022
Tender Amount₹ 1,73,01,791 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
WBM Grading 3 (A).By Manual Means

355.82

-

4156

... More
Haulage of materials by tipper excluding cost of loading, unloading and stacking.

-

-

-

... More
For Chips and Metal -

-

-

-

... More
Kutcha Road

1095.53

-

16.4

... More
Surfaced Road

92024.1

-

6.8

... More
For GSB

-

-

-

... More
Case-I : Surfaced Road

15876.4

-

6.8

... More
Case-III: Kutcha Track

189

-

16.4

... More
For Binding materials

-

-

-

... More
Case-I : Surfaced Road

350.4

-

6.8

... More
Case-III: Kutcha Track

87.6

-

16.4

... More
RETAINING WALL AT 18TH KM HEIGHT=3.00 M LENGTH=15.00 M

-

-

-

... More
Construction of retaining walls/breast walls in cement mortar 1:5 as per drawing and technical specifications Clause 1604

-

-

-

... More
(i) Earthwork in excavation for structure

65.66

-

354

... More
Plain Cement Concrete M10 (1:3:6 nominal mix) in levelling course below open foundation of Head walls as per drawings & Technical Specification Clause 1109

-

-

-

... More
(ii) P.C.C. M-10

2.71

-

7452

... More
Construction of retaining walls/breast walls in cement mortar 1:5 as per drawing and technical specifications Clause 1604

-

-

-

... More
(iii) Stone masonry in cement mortar 1:5

67.13

-

5557

... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications

28

-

525

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification

-

-

-

... More
A Granular Material

45

-

1452

... More
Filter material behind retaining wall / breast wall as per Specification 1204.3.8 in a width of 600 m

13.5

-

1944

... More
Haulage of materials by tipper excluding cost of loading, unloading and stacking.

-

-

-

... More
For Sand

-

-

-

... More
Case-I : Surfaced Road

1031.04

-

6.8

... More
Case-III: Kutcha Track

34.37

-

16.4

... More
For Stone

-

-

-

... More
Case-I : Surfaced Road

17061.6

-

6.8

... More
Case-III: Kutcha Track

227.49

-

16.4

... More
RETAINING WALL AT 21ST KM HEIGHT=3.50 M LENGTH=45.00 M

-

-

-

... More
Construction of retaining walls/breast walls in cement mortar 1:5 as per drawing and technical specifications Clause 1604

-

-

-

... More
(i) Earthwork in excavation for structure

265.71

-

354

... More
Plain Cement Concrete M10 (1:3:6 nominal mix) in levelling course below open foundation of Head walls as per drawings & Technical Specification Clause 1109

-

-

-

... More
(ii) P.C.C. M-10

8.79

-

7452

... More
Construction of retaining walls/breast walls in cement mortar 1:5 as per drawing and technical specifications Clause 1604

-

-

-

... More
(iii) Stone masonry in cement mortar 1:5

250.43

-

5557

... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications

88

-

525

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification

-

-

-

... More
A Granular Material

157.5

-

1452

... More
Filter material behind retaining wall / breast wall as per Specification 1204.3.8 in a width of 600 m

47.25

-

1944

... More
Haulage of materials by tipper excluding cost of loading, unloading and stacking.

-

-

-

... More
For Sand

-

-

-

... More
Case-I : Surfaced Road

4231.39

-

6.8

... More
Case-III: Kutcha Track

128.22

-

16.4

... More
For Stone

-

-

-

... More
Case-I : Surfaced Road

64383.9

-

6.8

... More
Case-III: Kutcha Track

827.42

-

16.4

... More
RETAINING WALL AT 24TH KM HEIGHT=3.50 M LENGTH=30.00 M

-

-

-

... More
Construction of retaining walls/breast walls in cement mortar 1:5 as per drawing and technical specifications Clause 1604

-

-

-

... More
(i) Earthwork in excavation for structure

206.93

-

354

... More
Plain Cement Concrete M10 (1:3:6 nominal mix) in levelling course below open foundation of Head walls as per drawings & Technical Specification Clause 1109

-

-

-

... More
(ii) P.C.C. M-10

6.85

-

7452

... More
Construction of retaining walls/breast walls in cement mortar 1:5 as per drawing and technical specifications Clause 1604

-

-

-

... More
(iii) Stone masonry in cement mortar 1:5

194.82

-

5557

... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications

68

-

525

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification

-

-

-

... More
A Granular Material

122.5

-

1452

... More
Filter material behind retaining wall / breast wall as per Specification 1204.3.8 in a width of 600 m

36.75

-

1944

... More
Haulage of materials by tipper excluding cost of loading, unloading and stacking.

-

-

-

... More
For Sand

-

-

-

... More
Case-I : Surfaced Road

3590.78

-

6.8

... More
Case-III: Kutcha Track

99.74

-

16.4

... More
For Stone

-

-

-

... More
Case-I : Surfaced Road

51892.8

-

6.8

... More
Case-III: Kutcha Track

643.63

-

16.4

... More
RETAINING WALL AT 25TH KM HEIGHT=3.20 M LENGTH=47.00 M

-

-

-

... More
Construction of retaining walls/breast walls in cement mortar 1:5 as per drawing and technical specifications Clause 1604

-

-

-

... More
(i) Earthwork in excavation for structure

222.57

-

354

... More
Plain Cement Concrete M10 (1:3:6 nominal mix) in levelling course below open foundation of Head walls as per drawings & Technical Specification Clause 1109

-

-

-

... More
(ii) P.C.C. M-10

8.36

-

7452

... More
Construction of retaining walls/breast walls in cement mortar 1:5 as per drawing and technical specifications Clause 1604

-

-

-

... More
(iii) Stone masonry in cement mortar 1:5

221.03

-

5557

... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications

88

-

525

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification

-

-

-

... More
A Granular Material

144

-

1452

... More
Filter material behind retaining wall / breast wall as per Specification 1204.3.8 in a width of 600 m

43.2

-

1944

... More
Haulage of materials by tipper excluding cost of loading, unloading and stacking.

-

-

-

... More
For Sand

-

-

-

... More
Case-I : Surfaced Road

4187.22

-

6.8

... More
Case-III: Kutcha Track

113.17

-

16.4

... More
For Stone

-

-

-

... More
Case-I : Surfaced Road

60396.7

-

6.8

... More
Case-III: Kutcha Track

740.5

-

16.4

... More
RETAINING WALL AT 26TH KM HEIGHT=3.50 M LENGTH=35.00 M

-

-

-

... More
Construction of retaining walls/breast walls in cement mortar 1:5 as per drawing and technical specifications Clause 1604

-

-

-

... More
(i) Earthwork in excavation for structure

206.93

-

354

... More
Plain Cement Concrete M10 (1:3:6 nominal mix) in levelling course below open foundation of Head walls as per drawings & Technical Specification Clause 1109

-

-

-

... More
(ii) P.C.C. M-10

6.85

-

7452

... More
Construction of retaining walls/breast walls in cement mortar 1:5 as per drawing and technical specifications Clause 1604

-

-

-

... More
(iii) Stone masonry in cement mortar 1:5

194.82

-

5557

... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications

68

-

525

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification

-

-

-

... More
A Granular Material

122.5

-

1452

... More
Filter material behind retaining wall / breast wall as per Specification 1204.3.8 in a width of 600 m

36.75

-

1944

... More
Haulage of materials by tipper excluding cost of loading, unloading and stacking.

-

-

-

... More
For Sand

-

-

-

... More
Case-I : Surfaced Road

3790.27

-

6.8

... More
Case-III: Kutcha Track

99.74

-

16.4

... More
For Stone

-

-

-

... More
Case-I : Surfaced Road

53099.6

-

6.8

... More
Case-III: Kutcha Track

643.63

-

16.4

... More
RETAINING WALL AT 27TH KM HEIGHT=3.50 M LENGTH=55.00 M

-

-

-

... More
Construction of retaining walls/breast walls in cement mortar 1:5 as per drawing and technical specifications Clause 1604

-

-

-

... More
(i) Earthwork in excavation for structure

324.49

-

354

... More
Plain Cement Concrete M10 (1:3:6 nominal mix) in levelling course below open foundation of Head walls as per drawings & Technical Specification Clause 1109

-

-

-

... More
(ii) P.C.C. M-10

10.74

-

7452

... More
Construction of retaining walls/breast walls in cement mortar 1:5 as per drawing and technical specifications Clause 1604

-

-

-

... More
(iii) Stone masonry in cement mortar 1:5

306.03

-

5557

... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications

108

-

525

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification

-

-

-

... More
A Granular Material

192.5

-

1452

... More
Filter material behind retaining wall / breast wall as per Specification 1204.3.8 in a width of 600 m

57.75

-

1944

... More
Haulage of materials by tipper excluding cost of loading, unloading and stacking.

-

-

-

... More
For Sand

-

-

-

... More
Case-I : Surfaced Road

6110.83

-

6.8

... More
Case-III: Kutcha Track

156.69

-

16.4

... More
For Stone

-

-

-

... More
Case-I : Surfaced Road

84372

-

6.8

... More
Case-III: Kutcha Track

1011.2

-

16.4

... More
RETAINING WALL AT 28TH KM HEIGHT=3.50 M LENGTH=60.00 M

-

-

-

... More
Construction of retaining walls/breast walls in cement mortar 1:5 as per drawing and technical specifications Clause 1604

-

-

-

... More
(i) Earthwork in excavation for structure

319.65

-

354

... More
Plain Cement Concrete M10 (1:3:6 nominal mix) in levelling course below open foundation of Head walls as per drawings & Technical Specification Clause 1109

-

-

-

... More
(ii) P.C.C. M-10

10.93

-

7452

... More
Construction of retaining walls/breast walls in cement mortar 1:5 as per drawing and technical specifications Clause 1604

-

-

-

... More
(iii) Stone masonry in cement mortar 1:5

311.78

-

5557

... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications

110

-

525

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification

-

-

-

... More
A Granular Material

196

-

1452

... More
Filter material behind retaining wall / breast wall as per Specification 1204.3.8 in a width of 600 m

58.8

-

1944

... More
Haulage of materials by tipper excluding cost of loading, unloading and stacking.

-

-

-

... More
For Sand

-

-

-

... More
Case-I : Surfaced Road

6385.28

-

6.8

... More
Case-III: Kutcha Track

159.63

-

16.4

... More
For Stone

-

-

-

... More
Case-I : Surfaced Road

86902.2

-

6.8

... More
Case-III: Kutcha Track

1029.95

-

16.4

... More
CONSTRUCTION OF SINGLE OPENING HUE PIPE CULVERTS AT DIFFERENT CHAINAGES(4Nos.Culvert)

-

-

-

... More
Earthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification Clause 1104 includding setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.

137.21

-

354

... More
Bedding for Pipe Type A (Concrete Cradle) Bedding

-

-

-

... More
Laying concrete cradle bedding with M15 Grade Cement Concrete as per Clause 1105 (i)

17.96

-

6666

... More
Plain Cement Concrete M10 (1:3:6 nominal mix) in levelling course below open foundation of Head walls as per drawings & Technical Specification Clause 1109

10.37

-

7452

... More
Stone Masonry Work in cement mortar in foundation of Head walls complete as per drawing and technical specification Clasue 1109

123.85

-

4634

... More
Backfilling in Foundation Trenches as per drawing and technical specification Clause 1108

29.62

-

1452

... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106.

40

-

8860

... More
Plastering with Cement Mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification

69.24

-

303

... More
Backfilling in Foundation Trenches as per drawing and technical specification Clause 1108

137.2

-

232

... More
Haulage excluding Loading & Unloading

-

-

-

... More
For Stone

-

-

-

... More
Case-I : Surfaced Road

30699.14

-

6.8

... More
Case-III: Kutcha Track

361.17

-

16.4

... More
For Sand

-

-

-

... More
Case-I : Surfaced Road

2153.94

-

6.8

... More
Case-III: Kutcha Track

89.75

-

16.4



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.