Public Works Department Tender

View complete overview of Manipur PWD Tender

Public Works Department - PWD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date13 Jan 2024
Closing DateCancelled
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earthwork in excavation by mechanical means (Hydraulic Excavator)/ Manaual Means in foundation trenches or draina (not exceeding 1.5m in width or 10sqm on plan) including dressing of sides and Ramming of bottom lift upto 1.50m including getting out the excavated soil as directed within a lead of 50m. 2.8.1 All a lead soil.

107.18

-

-

... More
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50m and lift upto 1.50m)

43.77

-

-

... More
PCCC 1:3:6 in foundation (Plain Cement Concrete : 3.6 mix with crushed stone aggregate 40.00mm foundation and compacted by vibration including curing for 14 days)

52.8

-

-

... More
Laying Reinforced Cement Concrete Pipe NP4/ Prestresses concrete pipe on first class bedding in single row. ( Laying Reinforced cement pipe NP4 / Prestrssed concrete pipe for culverts on first class bedding on granular materials in single row including collar with cement mortar 1:2 but excluding protection works, backfilling, concrete and masonry works in head walls and parapets) NP-3 (ii) 900 mm

18

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.