Meghalaya Basin Development Authority Tender
View complete overview of Meghalaya MBDA Tender
Meghalaya Basin Development Authority - MBDA Tender
Civil And Construction
Bridge Construction
Eprocure
Opening Date12 Oct 2022
Closing Date19 Oct 2022
Tender Amount₹ 99,32,298
Costs
EMD
₹ 1,98,646Document Cost
₹ 500Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_MIDFC_757_1Bid Award Id
ViewTender No
RKD/TB/WB/CERC/1/2022/03Tender Authority
Meghalaya Basin Development Authority ViewPurchaser Address
-Website
http://https://mbda.gov.in/roads
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
I) Ordinary soil (i) (upto 3m without dewatering)
33.01
-
-
... More
II) Orinary rock (Not requiring blasting) upto 3m depth without dewatering)
49.52
-
-
... More
Providing concrete for Plain/Reinforced cement concrete, in open foundation complete as per drawing and technical specification (MoRT & H specification section 1500 ,1700,2100)
I) 'PCC Grade M10 (i) Nominial mix 1:3:6 including loading, unloading and haulage of materials.
38.87
-
-
... More
Plain/Reinforced cement concrete, in sub structure complete as per drawing and technical specification including loading, unloading and haulage of materials.
III.P.C.C Grade M20 (1:1.5:3) (ii) Above 5m upto 10 m
493.26
-
-
... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure including splicing complete as per drawing and technical specifications.
(b) Tor steel
2.13
-
-
... More
PCC M15 concrete odinary Grade(1:2;4) leveling course below approach slab complete as per drawing and Technical specification including loading, unloading and haulage of materials.
A) P.C.C. grade M15 (ii) Nominal mix 1:2:4
5.4
-
-
... More
Providing Reinforced cement concrete M25 approach slab including reinforcement and formwork complete as per drawing and Technical specification. including loading, unloading and haulage of materials.
10.8
-
-
... More
Supplying, Fitting and Placing HYSD bar Reinforcement in substructure complete as per Drawing and Technical Specifications.
1.84
-
-
... More
Plain/Reinforce cement structure completes as per drawing and technical specification etc including loading, unloading and haulage of materials.
VI) RCC Grade M25 (i) Height up to 5 m
77.67
-
-
... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
48
-
-
... More
Boulders fiiling with unsized stone/boulders of one man size 60cm wide behind the abutment, w/wall, R/wall etc . including loading, unloading and haulage of materials.
59.05
-
-
... More
Backfilling behind abutment, wing wall and return wall complete as per drawing and Technical Specifications clause 1204.3.8 including loading, unloading and haulage of materials.
18.05
-
-
... More
Construction of Return Wall:Construction of Retaining Wall /breast wall in cement mortar 1:5 as per drawing and Technical Specification Clause 1604.
-
-
-
... More
(A) Earthworkin excavation for structures .
II. Orinary rock (not required blasting)
25.2
-
-
... More
(B) Plain Cement Concrete M10 grade (ii) Nominal Mix 1:3:6 (hand mixing)
3.53
-
-
... More
C) Stone mansonry in cement mortar 1:5.Course Rubble masonry (1st sort) in cement mortar 1:5
50.78
-
-
... More
(F) Filter materials behind Retaining wall as per technical spcification clause.
20.25
-
-
... More
Construction of embankment with Materials obtained from borrow pits.
16.88
-
-
... More
Providing 12mm thick cement plastering in 1:3 including cleaning of the surface curing --- etc --- complete.In cement mortar 1:3
10.44
-
-
... More
ENVIRONMENTAL MANAGEMENT PLAN (EMP)
-
-
-
... More
Air: Springling of water in the settlement and working areas as per instruction and directed by the Engnineers incharge during the stage of construction
6
-
-
... More
Water quality: At locations specified in the monitoring plan as per IS10,500 and IS2296
12
-
-
... More
Noise: At equipment yards as directed by the Engineer as per CPCB guideline 1989
3
-
-
... More
Conservation Biodiversity:
-
-
-
... More
i) Pre-construction fish species survey in river stream
1
-
-
... More
ii) Provision of protection net for fish species to stop coming in bridge construction zone
80
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements